• 제목/요약/키워드: Building permit

검색결과 67건 처리시간 0.028초

BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 - (A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA -)

  • 류재호;황종민;김솔이;서화영;이지현
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

『청음록(晴陰錄)』으로 본 (사(社))유도회(儒道會) 약사(略史) (Outline History of Corporation Yudohoi(儒道會) via 『Cheongeumrok(晴陰錄)』 by Hong Chan-Yu: "Volume of Materials")

  • 정후수
    • 동양고전연구
    • /
    • 제55호
    • /
    • pp.265-291
    • /
    • 2014
  • "청음록(晴陰錄)"은 권우 홍찬유(1915-2005) 선생의 일기(1969년 1월 9일~1982년 1월 14일)이다. 선생은 사단법인 유도회의 창립부터 모든 운영에 직접관여하였으므로 유도회의 역사를 가장 잘 알고 있는 분이다. 따라서 이 "청음록"은 유도회 역사를 정리하는데 적합한 자료로서 충분한 가치가 있다고 본다. "청음록"은 모두 19권으로 구성되었으며, 총 분량은 200자 원고지 3,300매 정도이다. 일기 작성은 한문으로 되어있으며, 한문 문장으로 썼으되 한글 문장 어순을 따르기도 하였다. 그리고 원문의 많은 부분이 초서(草書)로 씌어있고, 또 중간 중간에 많은 한시(漢詩)가 삽입되어 있다. 이 원고는 일기 중에서 사단법인 유도회에 관련된 주요사항만을 발췌한 것이다. 1. 사단법인은 1968년 11월 창립 발기인대회를 열고 이듬해 1969년 1월에 문공부로부터 인가를 받아 설립되었다(문화부장관 허가번호 제다-2-3호(종무 1732.5). 2. 사무실은 처음 서울 종로구 원남도 133-1 원남빌딩 3층(현 서울대병원 앞 대학약국 자리)에서, 종로구 관수동 경보빌딩 2층, 다시 종로구 예지동 4번지 광장회사 388호실(흥산친목회(興産親睦會) 사무실)로 이전, 이후 경운동 건국빌딩 3층으로 이전하였다. 3. 운영비 조달은 성종호 이사장의 장남 성상영의 지원, 후에는 차기 이사장인 김원태, 권태훈이 담당하였으며, 1979년부터는 홍찬유 이사가 부담하였다. 3. 유림 활동으로는, 성균관 석전제(釋奠祭) 참가를 비롯하여, 파리장서비건립(巴里長書碑建立) 및 건립 기념시집 발간, 유림독립운동사 열전편찬(미완), 가정의례준칙 제정에 실천위원으로 참가하였다. 4. 성균관과의 분쟁이 있었으나, 1975년 7월 고법, 1976년 2월 대법에서 패소하였다. 5. 성균관 유도회와 통합에 관한 의논이 있기는 하였으나 거의 진척이 없었다. 6. 1979년부터 본격적인 유교 경서 및 한문 강좌를 홍찬유 이사가 주도하여 현재까지 지속되고 있다. 현재 일반 시민 강좌를 비롯하여, 장학생 강좌가 30년을 맞이하고 있으며, 수료생이 220명에 달하고 있다.

항공안전을 위한 장애물 제한표면 관리시스템의 법·제도적 개선방향에 관한 소고 (A Study on Legal and Regulatory Improvement Direction of Aeronautical Obstacle Management System for Aviation Safety)

  • 박담용
    • 항공우주정책ㆍ법학회지
    • /
    • 제31권2호
    • /
    • pp.145-176
    • /
    • 2016
  • 항공안전은 여러 분야의 제도와 정책, 그리고 현장에서의 치밀한 실행에 의해서 확보된다. 최근 우리나라의 항공안전관리는 항공관련 법령의 정비와 함께 제 2차 항공정책기본계획의 수립을 비롯하여 국가 항공안전프로그램을 구축하고 분야별 중점전략과제를 선정하여 계획적으로 추진하면서 항공사고 예방을 위해 노력하고 있다. 이 논문은 항공기의 안전한 이 착륙과 공항 주변에서 선회비행 시의 비행안전을 확보하기 위하여 설정 고시하고 있는 장애물 제한표면위로 건축물 구조물 등이 초과하지 않도록 제한하고 관리하는 현행의 장애물 관리시스템에 관하여 실무적 경험을 토대로 검토해보고 그 간의 운영상 문제점을 분석하여 법적 제도적 측면의 개선 방안을 제시하고자 한 것이다. 특히, 최근에는 공항주변 지역주민들의 요구 등에 따라 항공학적 검토에 대한 연구와 논의도 활발하게 진행되고 있으며, 조만간 이에 관한 하위법령의 제정과 세부절차도 마련될 것이나 이에 대한 논의와는 별도로 현재의 우리나라의 장애물 관리업무 수행에 대한 법규상 제도의 불비 등 일부 미흡한 부분에 관한 개선보완 방안을 제안하는 것이다. 장애물 제한표면의 관리와 신규 건축물 축조 등의 제한은 공항인근 주민들에 대한 재산권 행사의 실질적 제약으로 작용하므로 관련된 민원도 많으며 신중하고도 신속 정확한 검토 판단이 요구되는 등 민감한 사안으로 취급되고 있는 것이 현실이다. 현재 이 업무는 항공법령에 의거 공항운영자가 수행주체가 되며 전국 민간공항이 소재하고 있는 지방자치단체와의 상호 협력관계 하에 이루어지고 있으며 실제 건축물 구조물 등의 설치허가권을 갖고 있는 지방자치단체의 매 사안에 대한 행정 행위가 매우 중요한 요소이다. 항공법령에 따라 공항운영자에게 매 5년마다 방대한 지역에 대한 정밀측량을 실시하고 그 결과의 현황에 대하여 정부에 보고토록 하고 있는데, 이 경우 측량오차로 인한 초과 장애물 현황의 개소 수가 다수 변동되거나, 각 지방자치단체들이 건축허가를 행하기 전에 사전협의 신청절차를 아예 누락하는 등 많은 문제점이 나타날 수 있다. 그러나 이 정밀측량 실시에 대한 허용오차 범위의 기준이나 협의신청 누락 등의 업무적 해태에 대한 사전 예방적 제재수단 또는 적법한 신청절차의 미 이행 등 관계법령 위반 시의 벌칙규정 등이 없는 실정으로서, 이미 문제점이 발생된 이후에야 사후적인 조치를 할 수밖에 없는 경우가 있게 되는데 실제 건축물 구조물 등이 이미 장애물 제한표면을 초과하여 완공되어진 이후에는 현실적으로 그 건축물 등을 제거조치 하거나 하는 등의 어떠한 특별한 행위를 취하기는 사실상 매우 어려운 것이다. 건축물 등의 소유자는 적법한 건축허가를 받아서 건축한 것이기 때문이다. 이미 이러한 사례는 발생되었고 그로 인한 후속대책이 검토되고 있으나, 실제로는 합리적인 해결방안을 찾기 어려울 뿐만이 아니라 또 다른 사회적 문제를 유발할 것이 분명하다고 본다. 이러한 문제점을 근본적으로 해소시키기 위해서는 현행 항공법령을 보완하여 관련된 행정적 행위의 누락이나 적정한 절차위반 시에 부과하는 벌칙조항신설과 함께, 매 5년마다의 정밀측량 결과에 대한 허용오차 범위를 적용할 수 있도록 건축법에서와 같은 별도의 기준을 신설 규정하여야 한다고 판단되므로 보다 실효성 있는 법적 제도적 개선 보완 방안을 제안하는 것이다.

우리나라의 면진 및 진동제어 (Application of Seismic Isolation and Vibration Control in Korea)

  • 이동근;김태호
    • 한국지진공학회논문집
    • /
    • 제10권6호
    • /
    • pp.67-77
    • /
    • 2006
  • 우리나라는 일본이나 미국의 서부지역처럼 지진위험도가 매우 높은 지역이 아니다. 그러므로 1988년에 처음으로 내진설계기준이 도입될 때까지 거의 대부분의 구조물들이 지진의 영향을 고려하지 않고 설계되었다. 원자력발전소나 액화천연가스(LNG) 저장 탱크 등의 구조물에 면진 기술이 적용되었지만 우리나라의 기술자들은 면진이나 진동제어에 대해서는 별로 관심이 없었으며 이러한 것은 강진지역에서나 필요한 기술로 생각하였다. 그러나 이러한 기술은 우리나라와 같은 약진지역에서 더 효과적으로 지진과 바람의 영향을 저감시킬 수가 있는 것이다. 다행히 근래에는 극히 소수이기는 하지만 우리나라에서도 면진과 진동제어 기술을 적용하는 교량이나 건물의 수가 점차 늘어나고 있어서 지진이나 바람 등의 영향에 대하여 보다 적극적인 대처를 하기 시작하였다. 그러나 건축 구조물의 면진이나 진동제어에 대하여 설계기준이 제대로 마련되어 있지 않아서 이러한 기술을 적용하는데 실제적으로는 많은 어려움을 겪기도 하는 것이 현실이다. 따라서 우리나라에서도 이러한 기술을 적용할 수 있는 법적 근거를 마련하는 것이 시급한 과제라고 볼 수 있다.

도시현황분석과 시설물 입지분석의 과학화를 위한 센서스와 GIS의 연계 활용방안 연구 (A Study of Collaboration between GIS and Census Data for Urban Analysis and Location Analysis)

  • 구자문
    • 한국지리정보학회지
    • /
    • 제3권3호
    • /
    • pp.31-44
    • /
    • 2000
  • 본 연구의 결과에 의하면, 첫째, 수치지도 개발이 완결되고, 센서스트랙제도가 채택되고, 각종 연관자료들이 전산화되면 GIS의 갖가지 표현, 연산, 중첩기능을 통하여 지형, 인구, 주택을 비롯한 각종 경제, 사회자료들이 센서스트랙 내지는 블락그룹 등 소규모 지역 단위의 주제도 혹은 주소 단위의 점묘도로 알아보기 쉽게 화면에 나타내어져 각종 도시현황분석에 신뢰성 있게 쓰일 수 있다. 둘째, 시설물의 입지결정은 사회가 다원화 될수록 시간이 오래 걸리고 구설수를 피할 수 없는데, GIS는 수치지도를 포함한 도시의 각종 자료들을 그대로, 변형하여, 모델링시키며, 또한 다양한 의사결정방법들과 결합하여 화면상에 표현하며 신속하고도 과학적인 의사결정을 이루는데 큰 역할을 담당할 수 있다고 본다. 결론적으로, GIS와 센서스를 비롯한 각종 도시정보들이 이와같이 결합되고 활용된다면 신속하고도 신뢰성 있는 도시현황분석과 시설물입지분석을 가능케하고, 궁극적으로 보다 나은 행정서비스를 이룰 수 있다고 본다.

  • PDF

토석채취지의 복구 실태 분석 (Analysis of the Restoration Actual Conditions on the Quarries)

  • 박재현;박종민;이준우
    • 한국환경복원기술학회지
    • /
    • 제13권3호
    • /
    • pp.128-142
    • /
    • 2010
  • This study examined the actual conditions of quarries. aiming to offer preliminary data to help with restoration efforts of quarries after extracting rock material. The results are as follows. As for the current state of business, a classification of all sites surveyed showed the ratio of ceased operations: ongoing operations: quarries under restoration to be 58:5:37. Classified by the permit area, the ratio of the number of quarries with areas less than $20,000m^2$ (2ha) : between $20,000m^2$ (2ha) and $50,000m^2$ (5ha) : $50,000m^2$ (5ha) or more was 15:60:25. The classification by use of the rocks showed the ratio of construction aggregate (such as civil construction material) : building material : craft material to be 60:28:12. The ratio of quarrying methods of bench cut : slope quarry : vertical quarry wall is 40:18:42. It is indicated that 85% of all quarries surveyed are difficult to reclaim while 15% seem to be easier to restore. Among all surveyed, 34 sites were considered to be extremely difficult to restore. 17 of the 34 sites (50%) were quarry walls almost vertical that have been neglected after extraction. 16 of them (47%) were underground quarries that have left quarry walls deep under the ground. For the remaining 1 site, there doesn't seem to be any need for reclamation as it became totally flat after the extraction.

차폐이론의 적용에 관한 연구 (A Study on the Applications of Shielding Theory)

  • 양한모
    • 대한교통학회지
    • /
    • 제20권5호
    • /
    • pp.55-66
    • /
    • 2002
  • 비행장 주위 상공에는 저고도로 이착륙하는 항공기의 안전운항을 위하여 장애물제한표면을 설정하여 이 표면 위로 건축물이 돌출하는 것을 제한하고 있으며, 장애물 표시를 의무화하고 있다. 그러나 이 구역 내에 제거가 불가능한 영구적 장애물이 있을 때는 그 장애물의 존재를 인정하고, 그 장애물 정상으로부터 일정한 간격의 안전고도를 유지하여 비행안전을 도모하면서도 장애물제한표면은 동시에 적용한다는 문제점이 있다. 따라서 영구적 장애물이 있는 경우에는 영구적 장애물보다 낮은 장애물은 장애물제한표면을 돌출했을지라도 비행안전에는 영향이 적다 라는 근거아래 차폐이론을 국제민간항공기구에서 권고 사항으로 채택하였으며, 미국을 비롯한 5개 국가에서 기존 장애물의 영향이 미치는 음영면 이하의 장애물에 대해서는 차폐이론을 적용하여 건축규제를 완화하거나 장애물표시등의 의무를 면제할 수 있도록 하고 있다. 본 연구에서는 차폐이론의 적용이 항공기의 운항 안전에 영향을 줄 수 있다는 가정 아래 문헌과 사례 연구를 통하여 그 영향을 검토하였다. 그 결과 장애물제한구역과 계기접근구역이 중복되는 구역에서는 신규 장애물의 설치가 비행안전과 운항에 영향을 줄 수도 있었다. 이런 영향을 제거하기 위해서는 각각의 비행장의 장애물제한표면 내에 해당 비행장에서 이용하고 있는 계기접근절차의 최종접근구역과 실패접근구역의 경계선을 도시하여 이 구역내에서는 차폐기준을 적용을 제한하는 것이 바람직하다.

GIS 플렛폼을 활용한 건축도면 및 자료 유지관리시스템 적용 사례연구 - 미국 버지니아주 리치몬드시청 건축도면 및 자료 유지관리시스템 사례연구 - (Case Study: Record Management & Maintenance System Implementation with Architectural Drawings on GIS Platform)

  • 정구철;소광호
    • 대한건축학회논문집:구조계
    • /
    • 제36권1호
    • /
    • pp.163-172
    • /
    • 2020
  • This study is a case study for in-house developed Record Maintenance and Management (RMMS) which is a digital data storage/retrieval system in a GIS-enabled solution. RMMS is designed for reorganizing submitted architectural drawings associated with scanned drawings files & geodatabase, managing metadata/table and geometric features in ArcSDE/Enterprise geodatabase format. The birth of the RMMS was borne out of a necessity for a modernized approach in digital file basis to provide improved customer services for various architectural drawings and associated with geo-spatial and its attribute information. Through a case study for building permit & review practice implemented on an internet-based Electronic Architectural administration Information System (EAIS) at the local governments in Korea, this study is able to derive differences between GIS-enabled RMMS system implemented in the Richmond City and internet-based EAIS system implemented in the local government in Korea. In an effort to be the most effective, it presents meaningful ways of maximizing efficiency in record maintenance & management system derived from the case studies that looked into in ways of a method in RMMS' operation, implementation on GIS platform, mutual interface among various programs with various digital files and finally technical supports and system development /upgrade.

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • 인간식물환경학회지
    • /
    • 제22권6호
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

Long-Term Wildfire Reconstruction: In Need of Focused and Dedicated Pre-Planning Efforts

  • Harris, William S.;Choi, Jin Ouk;Lim, Jaewon;Lee, Yong-Cheol
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.923-928
    • /
    • 2022
  • Wildfire disasters in the United States impact lives and livelihoods by destroying private homes, businesses, community facilities, and infrastructure. Disaster victims suffer from damaged houses, inadequate shelters, inoperable civil infrastructure, and homelessness coupled with long-term recovery and reconstruction processes. Cities and their neighboring communities require an enormous commitment for a full recovery for as long as disaster recovery processes last. State, county, and municipal governments inherently have the responsibility to establish and provide governance and public services for the benefit and well being of community members. Municipal governments' comprehensive and emergency response plans are the artifacts of planning efforts that guide accomplishing those duties. Typically these plans include preparation and response to natural disasters, including wildfires. The standard wildfire planning includes and outlines (1) a wildfire hazard assessment, (2) response approaches to prevent human injury and minimize damage to physical property, and (3) near- and long-term recovery and reconstruction efforts. There is often a high level of detail in the assessment section, but the level of detail and specificity significantly lessons to general approaches in the long-term recovery subsection. This paper aims to document the extent of wildfire preparedness at the county level in general, focusing on the long-term recovery subsections of municipal plans. Based on the identified challenges, the researchers provide recommendations for better longer-term recovery and reconstruction opportunities: 1) building permit requirements, 2) exploration of the use of modular construction, 3) address through relief from legislative requirements, and 4) early, simple, funding, and the aid application process.

  • PDF