• Title/Summary/Keyword: Building Site

Search Result 2,257, Processing Time 0.026 seconds

A Study on Facility and Satisfaction of Han River Citizen's Park - A Case Study of Ttuksum District - (한강시민공원 시설이용도 및 만족도에 관한 연구 - 한강시민공원 뚝섬지구를 중심으로 -)

  • Kim, Sung-Uk;Jung, Tae-Yeol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.2
    • /
    • pp.59-68
    • /
    • 2013
  • This study facility use and satisfaction of the users of Han River Citizen's Park in Ttuksum district in order to provide foundational data necessary for planning and designing to enhance general user satisfaction when building new riverside parks or reorganizing existing riverside parks. In order to do so, the study surveyed and analyzed the user satisfaction of 374 men and women who use Ttuksum district located in Han River Citizen's Park. For this study, data were collected by self-administration method from 374 samples selected by the convenience sampling method. The results are as follows. 1) Users of Ttuksum district than male. The distribution of related accessibility, those residing within 5 kilometers the site it frequently. 2) Use it for walk, relaxation, or exercise. Are often accompanied by friends or family. Also, about the facility use by the purpose of use or characteristics of conpany, the grass square was utilized the most. 3) About user satisfaction with the park facilities in Ttuksum district, it was higher in the grass square(3.95), sport facilities(3.73), and music fountain(3.72) in order. Regarding the specialized park facilities, satisfaction was mostly low except for the music fountain. Also, about the satisfaction with the usability or view, accessibility(4.03) and night view(3.90) were. Based on the results of this study, it to proceed with positive verification processes in the follow-up research order to enhance reliability of those results.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF

The Value and Change of the Forest Village Bugundang in Itaewon, Seoul (서울 이태원 부군당(府君堂) 마을 숲의 변천과 가치)

  • Kim, Hai-Gyoung;Kim, Young-Soo
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.31 no.2
    • /
    • pp.58-69
    • /
    • 2013
  • This research try to review about individuals' living culture place by record to before process of transition and modify of Bugundang village's forest in Itaewon. A result is as follows. First, Itaewon Bugundang is located in highest site of center building of twon forest, it has been preserve by double fence and taboo subject. Physical element of village forest is a factor which give sanctity of Buhundang. Second, it is connecting Namsan and Yongsan Family Park as green space. Also Itaewon Bugundang isolated from the current residential area. but in the past, the main beliefs and rituals of its area are responsible for a diverse community where public service was strong. Itaewon Bugundang have played a role presenting a local taboos and social norms. Therefore, these elements of the local community have the traditional cultural values. Third, Zelkova and Kalopanax pictus need to be preserved the value by the Seoul Metropolitan Government. Fourth, components of Bugundang are built by Hwajucheong, Dangjigi house, seonangdan, monument, fence, masonry and various trees. And the function and role of each of these elements remains as traditional culture. And the structural features of historic architectural properties has the value as a registered cultural properties. Fifth, due to these features, the traditional landscape of Itaewon bugundang play a role succeeding disappearing traditional culture and is worth as a potentially valuable landscape elements. This study has significance to the excavation community tradition disappearing landscape and excavation of candidate new tradition.

Numerical Analysis on Flow and Bed Change Characteristics by Discharge Variations at the Confluence of Nakdong and Geumho Rivers (낙동강과 금호강 합류부 구간에서 유입유량에 따른 흐름 및 하상변동 특성 변화에 관한 수치모의 연구)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.659-667
    • /
    • 2017
  • This study analyzes the changes in the flow characteristics due to the difference in inflow discharges from the main channel and tributary at the confluence of the Nakdong and Geumho Rivers. The analysis was done using a two-dimensional numerical method. The study site has complicated flow patterns because of the discharge variation from the main stream and tributary. The study section has a meandering main channel, and the hydraulic characteristics cannot be defined with simple conditions such as the confluence angle of the channels or the ratio of the channel widths. An actual flood event in 2012 was applied in the numerical simulation. The maximum velocity occurred in the meandering section after passing the confluence, where a rapid change was expected. A high velocity and large bed change in this section were observed in the simulation results. The variation of discharges from the main channel and tributary was a more dominant factor in the flow and bed changes for the normal flow conditions than the flood event. This indicates that countermeasures for channel stabilization should be considered in the meandering section downstream of the confluence section, and countermeasures for the study section should be investigated.

Application of Total Station for Structure and Terrain Displacement Monitoring (구조물 및 지형변위 모니터링을 위한 토털스테이션의 활용)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.582-587
    • /
    • 2020
  • Recently, disasters caused by extreme weather and the damage caused by them are increasing worldwide. The interest in disasters, such as earthquakes, typhoons, and ground subsidence, is increasing in Korea. Korea has enacted a special law based on disaster management, and has built monitoring systems for individual facility units by building precision sensors and related systems to measure the displacement status of long bridges and high-rise composite buildings. On the other hand, the application of a real-time monitoring system is insufficient for slopes, open-pit mines, small and medium structures due to weather, measurement methods, cost, and constant monitoring difficulties. In this study, the displacement monitoring method using the total station was studied and the applicability was suggested through the experiment. Through the research, the concept and operation flow of a monitoring system that can measure the displacement of the terrain or the structure using the total station was presented. The monitoring system allows the user to select the location and operation method of the equipment so that the equipment can be installed according to the site situation, and set the number of observations, the period, and the observation range of the object. Using the experiment on the monitoring system, the station was monitored with precision within 5mm, and it was suggested that the displacement of the object can be monitored using the total station. Further research will be needed to assess the applicability of monitoring to real slopes and structures.

A Study on the Plan of Inundation Response of Skyscrapers with Evacuation Route Calculation (대피경로 산정을 통한 초고층 건축물의 침수 대피 방안에 관한 연구)

  • Kim, Joon-Ha;Kim, Tae-Heon;Jung, Jae-Wook
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.123-132
    • /
    • 2020
  • Purpose: In this study, the authors propose a flood evacuation plan for skyscrapers with law related to underground space of skyscrapers, domestic and international underground space flood case study and simulation test. Method: This study compares the evacuation pattern of various case from flooded underground spaces extending over several floors with respect to the number of evacuation routes with. Also, simulation test was performed by setting up the virtual underground spaces consisting of three-stories basement and changing the number of the ground entrance, area of the basement and the flooding heights of the basement. Result: There was no difference in evacuation route according to the inundation risk even if there was an area corresponding to risk level 4. This is because the risk in the starting area is greater than that in the evacuation route. Especially, even if the risk of evacuation route increases with time, there is no change in route because the route must be passed to reach the evacuation site. Conclusion: In this study, there was no difference in evacuation route according to the inundation risk. However, if the size and shape of the underground space of each building is different, the depth of inundation with time may be different.

Structural Evolution on Ag/Si(111) Ag/Si(111)√3X√3 with Adatom Coverage (흡착원자의 덮임율에 따른 Ag/Si(111)√3X√3의 구조 변화)

  • Jeong, Ho-Jin;Jeong, Suk-Min
    • Journal of the Korean Vacuum Society
    • /
    • v.17 no.5
    • /
    • pp.387-393
    • /
    • 2008
  • Using a first-principles total-energy method, we investigate structural and energy changes on Ag/Si(111)$\sqrt{3}{\times}\sqrt{3}$($\sqrt{3}-Ag$ hereafter) as the number of the additional Ag adatoms increases. The Ag coverage varies from 0.02 to 0.14 ML. Most Ag adatoms occupy the ST site, which is the center of small triangles of the substrate Ag layer that is composed of small and large triangles. One of the interesting adsorption features is that the adatoms immerse below the substrate layer. The total energy calculations show that the clusters become the most stable when the number of Ag atoms is three. This three-Ag cluster becomes the building block of the $\sqrt{21}{\times}\sqrt{21}$ phase that shows a large surface conductivity. The simulated STM images show that the adatoms look dark in filled-state images while bright in empty-state images. This suggests that the adatoms donate their charge to the substrate. The simulated STM images agree well with the experimental images.

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.

Economic Effects of Changes in Spatial Accessibility on Regional Tourism Expenditure Structure (공간적 접근성 변화가 지역관광지출구조에 미치는 경제적 효과 분석)

  • Kwon, Young-Hyun;Shin, Hye-Won
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.135-149
    • /
    • 2019
  • This article analyzed economic effects of changes in spatial accessibility on regional touruism expenditure structure resulting from highway investments on Gangwon province, Korea. The Seemingly Unrelated Regress(SUR) model is applied to analyze the structure of change in tourism expenditure of Gangwon Province, and the competition and complementary relationship of tourist demand were analyzed among 18 counties in Gangwon by Dendrinos-Sonis method. The spatial accessibility has a significant effect on the increase in amount of tourist expenditure, but by 1% increase in the accessibility resulted in a reduction of length of stay -0.18% and travel costs -0.34% by respectively. The most powerful variable for improving the on-site economy is the tourist service establishment, which increases one unit, the amount of tourist expenditure increased by 3.6%. Moreover, the competition and supplemental relationship of tourism demands in Gangwon was decided by the conditions under which traffic flow with passing occurred, such as inland or ocean-typed travel attractions, adjacent or remote regions to the highway. The limitations of this study were not able to use raw data of tourism expenditures before and after the opening the highway due to the restriction of priority data, and further research on the appropriate level of spatial accessibility for the regional economy is needed.

The Maintenance Process Model using BPMN Method in Public Rental Housing (BPMN 방식을 이용한 공공임대주택 유지관리 업무 프로세스 모델)

  • Park, Kyung-Mo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.743-751
    • /
    • 2016
  • It is critical to effectively change the measures of prevention from the breakdown maintenance proceeding an apartment housing maintenance task scope. It is necessary that systematization be performed for a series of tasks, such as facility inspection, diagnosis and replacement. In addition, it is preceded by establishing a standardization for maintenance work scope. Therefore, this study examined the problems related to public rental housing maintenance work scope to manage it more systematically. In addition, the study suggests a work process section for facility repairs, long term replacement and general maintenance using one on one interviews with experts to classify the occupants, management office and head office. This study's standard work system is expected to provide fairness and transparency in addition to improving the productivity in public rental housing maintenance via an efficiency promotion plan. In addition, it is used as the basic reference for developing a system of public rental housing maintenance costs and diagnosis actions. Finally, it is necessary to create improvements that provide a more objective work system standardization throughout the analysis of the productivity data according to the work flow and the review of the occupants, management office and head office in the future applications of the pilot site.