Due to recent trends of the atypical plan shapes and the zoning construction in high-rise buildings, the building stability under construction is arising as an important issue for design and construction plan. To ensure the stability under construction, the differential column shortening and the lateral movements with unbalanced distributions of self-weight of structure members and the load flows before completion of member connections and lateral load resisting system should be checked by construction sequence analysis. This paper presents the scheme of zone-based construction sequence analysis, to check the stability of high-rise building under construction. This scheme is applied to the construction sequence analysis for real high-rise building under construction.
This paper reflects on the structural design of Haut; a 21-storey high-end residential development in Amsterdam, the Netherlands. Construction started in 2019 and is in progress at the time of writing. Upon completion in 2021, Haut will be the first residential building in the Netherlands to achieve a 'BREEAM-outstanding' classification. The building will reach a height of 73 m, making it the highest timber structure in the Netherlands. It contains some 14.500 ㎡ of predominantly residential functions. It features a hybrid concrete-timber stability system and concrete-timber floor panels. This paper describes the concepts behind the structural design for Haut and will touch upon the main challenges that have arisen from the specific combination of characteristics of the project. The paper describes the design of the stability system and -floor system, the analysis of differential movements between concrete and timber structures and wind vibrations. The paper aims to show how the design team has met these specific challenges by implementing a holistic design approach and integrating market knowledge at an early stage of the design.
The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user and administrator viewpoint.
It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.
The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user viewpoint.
The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.
이 연구는 아파트 화재의 대형화를 막기 위해 소방공사감리원의 업무수행능력에 따른 완공검사결과와 소방공사감리원의 성능시험 공기확보의 필요성에 따른 완공검사결과 및 완공검사증명서 발급 후 소방시설 등의 하자 유무상태에 따른 요인을 분석하여 완공검사 결과를 측정하여 소방공사감리원의 업무수행능력을 향상시키 위한 것이다. 연구의 결과를 요약하면 첫째, 소방공사감리원의 업무수행능력에 따라 아파트 완공검사결과에 영향을 미치는 것으로 직업별로 소방공무원보다 소방시설설계업 및 소방공사감리업 종사자가 소방공사감리원의 업무수행능력에 따라 아파트 완공검사 결과 정도는 유의하게 높게 나타났다. 그러므로 아파트에는 아파트 공사감리 경력이 있는 사람을 감리원으로 배치하여 소방공사감리원의 업무수행능력을 향상시킬 필요가 있다. 둘째, 소방공사감리원의 성능시험 공기확보 필요성에 대한 완공검사 결과는 직업별로 소방공무원보다 소방시설설계업 및 소방공사감리업 종사자의 성능시험에 대한 공기확보 필요성이 유의하게 높은 것으로 분석 되었다. 이를 개선하기 위해 건축 준공일까지 완공검사를 할 수 있도록 하며 발주처에서는 완공검사증명서를 건축준공일에 임박하여 발급받도록 강요하지 않도록 장치를 마련할 필요가 있다. 마지막으로, 완공검사증명서 발급 후 완공검사의 하자가 완공검사 결과에 영향을 미치는 것으로 발주자(건축주. 감독관) 종사자보다 소방시설설계업 및 소방공사감리업체 종사자가 유의하게 낮게 분석되었다. 이는 소방시설공사를 마치지 않은 상황에서 발주처. 건설사가 완공검사증명서의 발급을 요구함에 따라 완공검사증명서 발급 후 소방시설 등에 하자가 발생하여 완공검사 결과에 영향을 미친 것으로 분석된다.
중층 철근콘크리트 주거형 건물은 국내에서 많은 비중을 차하며, 이러한 건물의 시공단계에서 발생 될 수 있는 문제에 대한 구조성능 분석이 필요하다. 이를 위하여, 25층 규모의 중층 철근콘크리트 주거형 건물을 예제모델로 선정해 구조성능 분석을 진행하였다. 예제모델을 5층, 10층, 15층, 20층, 25층의 시공단계 모델과 설계가 완료된 완공단계 모델로 구분해 구조해석을 수행하였다. 완공단계와 시공단계 모델들에 대하여, 고유치해석, 횡력저항성능, 완공단계에서의 설계강도비와 시공단계에서의 설계강도비를 비교를 통한 단면성능 검토를 수행하였다. 검토 결과, 시공단계와 완공단계 모두 횡변위와 층간변위비에서 건축구조기준 제한을 초과하지 않았는 것을 확인하였고, 단면성능 검토에서는 벽체의 일부 데이터를 제외한 모든 부재에서 구조적 안전성을 확인하였다. 따라서, 중층 철근콘크리트 주거형 건물의 완공단계에서 구조적 안정성이 확보되면 시공단계에서도 구조적 안정성 학보가 이루어진다는 결론을 도출할 수 있었다.
Structural health monitoring is becoming more and more important in the domain of civil engineering as a proper mean to increase and maintain the safety, especially in the land of earthquakes like Japan. In many civil structures, the deformations are the most relevant parameter to be monitored. In this context, a monitoring technology based on the use of long-gage fiber optic deformation sensor, SOFO is being applied to a 33-floors tall building in Tokyo. Sensors were installed on the $2^{nd}$ floor's steel columns of the building on May 2005 in the early stage of the construction. The installed SOFO sensors were dynamic compatible ones which enable both static and dynamic measurements. The monitoring is to be performed during the whole lifespan of the building. During the construction, static deformations of the columns had been measured on a regular basis using a reading unit for static measurement and dynamic deformation measurements were occasionally conducted using a reading unit for dynamic measurement. The building was completed on August 2006. After the completion, static and dynamic deformation measurements have been continuing. This paper describes a health monitoring technology, SOFO system which is applicable to high-rise buildings and monitoring results of a 33-floors tall building in Tokyo from May 2005 to October 2010.
The repair and maintenance planning is the principal transaction to prevent from the degradation of apartment buildings to prolong their lives. Various building components as part of living area should be maintained properly and timely before critical defects are realized, then the building life might be extended until the limit of its usability. In other words, various building components such as utilities, finishes and structural members are needed to be repaired and replaced in different time interval after completion. To do this systematically, a maintenance management system for Long-Range Planning (LRP) needs developing. The LRP should be figured out based on the forecast of repairing and replacing cycle of building components according to work trades. And the precise forecast of repairing and replacing time of the components helps to enhance the usability of the developed system. The purpose of this paper is to suggest a system with which apartment building managers carry out the tasks of periodical check, diagnosis and replacement of building components based on the maintenance calendar. By using the system, they can easily forecast repairing and replacing time of the components with the consideration of life cycle of building materials and build the LRP.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.