• Title/Summary/Keyword: COPS

Search Result 102, Processing Time 0.026 seconds

LCC Analysis of a Heat Pump System Using River Water (하천수 열원 이용 열펌프 시스템의 LCC 분석)

  • Han, Sang-Soo;Park, Cha-Sik;Kim, Yong-Chan
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1424-1428
    • /
    • 2009
  • The performance of a heat pump using river water as a heat source was compared with that of a conventional air-conditioner for cooling and a boiler system for heating. The heat pump system using river water considered the 1-stage cycle for cooling and the 2-stage cycle for heating. The COPs of the river water source heat pump were $0.5{\sim}1.1$ higher than those of the conventional system in the cooling season. The LCC of the river water source heat pump system was lower 13.5% and 32.4% than that of the conventional system I and II. In addition, when the initial cost ratios of the river water source heat pump system to the conventional system I and II were less than 1.2 and 1.4, respectively, an acceptable payback was found to be less than 5 years.

  • PDF

Simulation of Alcohol Absorption Heat Pumps for Heating Performance (알코올 흡수식 열펌프의 난방성능 예측)

  • Kim, Dong-Seon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.5
    • /
    • pp.269-276
    • /
    • 2015
  • Single-effect $CH_3OH-LiI-ZnBr_2$ and $C_2H_5OH-LiI$ absorption heat pumps are simulated to evaluate feasibility as heating device. These systems are predicted to give higher heating COPs in wide operating ranges compared to conventional systems. Among the two systems, the $C_2H_5OH-LiI$ system is found to be more advantageous for operating in extremely cold weather due to the large solubility of Lil in $C_2H_5OH$.

Analysis of Thermal Performance of Ground-Source Heat Pump System (지열 이용 열펌프 시스템의 열성능 해석)

  • Koh, Deuk-Yong;Shin, U-Cheul;Baek, Nam-Choon;Kim, Ook-Joong
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.167-172
    • /
    • 2005
  • The purpose of this study is to present the simulation results and an overview of the performance assessment of the Ground-Source Heat Pump(GSHP) system. The calculation was performed for two design factors. the spacing between boreholes and the depth of the vertical ground heat exchangers. And the simulation was carried out using the thermal simulation code TRNSYS with new model o( water to water heat pump developed by this study. As a result, it was anticipated that the yearly mean COPs of heat pump for heating and cooling are about 3.7 and 5.8 respectively and the heat pump can supply 100% of heating and cooling load all the year around.

  • PDF

Performance Characteristics of a Bypass Two-Circuit Refrigeration System (바이패스유로 멀티사이클을 적용한 냉동시스템의 성능특성에 관한 연구)

  • Kim, Ki-Youl;Jung, Hae-Won;Kim, Yong-Chan
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.6
    • /
    • pp.319-325
    • /
    • 2009
  • The purpose of this study is to investigate the performance characteristics of a bypass two-circuit refrigerator. A bench scale refrigeration system was designed and constructed to estimate possible performance improvement of the bypass two-circuit refrigerator. The experiments were conducted in the bench scale refrigeration system by varying capacity of the condenser and refrigerant charge amount with an adoption of a refrigerant storage vessel. The COPs of the bypass two-circuit refrigeration system in the refrigerator and freezer (RF)-mode and freezer(F) only-mode were increased by 10% and 17%, respectively, with increasing the capacity of the condenser. Besides, the COP of the system in the F only-mode was increased by 10% by adopting the refrigerant storage vessel.

A study on safety hazard analysis for development of Ka band Communication Payload System of COMS (통신해양기상위성 Ka 대역 통신탑재체의 안전 위험성 분석 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.4 no.1
    • /
    • pp.27-31
    • /
    • 2010
  • The scope of this paper is to analyze the safety aspects of the Ka-band payload system which are associated with testing, transportation, integration, handling and storage. According to ESA philosophy and the ECSS-Q-40A "Space Product Assurance - Safety", safety hazard analysis of Ka band payload was performed. In this paper, it is indicated the requirements to be satisfied for eliminating, reducing, or controlling the hazards and by showing how they have been implemented in the COMS design. And it shows the safety hazard analysis result which has performed the analysis according to ESA document and also shows the potential hazard cause, potential effects, hazard grade and criteria resolution of Ka band COPS.

  • PDF

A study on Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성의 Ka 통신탑재체 개발 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.22-27
    • /
    • 2008
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the Communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for Ka band Communication Payload System which was established and performed during the Qualification Model (QM) manufacturing phase. In this paper, we present detailed process for the products manufactured by local companies according to PA procedures operated through whole phases from design to test of equipment. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product quality manufactured by local companies.

  • PDF

Investigation into the variation on Si wafer by RTA annealing in $H_2$ gas (RTA를 이용하여 수소 열처리한 실리콘 웨이퍼의 표면 및 근처의 변화 연구)

  • 정수천;이보영;유학도
    • Journal of the Korean Crystal Growth and Crystal Technology
    • /
    • v.10 no.1
    • /
    • pp.42-47
    • /
    • 2000
  • The surface structure and the crystalline features in the near surface region have been investigated for CZ(Czochralski) grown Si wafers. Si wafers were annealed by RTA (Rapid Thermal Annealing) method in H$_2$ambient after mirror polished process. The densities of COPs (Crystal Originated Particles) after RTA process were remarkably decreased at the surface and in the region of 5um depth from the surface as well. terrace type surface structure which was formed by etching and re-arrangement of Si atoms during $H_2$annealing process also has been observed.

  • PDF

Comparative Evaluation of the Cooling and Heating Performance of a $CO_2$ Heat Pump System for Vehicles (차량용 이산화탄소 열펌프 시스템의 냉난방 성능 비교평가)

  • Kim, Sung-Chul;Kim, Min-Soo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.17 no.2
    • /
    • pp.126-131
    • /
    • 2009
  • A $CO_2$ heat pump system was designed for both cooling and heating in the cabin of electric vehicles, hybrid vehicles or fuel cell vehicles, In this study, the performance characteristics of the heat pump system without any supplementary heating device were analyzed and the heating performance was compared with the cooling performance for various operating conditions. Experiments were carried out by changing the speed of electric drive compressor, the air flow rate of interior heat exchanger and the air inlet temperature and speed of exterior heat exchanger. Therefore, the cooling/heating capacities and the corresponding COPs are quantified. Also, the heat pump system showed an improved performance for the cooling operation and the heating operation. In this study, the experimental results can be used to evaluate the effect of system design changes on system performance as well as the development of a highly efficient heat pump system.

Performance Characteristics of Water-to-Air Heat Pump under Partial Load Heating Operation (물-공기 히트펌프 시스템의 부분부하 난방운전 특성)

  • Cho, Yong;Lee, Nam Young;Kim, Yong Yeol;Kim, Dea Geun;Jung, Eung Tai
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.170.1-170.1
    • /
    • 2010
  • Performance of water-to-air heat pump using raw water has been analyzed under part load heating operation in March, 2010. The water source heat pump of 30 RT was installed for 24 hours cooling and heating ventilation, and the gravity inflow water from Daechung dam is used as the heat source. The daily averaged water and air temperatures are $5.7^{\circ}C$ and $9.9^{\circ}C$ respectively, and the heat pump is operated under part load condition for 7.5 hours in 24 hours. The daily averaged heat pump COP calculated with heat transferred from the brine water is 2.49 and the monthly averaged COP is 2.25 in March. Based on the database of the California Energy Commission, the monthly averaged COPs of air source heat pumps installed in U.S.A. are 1.97 in March and 2.03 in April. Therefore it is confirmed again that the performance of the heat pump using raw water is better than that of air source heat pumps.

  • PDF

A Performance Evaluation of a 400RT Vertical type Geothermal System installed in a R&D and Office Building in Spring (연구.사무공간의 냉난방용으로 설치된 400RT급 수직형 지열시스템의 봄철 성능평가)

  • Shin, Dong-Keol;Kim, Joong-Hun;Shin, Seung-Ho;Hwang, Kwang-Il
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.4 no.2
    • /
    • pp.9-14
    • /
    • 2008
  • 400RT geothermal system which is consist with vertical-typed 112 geothermal heat exchangers is measured and evaluated in spring, 21st${\sim}$24th May 2008. As the results, the average temperature difference between inlet and outlet of geothermal pipes is $1{\sim}2^{\circ}C$ and that of cool water supply is $2{\sim}6^{\circ}C$, when being normally operated. Despite temperature fluctuations by cooling loads, the average temperature difference between main pipes of inlet and outlet of geothermal heat exchangers is measured as $3^{\circ}C$. The geothermal system COPs are calcluated as 2.92${\sim}$3.92 in every 12 hours.

  • PDF