• Title/Summary/Keyword: Building Site

Search Result 2,257, Processing Time 0.03 seconds

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

A Study on the Architectural Characteristics of Pilamseowon (필암서원(筆巖書院)의 건축(建築) 변천과정(變遷過程)에 관(關)한 연구(硏究))

  • Zo, Sang-Soon;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.7 no.2 s.15
    • /
    • pp.63-76
    • /
    • 1998
  • Seowon(書院) was an institute for education and sacrificial rite, established privately in rural villages throughout the middle period of the Chosun dynasty(1392-1910), where scholars researched classic studies, cultivated personal characters in accordance with the Neo-Confucianism, nurtured young disciples, and performed rites at a secluded shrine where spiritual tablets of honorees were housed. This study examines the architectural characteristics of Pilamseowon(筆巖書院) in Chans'seong, Chollanamdo Province, Korea. Through the study, the architectural characteristics of Pilamseowon were found as follows: First, Pilamseowon moved twice since it had been established. Second, through the moving, the area of Pilamseowon was expanded and buildings were added. Third, some buildings of Pilamseowon reflect the previous condition of the seowon site. Take Hwakyeonroo(廓然樓) as an example, which is the main entrance pavilion of Pilamseowon. Pavilion is an appropriate type of building in sloped site. Before Hwakyeonroo was moved to the present site, it was located on sloped site, where Hwakyeonroo accordingly took the pavilion type of building. Present site condition of Pilamseowon is plane, nonetheless, Hwakyeonroo has the pavilion type of building, which reflects the previous condition of the building site. Forth, Pilamseowon consists of six spatial domains and each domain has its own entrance gate to outer area.

  • PDF

A Study on the Historic Changes of Yungnam-Ru in Historic Periods and Architectural Building Forms (밀양 영남루 연혁 및 건축형식 변천에 관한 연구)

  • Lee, Ho-Yeol
    • Journal of architectural history
    • /
    • v.9 no.1 s.22
    • /
    • pp.7-25
    • /
    • 2000
  • The purpose of this study is focused to the historic changes of Yungnam-Ru(嶺南樓), which are based on the site layout, and architectural forms in architectural building history and historic periods analyzed with the historic reference, paintings, and photos. This study is to search the alteration of the types of axis and the formation of spaces in Yungnam-Ru which is the Ru-Gak(樓閣) The conclusion of the architectural changes from the historic period and architectural form which is the belows. The first Yungnam-Ru by name had been used to be called, before it was re-called Yungnam-Ru by Kim Ju in 1365. Therefore, the hypothesis in naming Yungnam-Ru form assumption that the building under the name of Yungnam-Ru was re-named by Kim Ju from the Old Budist Temple called Yungnam-Sa, should re-considered in history. The second, it is considered that Milyang-Sibyi-Kyungdo(密陽十二景圖) as the painting can only be seen the site layout in 1542. It could be compared the differences of the site layouts from in 1542 to the present time. At that time Nyungpadang(凌派堂) was connected the main buildings called Yungnam-Ru Chimrudang(沈流堂),building was seperated with the Yungnam-Ru at that period. In 1542, the main Building(Yungnam-Ru) was consist of 5 spans of columns(from the front) and 2 spans of columns(from the side). Now, the main Building(Yungnam-Ru) has the 5 spans of columns from the front, and two spans of columns short from the side, compared to the present facade. At the past, Chimrudang(building) has the two spans of columns and one span of columns short, compared to the present facade. The third, It supposed that main building, Nyungpadang and Chimrudang in the composite of facade was connected with Wolrang(月廊) and Hunrang(軒廊) after invatioin from japan in 1592. 1844, (Chosun dynasty, Hunjong 10) the Yungnam-Ru was re-builted by maintaining the same concept in site layout of the past, and finally the three buildings was put together with Wolrang and Hunrang. As a result, the plan of the Yungnam-Ru was expanded with many aspects. From 1542 to 1844, the present site-layout gradually completed with three buildings which was spatially connected. The forth, in the middle age of Chosun dynasty, after added Gaeksa(客舍), the building is for the government officer staying temporally from outside province) in the site, the site layout was greatly changed with volume of building. In 1844, the Yungnam-Ru as the Nugak belongs to Miljukwan(密州館) was expanded spacially and formally. After that time, the burned buildings could not have been re-built because of aspects in government ability and economical ability.

  • PDF

The metallurgical Analysis of a Bronze-Lumps from the Third Building Site at Neungsan-ri Temple Site (능산리절터 제3건물지 출토 청동덩어리에 대한 금속학적 분석)

  • Rho, Tae-Cheon
    • Journal of Conservation Science
    • /
    • v.10 no.1 s.13
    • /
    • pp.31-37
    • /
    • 2001
  • The metallurgical investigation of four lumps of bronze from the third building site of the northern workshop site at the Neungsan-ri temple site in Buyeo was performed. The microstructures of a section of sample was observed by SEM and qualitative and quantitative analysis of the sample was performed by EDS. The results are as follows: Sample 1 of the lump of bronze from northern workshop site in the third building site at Neungsan-ri temple site and sample 2 are speculated to be low-quality bronze resulting from refinery of matte which formed on the process of bronze refinery. Sample 3 is speculated as a lump of bronze which is one of Cu-Sn system and the one made by alloy only with pure bronze and tin on the process of bronze refinery. Sample 4 is confirmed as a lump of bronze which is one of Cu-Sn-Pb system from alloy of tin and lead into pure bronze. It is believed that the third building site at Neungsan-ri temple site in Buyeo produced bronze matte by refinery of copper ore or produced low-quality bronze by melting matte imported from outside.

  • PDF

Integrated Object Detection and Blockchain Framework for Remote Safety Inspection at Construction Sites

  • Kim, Dohyeong;Yang, Jaehun;Anjum, Sharjeel;Lee, Dongmin;Pyeon, Jae-ho;Park, Chansik;Lee, Doyeop
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.136-144
    • /
    • 2022
  • Construction sites are characterized by dangerous situations and environments that cause fatal accidents. Potential risk detection needs to be improved by continuously monitoring site conditions. However, the current labor-intensive inspection practice has many limitations in monitoring dangerous conditions at construction sites. Computer vision technology that can quickly analyze and collect site conditions from images has been in the spotlight as a solution. Nonetheless, inspection results obtained via computer vision are still stored and managed in centralized systems vulnerable to tampering with information by the central node. Blockchain has been used as a reliable and efficient decentralized information management system. Despite its potential, only limited research has been conducted integrating computer vision and blockchain. Therefore, to solve the current safety management problems, the authors propose a framework for construction site inspection that integrates object detection and blockchain network, enabling efficient and reliable remote inspection. Object detection is applied to enable the automatic analysis of site safety conditions. As a result, the workload of safety managers can be reduced with inspection results stored and distributed reliably through the blockchain network. In addition, errors or forgery in the inspection process can be automatically prevented and verified through a smart contract. As site safety conditions are reliably shared with project participants, project participants can remotely inspect site conditions and make safety-related decisions in trust.

  • PDF

Study on the character of architecture remains in Gwangmyeong-dong site, Geongju (경주 광명동유적 건물지의 성격에 대하여)

  • Kim, Kwang-Su
    • Journal of architectural history
    • /
    • v.23 no.5
    • /
    • pp.37-45
    • /
    • 2014
  • It was identified by the excavation that architecture remains were confirmed buddhist temple consist of ruins of main building of a temple, auditorium site, ruins of stone pagoda, embankment, pedestrian Facilities and drainage etc. in the Gwangmyeong-dong site. The site has been held temple arrangement with 1 main building of a temple, twin Pagodas from the Unified Silla period to Goryeo dynasty. The temple constructed after that was destroyed the architecture in the Unified Silla period. It seems that aristocrat or royalty power of within group of the nearby remains of city which was constructed in the Unified Silla period build and visit the temple. Considering there are excavations, it assumes that the temple had been constructed during the last days of the Unified Silla, was closed up during the mid-Goryeo Dynasty.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

Research on Digital Construction Site Management Using Drone and Vision Processing Technology (드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구)

  • Seo, Min Jo;Park, Kyung Kyu;Lee, Seung Been;Kim, Si Uk;Choi, Won Jun;Kim, Chee Kyeung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

Insulation Performance Evaluation of Apartment Housing Using Infra-red Camera (적외선 열화상을 이용한 공동주택 단열성능 평가 - TDR(온도상대비)을 중심으로 -)

  • Choi, Bo-Hye;Choi, Gyoung-Seok;Kang, Jae-Sik;Lee, Seung-Eon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.718-723
    • /
    • 2009
  • The purpose of this study is to present an in-site evaluation method for building insulation performance using Infra-red camera. The research contents of this study are to evaluate validity and suitability of building insulation defect survey using Infra-red camera for apartment housing with temperature & heat flow pattern analyze method. By establishing the in-site evaluation method building insulation performance using infra-red camera, it is expected that 1) building envelope repair market will be activated by using developed method in ESCO and remodeling companies, 2) the method developed in this research will contribute to reduce national energy consumption by promoting old building insulation remodeling.

  • PDF

A Study on the Improvement of Green Building Certification Information System (친환경건축물 인증제도 활성화를 위한 정보시스템 개선 연구)

  • Ryu, Soo-Hoon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.3
    • /
    • pp.5-16
    • /
    • 2011
  • This study aims for improvement and rebuilding of the 'Green Building Certification Criteria Information System;GBCCIS'. To achieve this, improved information system has developed self-assessment program available on the web and to provide data about the target of Green Building Certification based on the 2010 revised criteria. The target building of Green Building Certification is Apartment, Office, Mixed-Use Building, School, property for sale, accommodation, and other facilities. Also, the information system about the Green building related technologies and techniques to take advantage of offer a variety of information was built. Green Building Certification Criteria web-site Established in this study has information and each menu and contents are linked to organic and high-utilization. Each menu is organized according to the used frequency and the group. Also this web-site is composed of information guide field, core service field, and other field. These improvement of Green Building Certification Criteria Information System can be a positive incentive measures for the activation of Green Building Certification Criteria easily by taking advantage of relevant information by users. And these will be possible to planning development of Green building technologies by introducing the latest Green building construction techniques applicable building. Also, to assess in advance by using self-assessment program in the design phase of building will lead to Green building design and provide the convenience of the application process and through database construction and share information of building assessment resources certified Green Building Certification Criteria will lead to the containment and fair assessment between cation authorities.