• Title/Summary/Keyword: Calculation Time Delay

Search Result 174, Processing Time 0.026 seconds

Characterization of the Dependence of Interconnect Line-Induced Delay Time on Gate Width in ${\mu}m$ CMOS Technology ($0.18{\mu}m$ CMOS Technology에 인터커넥트 라인에 의한 지연시간의 게이트 폭에 대한 의존성 분석)

  • Jang, Myung-Jun;Lee, Hi-Deok
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.37 no.11
    • /
    • pp.1-8
    • /
    • 2000
  • In this paper, the dependence of interconnect line-induced delay time on the size of CMOSFET gate width is characterized. In case of capacitance dominant interconnect line, the total delay time decreases as transistor size increases. However, there exists a transistor size for minimum total delay time when both of resistance and capacitance of interconnect line become larger than those of transistor. The optimum transistor size for minimum total delay time is obtained using an analytic equation and the experimental results showed good agreement with the calculation.

  • PDF

Risk Evaluation of Failure Cause for FMEA under a Weibull Time Delay Model (와이블 지연시간 모형 하에서의 FMEA를 위한 고장원인의 위험평가)

  • Kwon, Hyuck Moo;Lee, Min Koo;Hong, Sung Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.3
    • /
    • pp.83-91
    • /
    • 2018
  • This paper suggests a weibull time delay model to evaluate failure risks in FMEA(failure modes and effects analysis). Assuming three types of loss functions for delayed time in failure cause detection, the risk of each failure cause is evaluated as its occurring frequency and expected loss. Since the closed form solution of the risk metric cannot be obtained, a statistical computer software R program is used for numerical calculation. When the occurrence and detection times have a common shape parameter, though, some simple results of mathematical derivation are also available. As an enormous quantity of field data becomes available under recent progress of data acquisition system, the proposed risk metric will provide a more practical and reasonable tool for evaluating the risks of failure causes in FMEA.

Real-time Sound Localization Using Generalized Cross Correlation Based on 0.13 ㎛ CMOS Process

  • Jin, Jungdong;Jin, Seunghun;Lee, SangJun;Kim, Hyung Soon;Choi, Jong Suk;Kim, Munsang;Jeon, Jae Wook
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.14 no.2
    • /
    • pp.175-183
    • /
    • 2014
  • In this paper, we present the design and implementation of real-time sound localization based on $0.13{\mu}m$ CMOS process. Time delay of arrival (TDOA) estimation was used to obtain the direction of the sound signal. The sound localization chip consists of four modules: data buffering, short-term energy calculation, cross correlation, and azimuth calculation. Our chip achieved real-time processing speed with full range ($360^{\circ}$) using three microphones. Additionally, we developed a dedicated sound localization circuit (DSLC) system for measuring the accuracy of the sound localization chip. The DSLC system revealed that our chip gave reasonably accurate results in an experiment that was carried out in a noisy and reverberant environment. In addition, the performance of our chip was compared with those of other chip designs.

A Switch-Level CMOS Delay Time Modeling and Parameter Extraction (스위치 레벨 CMOS 지연시간 모델링과 파라미터 추출)

  • 김경호;이영근;이상헌;박송배
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.28A no.1
    • /
    • pp.52-59
    • /
    • 1991
  • An effective and accurate delay time model is the key problem in the simulation and timing verification of CMOS logic circuits. We propose a semi-analytic CMOW delay time model taking into account the configuration ratio, the input waveform slope and the load capacitance. This model is based on the Schichman Hodges's DC equations and derived on the optimally weighted switching peak current. The parameters necessary for the model calculation are automatically determined from the program. The proposed model is computationally effective and the error is typically within 10% of the SPICEA results. Compared to the table RC model, the accuracy is inproved over two times in average.

  • PDF

Speed Controller Design Based on Current Controller Dynamics for Industry Servo Applications (전류제어기 동특성을 고려한 산업용 서보 구동시스템의 속도제어기 설계)

  • Seok Jul-Ki;Lee Dong-Choon
    • Proceedings of the KIPE Conference
    • /
    • 2002.07a
    • /
    • pp.166-169
    • /
    • 2002
  • The purpose of this paper is to develop systematic analysis and automatic tuning rule of PID controller for industry servo applications. Considering the coupling of inner current control loop and speed loop delay, the target plant fit into second-order plus time delay model. Based on PID controller design for high-order plus known/unknown time delay plant model, some formulars are provided for the control gain calculation and system-based theoretical analysis is developed, and it also allows an automatic controller setup to benefit the inexperienced user. In addition, the proposed design rule gives uniformly satisfactory performance and the motor speed stays on a desired response curve with minimal oscillation and settling time. This approach can be applicable in conjunction with the cascaded control loop which is widely used in practice.

  • PDF

The study on the Intelligent Control of Robot using Fuzzy Inverse Kinematics Mapping (Fuzzy Inverse Kinematics Mapping을 이용한 로봇의 지능제어에 관한 연구)

  • 김관형;이상배
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1996.10a
    • /
    • pp.166-171
    • /
    • 1996
  • Generally, when we control the robot, we should calculate exactly Inverse Kinematics. However, Inverse Kinematics calculation is complex and it takes much time for the manipulator to control in real-time. Therefore, the calculation of Inverse Kinematics can result in significant control delay in real time. In this paper, we will present that Inverse Kinematics can be calculated through Fuzzy Logic Mapping, Based on an exact solution through fuzzy reasoning instead of Inverse Kinematics calculation Also, the result provides sufficient precision and transient tracking error can be controlled based on a fuzzy adaptive scheme proposed in this paper. Based on the Denavit-Hartenberg parameters specification, after the Jacobian matrix of arbitrary manipulator is calculated, we will construct Fuzzy Inverse Kinematics Mapping(FIKM) using fuzzy logic and represent a good control efficiency through simulation of 2-DOF manipulator.

  • PDF

Determination of equivalent blasting load considering millisecond delay effect

  • Song, Zhan-Ping;Li, Shi-Hao;Wang, Jun-Bao;Sun, Zhi-Yuan;Liu, Jing;Chang, Yu-Zhen
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.745-754
    • /
    • 2018
  • In the analysis of the effects of rock tunnel blasting vibration on adjacent existing buildings, the model of simplified equivalent load produces higher calculation result of vibration, due to the lack of consideration of the millisecond delay effect. This paper, based on the static force equivalence principle of blasting load, proposes a new determination method of equivalent load of blasting vibration. The proposed method, based on the elastic-static force equivalence principle of stress wave, equals the blasting loads of several single blastholes in the same section of millisecond blasting to the triangle blasting load curve of the exploded equivalent elastic boundary surface. According to the attenuation law of stress wave, the attenuated equivalent triangle blasting load curve of the equivalent elastic boundary is applied on the tunnel excavation contour surface, obtaining the final applied equivalent load. Taking the millisecond delay time of different sections into account, the time-history curve of equivalent load of the whole section applied on the tunnel excavation contour surface can be obtained. Based on Sailing Tunnel with small spacing on Sanmenxia-Xichuan Expressway, an analysis on the blasting vibration response of the later and early stages of the tunnel construction is carried out through numerical simulation using the proposed equivalent load model considering millisecond delay effect and the simplified equivalent triangle load curve model respectively. The analysis of the numerical results comparing with the field monitoring ones shows that the calculation results obtained from the proposed equivalent load model are closer to the measured ones and more feasible.

A study on robust generalized cross correlation-phase transform based time delay estimation in impulsive noise environment using nonlinear preprocessing and frequency domain low-pass filter (비선형 전처리와 주파수 영역 저역 필터에 의한 임펄스성 잡음 환경에 강인한 위상 변환 일반 상호 상관 시간 지연 추정기 연구)

  • Jun-Seok Lim;Keunwa Lee
    • The Journal of the Acoustical Society of Korea
    • /
    • v.43 no.4
    • /
    • pp.406-413
    • /
    • 2024
  • The proposed method uses Generalized Cross Correlation - Phase Transform (GCC-PHAT) method with nonlinear preprocessing and a frequency domain low-pass filter. In this paper, by reinterpreting the calculation process of GCC-PHAT as DFT, we derive that there is an effective frequency band used for time delay estimation in GCC-PHAT, and by using only the effective band using a low-pass filter, the noise component is reduced and it improvesthe time delay performance in impulsive noise environments. By comparing the proposed method with the traditional GCC-PHAT in an impulsive noise environment, we show that the GCC-PHAT becomes more robust to the impulsive noise.

Development of Task Assignment Strategy for the Optimized Utilization of the Real-time Network System (실시간 네트워크 시스템의 이용률 최적화를 위한 태스크 배치 전략 개발)

  • Oh, Jae-Joon;Kim, Hong-Ryeol;Kim, Dae-Won
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.72-75
    • /
    • 2004
  • In this paper, the task assignment strategy considering communication delay and the priority of distributed tasks is proposed for the real-time network system in order to maximize the utilization of the system. For the task assignment strategy, the relationship among priority of tasks in network nodes, the calculation time of each task, and the end-to-end response time including the network delay is formulated firstly. Then, the task assignment strategy using the genetic algorithm is proposed to optimize the utilization of the system considering the LCM(Least Common Multiple) period. The effectiveness of proposed strategy is proven by the simulation for estimating the performance such as the utilization and the response time of the system in case of changing the number of tasks and the number of network nodes.

  • PDF

Lesson and proposal of revised equations from the Pan method application case for soft clay improvement (PBD 공법 시공사례를 통한 교훈 및 개선안 제안)

  • 유한구;조영묵;김종석;박정규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.147-158
    • /
    • 2001
  • In general, two methods have been used to predict settlement of soft ground. One method is Terzaghi's one dimensional consolidation theory which gives time-settlement relationship using the standard consolidation test results. The other is forecasting method of ground settlement to be occured in the future using in-situ monitoring data. The above both methods have some defects in application manner or in itself especially in very deep and soft clayey ground. In view of the lessons and experiences of soft ground improvement projects, several techniques were proposed for more accurate theorectical calculation of consolidation settlement as follows ; ① Subdivision of soft ground, ② Consideration of secondary compression, ③ Using the modified compression index, etc. And also, revised hyperbolic fitting method was suggested to minimize the error of predicted future settlement. In addition, revised De-Beer equation of immediate settlement of loose sandy soil was proposed to overcome the tendency to show too small settlement calculation results by original De-Deer equation. And also, considering the various effects of settlement delay in the improved ground by vertical drains, time-settlement caculation equation(Onoue method) was revised to match the tendency of settlement delay by using the characteristics of discharge capacity decreases of vertical drain with time elapse by the pattern of hyperbolic equation.

  • PDF