• Title/Summary/Keyword: Bus operation

Search Result 624, Processing Time 0.027 seconds

Analysis of Commercial Older Drivers Riskiness using Transport Workers Management System (운수종사자시스템을 활용한 사업용 고령운전자의 위험성 분석)

  • Hur, Jung-Chul;Lee, Choul-Ki;Chon, Chun-Taek
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.16-28
    • /
    • 2017
  • In this study, we analyzed the result of new inspection, accidents, penalties, and operation records of the elderly driver's driving aptitude test in the city bus using the Transport Workers Management System and the Digital Tachograph Analysis System(eTAS). As a result of the analysis, the results of the driver aptitude test were similar when compared with the traffic company which has many bus drivers and the well - And it was confirmed that the average number of serious injuries and slight injuries in case of accidents was small. Comparing the number of dangerous driving behaviors per 100 km of driving, the elderly driver of the excellent company showed that the number of dangerous driving behaviors is considerably smaller than other elderly and non - elderly drivers, and that the result of correcting the wrong driving habits.

Concentration of Airborne Fungi in Public Transportation during Operation (운행 중 대중교통차량 내 부유진균 농도 분석)

  • Kim, Hong-Gi;Cho, Eun-Min;Jeon, Bo-Il;Lee, Jeong-Hun;Kim, Ho-Hyun;Kwon, Hyuk-ku
    • Journal of Environmental Health Sciences
    • /
    • v.46 no.6
    • /
    • pp.757-763
    • /
    • 2020
  • Objectives: The objective of this study was to evaluate the concentrations of airborne fungi in public transportation from autumnl 2016 to summer 2017. Methods: This study measured the concentrations of airborne fungi on six subway lines and intercity buses in Seoul. Results: The concentration of fungi in the air in public transportation was found to be lower than the standard (500 CFU/㎥) for vulnerable group facilities among public use facities. In summer, the concentration of airborne fungi was relatively higher than in autumn. The concentrations of airborne fungi in subway (252.0 CFU/㎥) and train (45.1 CFU/㎥) were high tendency during non-rush hours in summer, while intercity bus was hightendency during rush hours in summer (111.9 CFU/㎥). The major types of airborne fungi in public transportation were Cladosporium, Penicillium, and Aspergillus. Conclusions: The harmful airborne fungus were detected though they did not exceed the standard in all public transportation. As a result, further studies on the analysis of the distribution of airborne fungi by ventilation and the characterization of indoor environments are needed to propose effective management of airborne fungi in public transportation.

Distribution Technique of Bus Charging Power Using Rapid Charging Information (급속 충전 정보를 활용한 버스 차량 충전 전력 분배 기법)

  • Tae-Uk Chang;Yu-Min Jo;Ji-In Shin;Ji-Sook Park;Jong-Ho Paik
    • Journal of Internet Computing and Services
    • /
    • v.24 no.1
    • /
    • pp.87-97
    • /
    • 2023
  • Charger infrastructure facilities are designed and installed based on a constant power supply. Initially designed charging facilities support charging of rapidly growing electric vehicles on a limited power supply basis. In addition, current commercial vehicles can only be fully charged, and are supported by the rapid equalization charging method. However, commercial vehicles operate according to a set schedule, so flexible charging is essential. In this paper, we propose a power operation method with more than 20% efficiency improvement by using a fixed schedule-based charging scheduling and power distribution technique of a commercial bus based on the same amount of power in accordance with the rapid growth and increase of electric vehicles.

A Study on Parking Management Policy Directions by Analysis of Parking Characteristics of National Assembly (국회의사당 주차이용특성 분석을 통한 주차관리정책 방향 연구)

  • Kim, Hwang Bae;Kwon, Young In;Oh, Seung Hwoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.375-383
    • /
    • 2006
  • Nationals Assembly have experiencing unbalance between capacities and demand of parking facilities because of increasing parking demand, free parking policy, long term parking and passenger car use of workers, usage of neighborhood office workers and visitors. The lack of parking facilities cause illegal parking on the street inside and outside of National Assembly which result in the disorder of parking culture. To solve these parking problems, this study suggest parking management system to enter the National Assembly for the short term and charging parking fee, operation by private company, constructing parking building by abrogation of upper limit and construction of ground park, and so on. The study, also, suggested to strengthen weekday or 10 day shift system, to increase shuttle bus and commuting bus, to activation of Han River waterside parking area, public transportation with those new parking management system. For the conclusion, the parking problems of National Assembly should be focused more on parking management than the parking facilities supply.

A Novel type of High-Frequency Transformer Linked Soft-Switching PWM DC-DC Power Converter for Large Current Applications

  • Morimoto Keiki;Ahmed Nabil A.;Lee Hyun-Woo;Nakaoka Mutsuo
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.216-225
    • /
    • 2006
  • This paper presents a new circuit topology of DC busline switch and snubbing capacitor-assisted full-bridge soft-switching PWM inverter type DC-DC power converter with a high frequency link for low voltage large current applications as DC feeding systems, telecommunication power plants, automotive DC bus converters, plasma generator, electro plating plants, fuel cell interfaced power conditioner and arc welding power supplies. The proposed power converter circuit is based upon a voltage source-fed H type full-bridge high frequency PWM inverter with a high frequency transformer link. The conventional type high frequency inverter circuit is modified by adding a single power semiconductor switching device in series with DC rail and snubbing lossless capacitor in parallel with the inverter bridge legs. All the active power switches in the full-bridge inverter arms and DC busline can achieve ZVS/ZVT turn-off and ZCS turn-on commutation operation. Therefore, the total switching losses at turn-off and turn-on switching transitions of these power semiconductor devices can be reduced even in the high switching frequency bands ranging from 20 kHz to 100 kHz. The switching frequency of this DC-DC power converter using IGBT power modules is selected to be 60 kHz. It is proved experimentally by the power loss analysis that the more the switching frequency increases, the more the proposed DC-DC converter can achieve high performance, lighter in weight, lower power losses and miniaturization in size as compared to the conventional hard switching one. The principle of operation, operation modes, practical and inherent effectiveness of this novel DC-DC power converter topology is proved for a low voltage and large current DC-DC power supplies of arc welder applications in industry.

Phase-Shift Full-Bridge DC/DC Converter with Fixed-Phase Operation Inverter (고정 위상 동작 인버터를 포함하는 위상천이 풀 브리지 DC/DC 컨버터)

  • Kim, Jin-Ho;Park, Jae-Sung;Kim, Hong-Kwon;Park, Jun-Woo;Shin, Yong-Saeng;Ji, Sang-Keun;Cho, Sang-Ho;Roh, Chung-Wook;Hong, Sung-Soo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.18 no.2
    • /
    • pp.131-137
    • /
    • 2013
  • In this paper, the phase-shift full-bridge DC/DC converter with fixed-phase operation inverter is proposed. The proposed circuit consists of two full-bridge inverters which are connected in parallel. While one full-bridge inverter operates as the fixed-phase, it regulates the output voltage by adjusting the phase of the other inverter. During the normal operation period, the proposed circuit makes the less amount of conduction loss of the primary switches and secondary synchronous rectifiers, as well as the less amount of the current ripple of the output inductor, than the conventional phase-shift full-bridge DC/DC converter does. Also, it achieves high efficiency by reducing the snubber loss of the secondary synchronous rectifier. To sum up, the present inquiry analyzes the theoretical characteristics of the proposed circuit, and shows the experimental results from a prototype for 450W power supply.

Study on Chip Design & Implementation of 32 Bit Floating Point Compatible DSP (32비트 부동소수점 호환 DSP의 설계 및 칩 구현에 관한 연구)

  • Woo, Jong-Sik;Seo, Jin-Keun;Lim, Jae-Young;Park, Ju-Sung
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.37 no.11
    • /
    • pp.74-84
    • /
    • 2000
  • This paper deals with procedures for design and implementation of a DSP, which is compatible with TMS320C30 DSP. CBS(Cycle Based Simulator) is developed to study the architecture of the target DSP. The simulator gives us detailed information such as function block operation, control signal values, register condition, bus and memory values when a instruction is being carried out. RTL design is carried out by VHDL. Logic simulation and hardware emulation are employed to verify proper operation of the design. The DSP is fabricated with 0.6${\mu}m$ CMOS technology. The Chip has 450,000 gates complexity, $9{\times}9mm^2$ area, 20 MIPS operation speed. It is confirmed by running 109 instructions out of 114 instructions and 13 kinds of algorithm that the developed DSP has compatibility with TMS320C30.

  • PDF

Fault Management Design Verification Test for Electrical Power Subsystem and Attitude and Orbit Control Subsystem of Low Earth Orbit Satellite (저궤도위성의 전력계 및 자세제어계 고장 관리 설계 검증시험)

  • Lee, Sang-Rok;Jeon, Hyeon-Jin;Jeon, Moon-Jin;Lim, Seong-Bin
    • Aerospace Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.14-23
    • /
    • 2013
  • Fault management design of the satellite describes preparations for failures which can occur during operational phase. Fault management design contains detection and isolation function of anomaly, and also it contains function to maintain the satellite in safe condition until the ground station finds out a cause of failure and takes a countermeasure. Unlike normal operation, safing operation is automatically performed by Power Control and Distribution Unit and Integrated Bus Management Unit which loads Flight Software without intervention of ground station. Since fault management operation is automatical, fault management logic and functionality of relevant hardware should be thoroughly checked during ground test phase, and error which is similar to actual should be carefully applied without damage. Verification test for fault management design is conducted for various subsystems of satellite. In this paper, we show the design process of fault management design verification test for Electrical Power Subsystem and Attitude and Orbit Control Subsystem of Low Earth Orbit satellite flight model and the test results.

Diagnosis of Local Traffic Controller for Effective Operation of Trams at Signalized Intersection (효율적인 트램 평면교차로 운영을 위한 교통신호제어기 기능 진단)

  • Kim, Jin-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • It has been subject to question whether a conventional traffic signal controller can support efficient operation at grade intersections in which vehicles and tram lines cross concurrently. This study proposes a list of functional requirements for a traffic signal controller to support effective operation of trams at such an intersection. The considered details includes the combinations of geometric conditions at which vehicle, bus, and tram lines are aligned, the types of exclusive tram signals, and the combinations of various signal phases, including exclusive tram phases, which are currently undefined in the nation. The results suggest that the controller should be capable of dealing with the NEMA standard overlap relays and a quadruple-ring phase representation scheme.

COMS Electrical Power Subsystem Preliminary Design (통신해양기상위성 전력계 예비설계)

  • Gu, Ja-Chun;Kim, Ui-Chan
    • Journal of Satellite, Information and Communications
    • /
    • v.1 no.2
    • /
    • pp.95-100
    • /
    • 2006
  • The COMS(Communication, Ocean and Meteorological Satellite) EPS(Electrical Power Subsystem) is derived from an enhanced Eurostar 3000 version. Eurostar 3000 EpS is fully autonomous operation in nominal conditions or in the event of a failure and provides a high level of reconfigure capability. This paper introduces the COMS EPS preliminary design result. COMS EPS consists of a battery, a solar arrat wing, a PSR(Power Supply Regulator), a PRU(Pyrotechnic Unit), a SDAM(Solar Array Drive Mechanism) and relay and fuse brackets. COMS EPS can offer a bus power capability of 3 kW. The solar array is made of a deployable wing with two panels. One type fo solar cells is selected ad GaAs/Ge triple junction cells. Li-ion battery is base lined with ten series cell module of five cells in parallel. PSR associated to battery and solar array wing generates a power bus fully regulated at 50 V. Power bus os centralized protection and distribution by relay and fuse brackets. PRU provides power for firing actuarors devices. The solar array wing is rotated by the SADM under control of the attitude orbit control subsystem. The control and monitoring of the EPS, especially of the battery, is performed by the PSR in combination with the on-board software.

  • PDF