• Title/Summary/Keyword: CULVERT

Search Result 180, Processing Time 0.03 seconds

Road Drainage Facility Design Methods apply on the Hydraulic and Hydrologic Analysis (수리·수문기술을 적용한 도로 배수시설 설계 기법)

  • Lee, Man-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.4
    • /
    • pp.419-430
    • /
    • 2012
  • Due to the calculation difficulty on the hydraulic and hydrologic analysis for road drainage facilities design, these analysis techniques are not applicable. This study's result are development of minutely rainfall-intensity equation suitable for road drainage area, verification of rainfall-runoff model joining kinematic wave theory for road drainage area, computational model based GUI for road surface drainage facilities spacing and culvert's size decision and various road drainage channel design. Applicable test on the developed model is proceed, result that in case of road surface dranage facilities spacing is narrower 6~65% than present spacing calculation method, in other case of road cross dranage facilities size is bigger 6~140% than present size decision method.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

A Study on the Performance Evaluation of Precast Concrete Box Culvert with Blast Furnace Slag (고로슬래그를 이용한 프리캐스트 콘크리트 박스암거의 성능평가에 관한 연구)

  • Kim, Doo Hwan;Jung, Jun Young;Kim, Sung Pil;An, Man Bok;Tae, Gi Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.157-157
    • /
    • 2011
  • 프리캐스트 콘크리트 박스 암거는 현장 타설식 암거에 비해 구조물의 고품질화 및 반복적인 대량생산으로 원가 절감과 건식화 시공으로 인한 공정의 단순화와 공기가 단축되는 이점을 지니고 있다. 따라서 본 연구는 상재 허용하중을 확보하고, 시공성 및 내구성이 뛰어나며, 경제성을 고려한 고성능 프리캐스트 박스 암거를 개발하고 향후 고성능 프리캐스트 박스 암거를 생산하기 위한 기초적인 자료를 제시하고자 하였다. 본 연구에서는 기존의 보통 포틀랜드 시멘트를 이용한 프리캐스트 박스 암거의 경제성 및 내구성, 강도특성을 개선하고자 고로슬래그를 이용하여 최적의 배합비를 산출하고, 이를 토대로 중성화, 염해, 동결융해 등의 시험을 통해 내구성을 확보하고, 휨 성능을 확인하고자 실물박스암거를 제작하여 외압강도시험을 실시하였다. 또한 구조해석을 통해 응력검토를 하였다. 내구성 검토 결과, 분말도 $6,000cm^2/g$을 가진 고로슬래그 미분말을 50%로 혼입한 콘크리트가 보통 포틀랜드 시멘트를 사용한 콘크리트보다 염화물이온 투과성에 대한 저항성 및 동결융해 저항성 등 기초물성 및 내구성이 개선됨을 알 수 있었다. 박스암거에 대한 휨 시험 결과, OPC에 비해 GFSC6의 경우는 크게 구조적 성능이 떨어지지는 않는 것으로 나타났으며, 균열양상 및 연성도에서는 우수함을 나타냈다. ABAQUS에 의한 비선형 해석 결과는 시험체의 휨 거동을 잘 묘사하는 것으로 나타났으며, 처짐의 경우 시험체의 시험결과보다 크게 나타났지만, 처짐 양상은 비슷한 것을 알 수 있었고, 벽체와 상부 슬래브에 발생하는 응력은 부재가 허용하는 균열응력값 이내로 나타남에 따라 사용하중 상태에서의 응력검토는 안전한 것으로 판단된다.

  • PDF

A study on the performance-based design methodology for tunnels through case study on the tunnel built by the prescribed design (사양중심의 터널 설계 사례 연구를 통한 성능기반 터널 설계 방안에 관한 고찰)

  • Hur, Jin-Suk;Kim, Seung-Ryull;Hwang, Je-Don;Seo, Young-Wook;Jung, Myung-Keun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.4
    • /
    • pp.415-429
    • /
    • 2013
  • Performance-based design is becoming a key word for structure design in architectural and civil engineering spheres. In this paper, the need of the performance-based design, especially for tunnels, was enhanced by case study on the largely deformed cut-and-cover arch tunnel built by the prescribed design. In addition, this paper introduces effective method of subdivision on tunnel performance to help field engineer's comprehension. Case study dealing with the issue of typical backwards problem in geotechnical engineering was examined. First of all, the outline of the damaged culvert as well as the surrounding embankment is in detail described. The background, together with the cause of damage, is discussed based on the results of site investigation. Secondly, it was attempted to elucidate the deformation mechanism of the embankment by means of numerical analysis, and the countermeasures are proposed. Finally, the stability of the embankment with the countermeasures was evaluated.

Development of a culvert design model (유역배율별 저수지의 하천유지유량 공급능력)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.446-446
    • /
    • 2011
  • 유역면적을 수혜면적으로 나눈 값을 유역배율이라 하며, 관개저수지에서 적어도 3 이상 되어야 용수공급의 효율이 있다. 저수지 둑 높이기 사업의 113개 저수지를 분석하면 유역배율이 3 이하 37개소, 3-10은 58개소, 10이상 18개소에 이르며, 이 중에서 몇 개 저수지를 선정하여 유역배율별 저수지로부터 하천유지유량 공급능력을 분석하였다. 분석방법은 저수지 물수지 모형을 구축하여, 이수관리곡선에 의해 용수공급제한 운영의 경우와 정상운영의 결과로 구분하여 하천유지유량 공급능력을 분석하였다. 사전연구로 유효저수량 21,504 천$m^3$, 유역면적 $84.79\;km^2$, 수혜면적 2,975 ha인 백곡저수지에 1966년부터 2009년까지 수혜지역에 공급할 논 관개용수 수요량을 일별로 추정하였으며, 연 관개수량은 최소 1,000만 $m^3$, 최대 4,173만 $m^3$, 평균 3,319만 $m^3$에 이르렀다. 10월부터 4월까지 하천유지유량으로 공급하는 것으로 계산하였으며, 백곡지 저수량 자료를 이용하여 유입량 모형 매개변수를 결정하여 저수지 유입량을 일별로 모의하였고, 기존저수지와 2 m 증고저수지에 대해 이수관리곡선을 작성하였다. 방류제한 운영시 관개용수 공급량은 기존저수지에서 홍수제 한수위가 없는 경우 3,151만 $m^3$, 홍수제한수위가 있는 경우는 3,014~3,087만 $m^3$로 64~137만 $m^3$ 감소하였으며, 2 m 증고 저수지에서 홍수제한수위가 없는 경우 3,293만 $m^3$, 홍수제한수위가 있는 경우는 3,175~3,245만 $m^3$로 48~118만 $m^3$ 감소한 것으로 나타나 감소율은 각각 2.0~4.3 %, 1.5~3.6 %에 불과하였다.

  • PDF

Analysis Model of Corrugated Steel Plates for Soil-Metal Box Culverts (지중강판 박스구조물을 위한 파형강판 해석 모델)

  • Choi, Dongho;Lee, Jongsun;Na, Hosung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.11
    • /
    • pp.5-18
    • /
    • 2010
  • In this paper, a 3-dimensional stiffened plate model for soil-metal box structures is proposed. 3-dimensional stiffened plate model is enable to model corrugated steel plates of soil metal box culverts considering section modulus and section properties of longitudinal and horizontal direction from a corrugated steel plate. Loading conditions which causes maximum displacement and maximum moment according to the step construction stages(a back filling to the top of the plate, a back filling to the maximum depth of cover, and loading of live loads) was applied and the behaviors of the soil metal box culverts was analyzed. Analysis results of 3-dimensional stiffened model were compared with those of 2-dimensional model, 3-dimensional equivalent plate model and 3-dimensional corrugated plate model. As results, the behaviors of 2-dimensional model and 3 dimensional equivalent model are different from 3-dimensional corrugated plate model but the result of 3-dimensional stiffened model has good agreement with that of 3-dimensional corrugated plate model.

Development of Automatic Crack Detection System for Concrete Structure Using Image Processing Method (이미지 분석기법을 이용한 콘크리트 구조물의 균열 검출 시스템 개발)

  • Lee, Ho Beom;Kim, Jong Woo;Jang, Il Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.1
    • /
    • pp.64-77
    • /
    • 2012
  • In this study, the crack detecting system with digital image processing techniques based on the mathematical morphology method was developed to detect cracks in concrete structures. In the developed system, the image combining technique of reconstructing multiple images as an entire single image considering efficient management of analysis results was applied as an additional module. The developed system was verified through a field test with the cracked concrete culvert and the crack width of 0.2 mm was able to be detected in the 40m span. In the image analysis, the difference between calculated crack width and actual crack width were less than 0.08mm. For image combination in the stitching test of pattern images, the stitched image was identical with the original picture of entire subject in the visual perception level.

Joint Element Structure Method on the Subway Box Structure unere Railroad (철도하부 가도교 설치에 대한 JES공법)

  • Pi, Tae-Hee;Cho, Kook-Hwan;SaGong, Myung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF

Studies on the Improvement of Rice Cultivation in the Ill-drained Paddy Field -I. The Effects of Fertilizations and Planting Densities on Growth and Yield of Rice in the Underchannel Drainage (습답수작기술향상에 관한 연구 -제1보 지하배수가 시비량과 재식밀도를 달리한 수도의 생육 및 수량에 미치는 영향)

  • Kang, Jae-Chul;Kim, Dal-Soo;Ku, Yung-Seo;Whang, Chng-Ju;Ra, Jong-Sung
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.19
    • /
    • pp.32-38
    • /
    • 1975
  • In order to clarify the effect of underchannel drainage and culture on the ill-drainage paddy fields, the experiment was carried out at different amounts of fertilizer and planting space under the culvert. It had been found that the effect of underchannel drainage on the ill-drainage paddy field was very efficacious, and planting density was more effective on yield than the amount of fertilizer applied.

  • PDF

Performance Analysis and Implications of Culvert Drain Maintenance (암거배수 정비의 성과분석과 시사점)

  • Hyangmi Yi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.412-412
    • /
    • 2023
  • 정부는 2027년까지 식량자급률 55.4%를 달성하고, 채소·과실류 국내 공급 여력의 85% 수준을 유지하기 위한 적정 농지면적 150.0만ha가 필요하다고 추정하였다. 그리고 정부는 적정 면적 확보를 위해서 농지보전 목표가 포함된 중장기 기본계획을 수립할 예정이다. 이러한 식량자급률 달성과 채소 및 과실류 재배 면적 확보를 위해서는 논의 다각적인 활용 방안을 모색할 필요가 있다. 왜냐하면 최근 쌀 공급과잉 문제를 해결하기 위해 최근 '양곡관리법'이 정치적 이슈로 등장할 만큼 쌀 공급과잉 해소와 논 농지의 효율적인 활용에 대해 사회적 관심이 많다. 이러한 맥락에서 본 연구에서는 우리나라 최초로 논 배수 개선을 위해 지하암거가 설치된 경북상주시 공검면 일대를 대상으로 암거배수의 성과를 살펴보고 개선방안을 모색하였다. 이를 위해 본 연구에서는 지하암거 설치로 배수여건이 개선된 수혜농가 42명을 대상으로 심층면담을 실시하였다. 사례지역은 오태저수지를 기점으로 시작하는 공검소하천 양안에 넓게 위치하고 분지지형으로 하천보다 낮은 저지대로, 평상시·강수시 지하수위가 높아 습답이 형성되어 영농기계 사용이 어렵고, 일부지역의 경우 작물 파종, 수확을 하지 못하는 등 피해 발생하여 영농여건이 매우 불리한 지역이다. 이러한 배수불량을 개선하기 위해 수혜면적 55.6ha에 (지하)배수가 정비되었다. 이러한 배수 개선이 지역 영농에 미치는 효과는 다음과 같이 분석되었다. 첫째, 수혜구역 내 농가들은 배수불량으로 농기계 작업이 불편하고, 논의 습답을 제거하기 위해 해당 시설에 대한 필요성을 느끼고 있다. 또한 암거배수 시설로 인해 약 72% 농가들은 습답 개선의 효과가 있는 것으로 나타났다. 둘째, 전체 수혜농가의 약 72%는 암거시설로 인해 논의 습답이 개선된 것으로 나타났다. 특히, 암거시설로 인해 물빠짐이 개선되었고, 농기계 작업이 용이하게 되었다. 다만 사업 첫해에는 논을 파헤쳐 농기계가 빠지는 피해가 있었지만, 2차년도부터는 논이 정비되어 농기계 빠지는 피해는 없는 것으로 분석되었다. 셋째, 수혜 농가들이 느끼는 "습답 피해가 매우 있음"은 사업 시행 전 51.61%에서 사업 완료 후에는 4.17%로 급격히 감소하였다. 또한 "습답 피해가 전혀 없음"을 느끼는 농가는 사업 시행 전 3.23%에 불과했지만, 사업 완료 후에는 20.83%로 급증하였다.

  • PDF