• Title/Summary/Keyword: CLAIM

Search Result 1,489, Processing Time 0.029 seconds

The Development of a Web-based Decision Support System for Construction Claim Management (건설 클레임 관리를 위한 웹기반의 의사결정 지원 시스템 개발)

  • Sung, Nak Won;Kim, Young Suk;Lee, Mi Young;Lee, Jung Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.115-123
    • /
    • 2006
  • Recently, construction claims have been increased for protecting the rights of construction participants and effectively adjusting the changes under the contract. Thus, the importance of claim management has been emphasized in the construction industry. In domestic construction industry, some claim issues involved in construction activities are often being developed into disputes and even litigations because of the absence of methods or systems for the dispute resolution, and the lack of judicial precedents which can be provided as the references for resolving a particular dispute. In general, the judicial precedents related to the disputes and litigations occurred among construction participants would be extremely valuable in evaluating and analyzing current claims issues. However, such useful information has not been effectively accumulated and utilized in resolving the similar or sometimes identical types of disputes, thus requiring a large amount of additional costs, time and efforts. The primary objective of this study is to propose a web-based decision support system for construction claim management, which enables contractual participants to easily access and use the information of the judicial precedents related to the current construction claims. The decision support system is composed of 'prevention' and 'settlement' modules for avoiding and systematically resolving the construction claims.

A Study on the Delay Claim in Construction Projects (계약공사기간 연장에 의한 클레임 처리방안)

  • 노병옥;이상범;이호일
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.93-98
    • /
    • 2001
  • If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.

  • PDF

Non-D-linked Wh-NPs in Korean and Japanese

  • Son, Gwang-Rak
    • Language and Information
    • /
    • v.8 no.2
    • /
    • pp.93-110
    • /
    • 2004
  • This paper discloses a striking similarity between Korean/Japanese wh-NPs and Italian QPs: both categories are disallowed from LD-movement out of weak islands. This leads us to a substantial claim that wh-phrases in the former languages possibly belong to a non-D-linked category, parallel to the Italian QPs. This claim is also supported by semantic evidence: that is, in-situ wh-NPs in these languages lack covert partitivity (Kyungnam University)

  • PDF

The Influence of Consumer Independence on Attitudes and Purchase Intention Towards Advertisements that Depict Consensus Claims (소비자의 독립성이 합의된 주장 광고 태도 및 구매의도에 미치는 영향)

  • Jeon, Sooji;Jeong, Hyewook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.555-568
    • /
    • 2018
  • This study has expanded the existing studies on the characteristics of consumers using the personal level of cultural dimensions and self-construal. As Korean are becoming more individualistic and independent, we have focused on consumer independence in self-construal. The purpose of this study was to investigate the effects of consumer independence on consumers' attitudes and purchase intention toward consensus claim in ads. We hypothesized that individuals with higher in independence are more likely to show negative attitudes and the purchase intention towards the ads focused on consensus claim. Two experiments revealed that consumers higher in independence, depicting consensus claim in ads reduces consumers' attitudes and purchase intention. Based on the results, we suggest that for individuals higher in independence, consensus claims in product advertisement are less effective advertising strategy which ultimately lower consumers' purchase intentions. Important theoretical and practical implications are discussed.

Service Information System(SIS) with Real Time Using RFID and X-Internet in Ubiquitous Environments (유비쿼터스 환경에서 RFID와 X-Internet을 이용한 실시간 서비스 정보 시스템)

  • Jo Young-Ung;Lee Eung-Joo;Kim Dong-Kyu;Kwon Ki-Ryong
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.10
    • /
    • pp.1391-1402
    • /
    • 2005
  • All industrial Products of today are various demand of customers and are switchovered the manufacturing system of a small quantity batch production. Its life cycle was very shortened. An enterprise is improved to satisfaction with external customers and internal customers of infinity competition time. They can exist on achieving customer satisfaction management. In this paper, a new implementation of service information system (SIS) with real time using RFID and X-Internet in Ubiquitous environments is proposed. The proposed SIS system has Web architecture based on XML and has a new X-Internet environment overcoming limitation of Client/server architecture. The service information system analyze its material data and suppress the same CLAIM creation. The implementation method of real time SIS system using RFID and X-Internet is proposed for contribution of business market reducing F-Cost.

  • PDF

A Study on the Buyer's Remedies in respect of Defects in Title under SGA (SGA에서 권리부적합에 대한 매수인의 구제권에 관한 연구)

  • MIN, Joo-Hee
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.66
    • /
    • pp.95-118
    • /
    • 2015
  • This study examines the Buyer's Remedies in respect of Defects in Title under SGA. As SGA divides contractual terms into a condition and a warranty, its effects regarding a breach of a condition or a warranty are different. Where a stipulation in a contract of sale is a condition, its breach may give rise to a right to treat the contract as repudiated and to claim damages. Where there is a breach of a warranty in a contract of sale, the aggrieved party may have a right to claim damages. Regarding a breach of a condition under SGA s 12(1), although the buyer may have his right to terminate the contract, he may lose that right when he accept or is deemed to have accept the goods by intimating his acceptance to the seller, acting inconsistently with the ownership of the seller, or retaining the goods beyond a reasonable time without rejecting them. Furthermore, the buyer may claim the estimated loss directly and naturally resulting from seller's breach. SGA contains the principle of full compensation and so the suffered loss and the loss of profit are compensable. As to specific performance under SGA, the court has been empowered to make an order of specific performance to deliver the goods in conformity with the terms of the contract and so it is not a buyer's right. This order should be made only where the goods to be delivered are specific or ascertained goods and the court must think fit to grant the order. However, among these remedies, the buyer cannot have the right to terminate the contract where there is a breach of warranty by the seller under SGA s 12(2).

  • PDF

The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project - (대형 건축 턴키공사의 클레임예방을 위한 클레임 요인 분석에 관한 연구 - 국내 사례를 중심으로 -)

  • Yoon Jun-Seon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.205-211
    • /
    • 2005
  • Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.