• Title/Summary/Keyword: Business plan

Search Result 2,035, Processing Time 0.026 seconds

Risk Based Approach to Business Planning and Management Control -Case Study on London Underground (위험도 기반에 의한 사업계획수립과 경영관리 -런던지하철 사례연구)

  • Jung, Won;Lim, Seung-Soo;Wang, Jong-Bae;Park, Chan-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.577-583
    • /
    • 2007
  • In railway business plan, operations require a strategic and sustained level of planned investment to ensure assets are fit for purpose over the whole of their planned life. Therefore it is essential that operator can confidently plan and predict capital investment requirements over a number of years. This research addresses that how the London Underground apply a systematic risk based approach to their health and safety planning and investment decision making. Through this case study, we investigate the elements of management system that includes arrangements for the ongoing identification of hazards, assessment of risks and the implementation necessary control measures. Risk based business planning processes are also addressed.

  • PDF

The Study about a plan to develop an ITSM building framework applied ITIL Continuous Service Improvement Process (ITIL 프로세스 개선 모델을 적용한 ITSM 구축 모형 개발 방안에 관한 연구)

  • Kwon, Sang-Kook;Kim, Jeong-Jung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.134-141
    • /
    • 2006
  • Today, the role of IT is so important that it is regarded as a partner of business, not a simple supporter. The more important the role of IT becomes, the higher the level of business needs rises and the more customers want. In the market of IT, more and more enterprises are establishing ITSM processes based on the ITIL for these environments: however they are experiencing the processes of trial and errors because of the shortage of references To improve these problems, in this study, we developed the ITSM model defined by investigation of the instance to which we have applied the ITIL Continuous Service Improvement Process which contains five phases such as High level Business Objectives. Assessment. Measurable Targets, Process Improvement, Measurement and Metrics. This model is an ITSM building framework to understand the concepts over the length and breadth of ITIL and minimize the trial and errors appearing during the building of the ITSM processes, and this paper presents a plan to develop the frameworks.

  • PDF

A Study on the Introduction of Business Continuity Management System for Ensuring Uninterrupted Service of Public Institution Based on a Bottom-up Method (공공기관이 재난으로부터 중단없는 대국민 서비스 확보를 위한 상향식 업무연속성관리체계 도입방안에 관한 연구)

  • Choi, Deok Jae;Yang, Seung Weon;Kim, Gi Won;Kim, Dae Jin;Jang, Hyun Min;Kim, Dong Heon;Eun, Min Gyun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.2
    • /
    • pp.87-91
    • /
    • 2016
  • In recent years, lots of damages appear frequently due to cyber terrorism and natural disasters such as typhoon 'Chaba', earthquake at Kyeongju. The damages lead to people's anxiety and public institutions connected directly with them also can't be free from the threat situation. In addition, public institutions must prepare business continuity issues with the highest priority in the event of disasters because they are closest with people's safety. However, preceding researches suggest needs of disaster mitigation activities management system or central office oriented top-down BCP establishing system. In this study, We grasp the current status of public institutions's business continuity plan(BCP) against disaster and we propose an efficient bottom-up method for structuring the BCP of public institutions.

A study on the managemnet Efficiency of LCD Equipment Industry (LCD 장비 산업의 경영 효율성에 관한 연구)

  • Kim, Chang-Soo;Jung, Back-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.125-133
    • /
    • 2007
  • Everyone knows how much the company business goal is achieved is the most important to all companies. In order to maximize the business performance, many companies have introduced a diversity of management innovation activities. The effect of business performance is important in the business activity, but an efficiency of output-to-input concept is significantly important. Each year, companies have managed the business through a sum of performance. In terms of the efficiency of business performance, the management is importantly managed. In the efficiency of business performance, there are the main items including the total assets, employees, and operating expenses as the input. As the output, there are the main items of sales, current term's net income. This study is intended to calculate the business efficiency through DEA analysis for companies' business performance, and to study in order for the efficiency of business performance to be considered when the companies establish the mid and long term business plan.

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

A Review of the Vegan Fashion Category and a Practical Plan for Ethical Consumption (비건 패션의 범주와 실천 방안 모색)

  • Bae, Soojeong
    • Journal of Fashion Business
    • /
    • v.24 no.2
    • /
    • pp.68-84
    • /
    • 2020
  • The purpose of this thesis is to suggest a Practical Plan for ethical consumption by reviewing the category of Vegan Fashion and investigating its Social Value of vegan fashion. This will be achieved through investigating the papers and official home pages of 13 selected Vegan Fashion brands. It was found that in terms of use of materials such as leather, fur and organic fibers the brands can be divided into three sections: fur-free, cruelty-free and perfect vegan. A Practical Plan is suggested based on the aspects of production, consumption, distribution and education. Firstly, the provider should be required to understand vegan materials deeply, it is also desirable for them to get vegan certifications. Secondly, the seller should also understand about vegan materials, and be able to explain this to consumers. The education from the seller is vital and the meaning of logos and associated contents used by the label should be clearly explained to consumers. Thirdly, the association of consumers, and fashion brands should cooperate to enhance the level of general understanding in society further, this should influence new laws, that address ethical issues regarding the use of fur in fashion. Environmental problem of the future might be reduced if the stakeholders in Vegan Fashion are cooperatively and actively trying to educate the general population and make Vegan Fashion popular and ethical consumption popular.

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

Practice of Fashion Color Planning - Focus on Color Images of the Bloomsbury Group Paintings for a Color Plan of Company D - (패션 색채기획의 실제 - 'D'사(社) 색채기획을 위한 Bloomsbury Group 회화의 색채 이미지를 중심으로 -)

  • Han, Seung-Hee;Cho, Kyu-Hwa
    • Journal of Fashion Business
    • /
    • v.13 no.4
    • /
    • pp.21-36
    • /
    • 2009
  • The objective of the study is to create color plan for company D based on color images of the Bloomsbury Group paintings, which is an art institute based in Bloomsbury, London, a hometown of the company, to renew the traditional brand image of the company by blending fashion and art. This study analyzed 'D's previous F/W Color planning from 2003 to 2007 through NCS to understand characteristics of company D's color planning. It considered company D's color renewal concept by looking into Bloomsbury Group's backgrounds and pieces. Based on 2008-2009 F/W color trend and the analysis result, the study suggests a color plan with reference to a case study of the company D, for which I work as a colorist. The color renewal of the company D for 2008-2009 F/W season was categorized into theme I. Bloomsbury and theme II. Charleston for planning. The following table summarizes the result of 2008-2009 F/W season color plan with focus on development of new check and print patterns. The significance of the study can be found in that it advanced beyond the color planning stage to be applied to the actual renewal. Through a renewal of an existing brand, a fashion brand can be revitalized to have distinguished competitiveness.

A study on the Activation Plan Using public purchase system of the Disability Firm manufactured product (장애인기업 생산제품의 공공구매제도를 통한 활성화 방안에 관한 연구)

  • Song, Soo-Jeong;Won, Joon-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.145-151
    • /
    • 2010
  • The research which sees the disability firm led and public procurement market penetration the base will be able to grow prepared and with the petal of the disability firm for a support disability firm manufactured product public purchase activation plan of the government offices groped. disability firm manufactured products purchase promotion plan and policy of the government offices presents the fact that with the aim.