Abstract
Performance-based design is becoming a key word for structure design in architectural and civil engineering spheres. In this paper, the need of the performance-based design, especially for tunnels, was enhanced by case study on the largely deformed cut-and-cover arch tunnel built by the prescribed design. In addition, this paper introduces effective method of subdivision on tunnel performance to help field engineer's comprehension. Case study dealing with the issue of typical backwards problem in geotechnical engineering was examined. First of all, the outline of the damaged culvert as well as the surrounding embankment is in detail described. The background, together with the cause of damage, is discussed based on the results of site investigation. Secondly, it was attempted to elucidate the deformation mechanism of the embankment by means of numerical analysis, and the countermeasures are proposed. Finally, the stability of the embankment with the countermeasures was evaluated.
성능설계는 건축과 토목분야의 구조물 설계에 대한 키워드로 떠오르고 있는 실정이다. 본 논문에서는 기존의 사양설계로 설계되어 시공 중이던 개착식 터널 구조물의 변형 사례에 대한 사례 연구를 통하여 터널에 대한 성능설계의 필요성을 고찰하고 있다. 이와 더불어 터널의 성능을 세분화하는 방법론을 소개함으로써 성능 기반 설계법 도입에 따른 현장 실무자의 이해를 돕고자 하였다. 해당 사례 연구는 전형적인 지반공학적 역해석 문제로, 상세한 지반조사, 시공 이력 분석 및 수치해석적 방법 등 다각적인 접근으로 변형의 원인을 규명하였으며 시공성 및 경제성을 만족하면서 소정의 성능 확보가 가능한 대책을 제안하였다.