• Title/Summary/Keyword: CV cable

Search Result 63, Processing Time 0.03 seconds

The solution for preventing the expansion of cable joint caused by methane($CH_4$) gas to Water proof type of power cable (도체 수밀형 전력케이블의 가교잔사 가스에 의한 직선접속재 부풀음 현상 방지 대책)

  • Kim, Jong-Won;Lee, Ki-Soo;Paek, Heum-Soo;Choi, Bong-Nam;Park, Hee-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.2020-2022
    • /
    • 2000
  • The cross-linked polyethylene(herein after XLPE) insulated power cable emit the methane($CH_4$)gas in the course of chemical cross-linking process. The general stranded conductor easily discharge this methane gas through the gap of each stranded wires. But the special stranded conductor that filled with semi-conducting rubber compound to prevent water penetration which is applied to water proof type of cable(22.9kV CN/CV-W), disturb the methane gas emission. The pre-mold type cable joint shall be expanded gradually by emit of gas left in XLPE insulation. For example, sometimes the corona problem outbreak on a new power distribution line, resulted from the gap between the sleeve and semi-conductive layer of cable joint. If above mentioned problem especially happened on the way of operating. We have to shut down the line and try to discharge the methane gas in cable joint. In this point, we would like to explain the mechanism of methane gas & cable joint and our test result briefly. At last, we are pleased to introduce the solution for preventing reoccurrence of this problem.

  • PDF

A Study on Neutral Conductor Improvement for 0.6/1kV XLPE insulated Power Cable (배전선로 가공인입 케이블 중성선 운영방법 개선에 관한 연구)

  • Zhang, Jeong-IL
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1473-1474
    • /
    • 2015
  • 0.6/1kV CV 전선은 저압 지중선용 또는 가공저압배전선로 및 복잡한 인입선 정비를 위한 가공인입 간선용으로 사용한다. CV 전선은 내열성이 높고 내약품성 및 내유성이 우수하며 시공에 따른 미관성이 우수하여 가공인입용으로 적용이 증가하는 추세이다.[10] 가공인입용 CV 전선내 전압선과 중성선 단면적은 동일하게 제작, 현장에 적용되고 있다. 본 논문에서는 3상4선식 0.6/1kV CV 전선을 가공인입선에 적용시 중성선의 단면적을 전압선 단면적보다 평균 47%를 축소 개발, 현장에 적용하여 최적으로 중성선을 운영하는 방안을 제시하였다.

  • PDF

A Study on the DC Voltage Withstand test for the Ageing of XLPE Power Cable (직류내전압 시험이 전력케이블(CV) 절연체에 미치는 영향연구)

  • Lee, Jun;Lim, Yong-Bae;Kim, Jong-Seo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 1999.11a
    • /
    • pp.613-616
    • /
    • 1999
  • Polyehtylene[PE] in polymer insulation materials of used power cable have carried out in abundance of experiment and study for electrical conduction, insulation breakdown, dielectric character and so on. when apply to field for power cable to make PE, application of DC withstand test to put in practice for inspection is get to effect accumulated space charge. In this paper, to make use of Pulsed Electro-Acoustic(PEA), It is analysis to take shape space charge under AC and DC, clear up the point at issue for DC withstand test impressing

  • PDF

A Study on unperfected circuiting current of undergrounded cable (지중송전케이블의 불완전 순환전류에 관한 연구)

  • Lee, Kwan-Woo;Lee, Yong-Sung;Kim, Bo-Kyeng;Park, Bok-Ki;Park, Dae-Hee
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2004.05b
    • /
    • pp.3-6
    • /
    • 2004
  • In this paper, we studied on permissible current of unperfected earthing for cross-bond system. The factors of unperfected earth were jacket damage, cross-bonding mistake, arrestor damage, effect of other circuit but we only studied permissible current of arrestor or jacket damage. In the result, we earned that permissible current of normal 154[[kV]] CV $1C{\times}400SQMM$ cable is 760[A] but current of unperfected earthing cable is 76[A], unperfected earthing confirmed that accident of underground cable could occur. So, we could confirmed that Earthing resistance of unperfected earthing need to limit.

  • PDF

A Study on the Optimization of Interfacial Pressure for the Stress Relief Cone in the Ultra-High Voltage Level Prefabricated Type Joint Box (초초고압 CV Cable용(用) 조립형 직선 접속함에서의 Stress Relief Cone 계면압력 최적화에 관한 연구)

  • Baek, J.H.;Baek, S.Y.;Lee, S.K.;Huh, G.D.;Park, W.K.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1614-1616
    • /
    • 1998
  • Insulation performance of major components of prefabricated joint such as epoxy insulation unit and premolded rubber cone are guaranteed by material selection design and proper manufacturing. On the other hand insulation performance of the interfaces between the premolded rubber cone and the epoxy insulation unit and the cable insulation is maintained by keeping the premolded rubber cone to close contact with such insulation by spring. Electric characteristics of a interface depend on the contact pressure, but the required characteristics are assured so far as a proper contact pressure is maintained. In this report, the interfacial pressure by pressure sensors both in the early stage and after heating cycle were measured and the simulation by FEM program were presented. The comparison of these two results show that interfacial pressure could be controlled optimally by changing the spring length and lubricant state of the interface.

  • PDF

Investigation on DC Breakdown Strength Characteristics of Power Cable Insulation (전력 케이블 절연재에 대한 DC절연파괴강도특성 고찰)

  • Lee, Han-Joo;Jung, Eui-Hwan;Joe, Sung-Hoon;Yoon, Jae-Hoon;Lim, Kee-Joe
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.86-86
    • /
    • 2010
  • Recently, CV, CNCV, CNCV-W cable are used to transmit and distribute electric power. And a lot of researchers put more effort to realize high performance. The dielectric breakdown strength characteristic is a standard to design insulators. Examination of that is a main factor to determine long term insulation performance, which is used to diagnose Insulation deterioration. In this paper, we prepared XLPE, XLPE/nano-filler, LDPE/nano-filler for comparing each of the dielectric breakdown strength characteristics.

  • PDF

Insulation rehabilitation of water tree aged cables by silicone treatment (실리콘 처리에 의한 수트리 열화케이블의 절연회복)

  • 김주용;송일근;한재홍;이동영;문재덕
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.14 no.1
    • /
    • pp.14-21
    • /
    • 2000
  • This paper presents the results of performance evaluation of silicone treatment technique which was developed for the insulation rehabilitation of water tree aged XLPE power cables. We treated the water tree aged 325 [$\textrm{mm}^2$] CN/CV cables with silicone, and then analyzed the degree of insulation rehabilitation as a function of time. AC breakdown test was conducted to evaluate insulation rehabilitation. The diagnosis test using relaxation current measurement and the characteristic analysis of insulation were also performed to estimate silicone treated cable. AC breakdown strength of silicone treated cable for one year was increased, resulting from the chemical reaction between silicone fluid and water. This experiment showed that the silicone treatment technique was effective for insulation rehabilitation of the water tree aged cables.

  • PDF

Development of System and Measured Results for Measuring Insulation Resistance of High-Power Cables in Operation (활선 고전력 케이블의 절연저항을 측정하기 위한 시스템 설계 및 측정결과)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.4
    • /
    • pp.165-170
    • /
    • 2016
  • The XLPE(or CV) cables installed to deliver high electric power from generator at the power station have operating for the last 40 years in Korea. In 6-8 years from the time of initial operation, the cables in operation start a deteriorating process, depending on the installation and usage conditions. Some cables, even before 6-8 years from the installation, can cause accidents due to the faulty construction or other inadequate environments. In order to prevent cable accident in advance, the regular auditing of power cables are required. For a systematic realization of surveillance and prevention of accidents, we have invented a measuring device. In this paper, we present the device installed at Korean Western Power Co. Ltd., in order to detect the deterioration status of insulation resistances of dielectrics in the cables. We present that the measured results by the device we developed show the deteriorating processes in the cables in operation.

Measurements of Load Current of XLPE Cables Installed at the Load Terminal of Turbine Generator in Operation at Thermoelectric Power Station (화력 발전소의 터빈 발전기 부하단에 설치된 XLPE 케이블의 부하전류 측정)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.17 no.1
    • /
    • pp.207-212
    • /
    • 2017
  • The cables installed to deliver high electric power from a generator at a thermoelectric power station are XLPE (or CV) cables. Depending on the installation and usage conditions, the cables in operation start deteriorating from the time of initial operation. Some cables can cause accidents due to faulty construction or other environmental factors. In order to prevent cable accidents, regular auditing of power cables is required. We have invented a measuring device for systematic surveillance and prevention of accidents, and installed the device at Korean Western Power Co. Ltd. which measures load currents through the cables. In this paper, we present the load current measured using our device, analyze the load characteristics by measures current, compare the ampacity defined by IEC standard, and present a basic data to obtain the temperature of cable conductors.

Failure Analysis of Underground Transmission Cable Systems (국내 지중 케이블 고장현황 분석)

  • Kang, Y.W.;Cho, S.B.;Kwak, B.M.;Lim, H.E.;Yoon, H.H.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2377-2379
    • /
    • 1999
  • In order to analyze failure rates of underground transmission power cable systems in Korea, the survey has been performed for the failure cases of cables, joints, and terminations in CV, OF and POF cable systems which occurred from 1983 to 1998. During 16 years, the failure cases due to trips of the systems were 47 among the total 108 cases, These 47 cases could be divided into internal reasons(manufacture/installation, corrosion and degradation) of 16 cases and external reasons (external mechanical damages, lightning, fire. etc.) of 31 cases. For the 154 kV cable systems during 12 years from 1987 to 1998, total failure rate was 0.0057 [case/100C-km/year] and internal reason failure rate was 0.0020 [case/100C-km/Year], which is similar to those of foreign countries. Also, the many cases of internal reason failures occurred in the early stage after the operations due to incorrect installations. This implies that the installation process is very important and some diagnostic tests such as PD measurement are needed besides after laying test.

  • PDF