• Title/Summary/Keyword: Building information modeling

Search Result 1,175, Processing Time 0.047 seconds

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Development of Modular Apartment Unit for Single Person Household Based on BIM (BIM 기반 1인 가구 모듈러 공동주택 유닛 개발)

  • Lee, Si-Hyeon;Yoo, Moo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.809-820
    • /
    • 2023
  • In contemporary society, there is a notable rise in single-person households, coupled with an increased demand for residential spaces, necessitating the exploration of suitable housing solutions. Modular architecture is gaining prominence as a method to deliver cost-effective and sustainable living spaces efficiently. This study introduces a method for optimizing the design and construction processes of modular building units through Building Information Modeling(BIM) technology. It involves an analysis of factors that enhance living quality and meet the housing needs of single-person households. Utilizing BIM, a resource-efficient and cost-efficient modular apartment unit has been developed. BIM facilitates the visualization and integration of architectural components, thereby reducing design errors and enhancing productivity. This research evaluates both the benefits and constraints of modular architecture. Modular constructions, when combined with BIM, emerge as a potent solution for housing challenges, enriching the quality and variety of residential options. Nevertheless, considerations such as technical prerequisites and financial implications are also discussed. The study showcases the potential and merits of utilizing BIM for designing apartment units tailored to single-person households, offering a viable approach to ameliorate their living conditions.

Monitoring-Based Building Energy Commissioning Technology (모니터링 기반 건물 에너지 커미셔닝 기술)

  • Lee, Sang-hak
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.7
    • /
    • pp.765-767
    • /
    • 2016
  • Building Energy commissioning is a process in which verifying and making the document during entire lifetime including planning, design, construction, test run of equipment, and maintenance to minimize the operational problems of building energy efficiency. The general commissioning is replacing the equipment or reconstructing the skin to achieve the performance for the design. This process is expensive and has the disadvantage of taking a long payback period by one operation. In this paper, we studied the monitoring-based commissioning (MBCx) to increase the energy efficiency of buildings through analyzing energy use data. MBCx is modeling a building energy, comparing the real energy use with it, detecting the cause of falling the efficiency, and running the optimal operation regularly.

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information (형상정보가 없는 공종의 속성정보모델링 기법 개발에 관한 연구)

  • Lee, Min-Cheol;Lee, Sang-Jin;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.114-125
    • /
    • 2011
  • Construction industries worldwide have moved to Building Information Modeling environment in conjunction with IT technology progress. Korean domestic construction market is in the midst of enthusiastically adopting BIM technique and the public sectors try to apply the method to their projects. Difficulties have been introduced, however, in doing so mainly due to the complexity in reflecting the distinctions of the public cost estimate requirements to BIM modeling. The main objective of this study is to propose four kinds of BIM property information modeling methodologies which would be used in the quantity surveys of the public construction projects. To evaluate the applicability of the suggested modeling methods, the research performed a case study.

3D Building Reconstructions for Urban Modeling using Line Junction Features

  • Lee, Kyu-Won
    • Journal of information and communication convergence engineering
    • /
    • v.5 no.1
    • /
    • pp.78-82
    • /
    • 2007
  • This paper propose a building reconstruction method of urban area for a 3D GIS with stereo images. The 3D reconstruction is performed by the grouping 3D line segments extracted from the stereo matching of salient edges which are derived from multiple images. The grouping is achieved by conditions of degrees and distances between lines. Building objects are determined by the junction combinations of the grouped line segments. The proposed algorithm demonstrates effective results of 3D reconstruction of buildings with 2D aerial images.

Building Information Modeling for Temporary Structure Planning and Safety Analysis (BIM을 활용한 가설물 계획 및 안전 관리)

  • Kim, Kyungki;Cho, Yong Kwon;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.12-18
    • /
    • 2016
  • The entire construction safety is significantly influenced by proper uses of temporary structures. However, in current practices, temporary structures are used without sufficient planning and analysis on their impact on safety. Consequently, problems in worker safety and loss of productivity are frequently caused related to temporary structures. This paper introduces an approach that uses Building Information Modeling (BIM) to automatically create temporary structures as part of construction plans and identifies potential safety hazards related to the temporary structures. In this study, the type of temporary structure is limited to scaffolding. Automation algorithms were developed and applied to (1) analyze daily construction site conditions (2) create required scaffolding objects, and (3) identify potential safety hazards related to scaffolding. A case study using a real-world construction project demonstrated that scaffolding objects were properly created based on user-input and potential safety hazards were successfully identified without human intervention.

An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object (BIM 기반의 공간객체를 이용한 물량산출 정확성 분석)

  • Cha, You-Na;Kim, Seong-Ah;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.