• Title/Summary/Keyword: Building-Used

Search Result 8,573, Processing Time 0.038 seconds

AUTOMATIC BUILDING EXTRACTION BASED ON MULTI-SOURCE DATA FUSION

  • Lu, Yi Hui;Trinder, John
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.248-250
    • /
    • 2003
  • An automatic approach and strategy for extracting building information from aerial images using combined image analysis and interpretation techniques is described in this paper. A dense DSM is obtained by stereo image matching. Multi-band classification, DSM, texture segmentation and Normalised Difference Vegetation Index (NDVI) are used to reveal building interest areas. Then, based on the derived approximate building areas, a shape modelling algorithm based on the level set formulation of curve and surface motion has been used to precisely delineate the building boundaries. Data fusion, based on the Dempster-Shafer technique, is used to interpret simultaneously knowledge from several data sources of the same region, to find the intersection of propositions on extracted information derived from several datasets, together with their associated probabilities. A number of test areas, which include buildings with different sizes, shape and roof colour have been investigated. The tests are encouraging and demonstrate that the system is effective for building extraction, and the determination of more accurate elevations of the terrain surface.

  • PDF

Changes of Gyeonggi and Chungbuk Provincial Office Buildings after Relocation during Japanese Colonial Period -focusing on Suwon and Chungju- (일제강점기 관찰부 이전(移轉) 후 관련건축물의 변화에 관한 연구 -수원과 충주를 중심으로-)

  • Choi, Ji-Hae;Harn, Dong-Soo
    • Journal of architectural history
    • /
    • v.30 no.4
    • /
    • pp.7-16
    • /
    • 2021
  • This study examines changes and features of provincial office buildings in Suwon and Chungju after relocation during Japanese occupation. Gyeonggi and Chungbuk provincial offices(Gwanchalbu) were relocated by Japan. Gyeonggi Provincial Office in Suwon used HwaseongHaenggung buildings and moved to Seoul in 1910. After relocation, most of HwaseongHaenggung buildings used for Suwon Governmental hospital(JaHye Uiwon). Suwongun Office, Suwon public elementary school, Japanese Military and Suwon Police station also used HwaseongHaenggung buildings with the Hospital. At first, Japan remodeled local government buildings for their use. Most of HwaseongHaenggung buildings had been destroyed to build new buildings since 1920s. Chungbuk Provincial office in Chungju used DongHeon building which is Chungju local government building and relocated to Cheongju in 1908. DongHeon building changed to Chungju county office after relocation. This building was renovated. Chungju county office moved to other site, this building was used for Chungju county conference room. During Japanese colonial period, Suwon local government buildings were destroyed and replaced with new Japanese style buildings. Chungju local government buildings were also renovated or destroyed.

Influence of Capacity Building and Attitude to Work of librarians in Edo State Public Libraries, Nigeria

  • Omigie, Christopher Agbeniaru;Bosah, Gabriel Ejiobi
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.10 no.1
    • /
    • pp.35-45
    • /
    • 2020
  • This study is on capacity building and attitude to work of librarians in Edo State public libraries, Nigeria. Investigation was on the capacity building programs in the Edo State public libraries, the levels of librarians' awareness and participation in the programs, methods of building the capacity programs, influence on the librarians' attitudes to work and factors militating against the programs. Descriptive survey design was adopted for the study and the entire population of 23 librarians were used. Results indicate that the capacity building programs in the library include computer literacy skills, online public access catalogue (OPAC), Internet collection management and general trends in librarianship. The methods used in building the capacity programs in the library include conferences, workshops/seminars, on-the-job and internally organized courses. Respondents indicated very low level of participation in the programs and a negative influence of the programs on their attitudes to work. Various problems were identified as militating against the capacity building programs and solutions were suggested.

A Study of Plans for the improvement of the domestic building maintenance system based on the comparison and analysis of foreign building maintenance systems (외국의 유지관리 제도 비교분석을 통한 국내 건축물 유지관리 개선 방안 연구)

  • Yoon, Hyo-Jin;Chung, Kwang-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.2
    • /
    • pp.25-33
    • /
    • 2009
  • So far we have investigate and analyzed the actual conditions of building maintenance in Korea and compared the building maintenance laws and systems between Korea and other countries. Now, based on the results from such comparison and analysis, this study proposes the following ideas for improvement: 1) As we can learn from domestic and foreign case studies, in the existing built-up areas becoming obsolete, many building owners remodel their buildings illegally in reaction to current economic and social changes. Therefore, for efficient maintenance of buildings, it is required to improve building maintenance systems by formulating information about inspection items, inspectors, supervisors, inspection costs and intervals of reporting results, depending on how large the buildings are and what they are used for. 2) In addition, to ensure the success of a building maintenance system, it is necessary to keep and manage a history of building maintenance thoroughly and introduce a certification program which gives an appropriate grade to maintenance performance and commits the government to expand their public roles and supporting policies, as widely used in some foreign countries. Further, in keep the building maintenance system secure, there should be a nationwide consensus as well as a favorable evaluation from building owners and manager, and all related people.

  • PDF

Generation of the Orthoimage with the Correction of Building Occlusion

  • Yoo, Hwan-Hee;Sohn, Duk-Jae;Park, Hong-Gi
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.7-13
    • /
    • 2001
  • Geospatial Information Systems (GIS) have been employed to systematically manage and design land use in urban areas. This has increased the need for more accurate vector and raster data. In Korea, l/l,000-scale digital maps are used as vector data for the facility management in urban areas. This has increased the need for large scale orthoimages. Orthoimages generated from aerial imagery can provide accurate information, making possible the more effective city management. However, there is a large problem in using the orthoimages, i.e., currently available conventional orthoimages have not been generated based on Digital Elevation Model (DEM) that takes into account the building heights. So this causes the displacements of building image in large scale orthoimages. The present study is an attempt to generate the large scale orthoimages based on building DEM. The semiautomatic building extraction method can detect building outlines by mouse clicking on either building roofs or corners. Building DEM, based on the outline and calculated building height, was used to produce the large scale orthoimages with the corrected building occlusion.

  • PDF

A Method of Information Management for BIM Based Building Permission (BIM기반 건축물 인허가 신청을 위한 정보 관리방안)

  • Yeo, ChangJae;Kim, Karam;Kim, Gutak;Yu, JungHo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.242-251
    • /
    • 2016
  • Around the world, BIM application has been mandated. In Korea, an announcement was made in 2016 that BIM application will be required for all public constructions ordered by the Public Procurement Service. However, BIM cannot be used for building permits as Seumter, a building permit system, doesn't support BIM, even if it was used for building design. To utilize BIM for permit application, this study introduces a method of management for BIM-used permit application information. It was done by analyzing the data entered for new building permit application in Seumter. For the analysis, the permit application information is classified as internal BIM information and external BIM information and the required information is defined. To easily create and utilize the data types at the design stage, this study introduces a method of creating and utilizing a permit template. Also, this study developed a tool for combining the area information to add up all the related information such as gross floor area and floor area ratio. This study is significant in that it analyzes the required information for new building permit application among all the permit application types in Korea.

A Study on Estimation of Cooling Load Using Forecasted Weather Data (집단 건물 면적을 이용한 시간별 냉방부하 파라미터 설정 및 예측에 관한 연구)

  • Han, Kyu-Hyun;Yoo, Seong-Yeon;Lee, Je-Myo;Song, Yang-Sup
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.440-445
    • /
    • 2008
  • In this paper, new methodology is proposed to estimate the cooling load using areas of building group and predicted weather data. Only three parameters such as maximum, minimum temperature and building area are necessary to obtain hourly distribution of cooling load for the next day. The maximum and minimum temperature that are used for input parameters can be obtained from forecasted weather data. The areas of building group are used for setting several parameters that are used for estimate cooling loads. Benchmarking building(research building) is selected to validate the performance of the proposed method, and the estimated cooling loads in hourly bases are calculated and compared with the measured data for benchmarking building. The estimated results show fairly good agreement with the measured data for benchmarking building.

  • PDF

Sanitary Plumbing System Design of High-rise Building (초고층 건축물의 위생설비 시스템 설계)

  • Ju, Duck-Hoon;Byun, Woon-Seob;Yun, Hae-Dong
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.491-496
    • /
    • 2009
  • Recently, the high-rise building has been constructed competitively because it is symbol of the national competitive power including the technical power. The higher buildings are getting, the more important building mechanical systems are. So, the building mechanical systems are getting developed. Among the building mechanical systems, the sanitary system is basically necessary in order to maintain the building hygienically along with convenience and safety. This study has been investigated for various cases of high-rise building plumbing system. As a result, a variety of zoning method has been applied to most skyscrapers depending on the building height in the building mechanical system. And a variety of joint have been applied to minimize the Shortening and Sway. Also, the drainage in same uses has been discharged outside of a build through the one vertical pipe line. And airing system has been used like Individual Vent Pipe Yoke Vent Pipe Stack Vent Pipe Loop Vent Pipe Relief Vent Pipe method. It is sure that this study could be used as the high-rise building design.

  • PDF

Vibration Control Performance Evaluation of Hybrid Mid-Story Isolation System for a Tall Building (하이브리드 중간층 지진격리시스템의 고층 건물 진동 제어 성능 평가)

  • Kim, Hyun-Su;Kang, Joo-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.3
    • /
    • pp.37-44
    • /
    • 2018
  • A base isolation system is widely used to reduce seismic responses of low-rise buildings. This system cannot be effectively applied to high-rise buildings because the initial stiffness of the high-rise building with the base isolation system maintains almost the same as the building without the base isolation system to set the yield shear force of the base isolation system larger than the design wind load. To solve this problem, the mid-story isolation system was proposed and applied to many buildings. The mid-story isolation system has two major objectives; first to reduce peak story drift and second to reduce peak drift of the isolation story. Usually, these two objectives are in conflict. In this study, a hybrid mid-story isolation system for a tall building is proposed. A MR (magnetorheological) damper was used to develop the hybrid mid-story isolation system. An existing building with mid-story isolation system, that is "Shiodome Sumitomo Building" a high rise building having a large atrium in the lower levels, was used for control performance evaluation of the hybrid mid-story isolation system. Fuzzy logic controller and genetic algorithm were used to develop the control algorithm for the hybrid mid-story isolation system. It can be seen from analytical results that the hybrid mid-story isolation system can provide better control performance than the ordinary mid-story isolation system and the design process developed in this study is useful for preliminary design of the hybrid mid-story isolation system for a tall building.

Using neural networks to model and predict amplitude dependent damping in buildings

  • Li, Q.S.;Liu, D.K.;Fang, J.Q.;Jeary, A.P.;Wong, C.K.
    • Wind and Structures
    • /
    • v.2 no.1
    • /
    • pp.25-40
    • /
    • 1999
  • In this paper, artificial neural networks, a new kind of intelligent method, are employed to model and predict amplitude dependent damping in buildings based on our full-scale measurements of buildings. The modelling method and procedure using neural networks to model the damping are studied. Comparative analysis of different neural network models of damping, which includes multi-layer perception network (MLP), recurrent neural network, and general regression neural network (GRNN), is performed and discussed in detail. The performances of the models are evaluated and discussed by tests and predictions including self-test, "one-lag" prediction and "multi-lag" prediction of the damping values at high amplitude levels. The established models of damping are used to predict the damping in the following three ways : (1) the model is established by part of the data measured from one building and is used to predict the another part of damping values which are always difficult to obtain from field measurements : the values at the high amplitude level. (2) The model is established by the damping data measured from one building and is used to predict the variation curve of damping for another building. And (3) the model is established by the data measured from more than one buildings and is used to predict the variation curve of damping for another building. The prediction results are discussed.