• Title/Summary/Keyword: Building Site

Search Result 2,253, Processing Time 0.028 seconds

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.

Earth Building Characteristic Analysis to Utilize in Architecture Plan (건축 계획적 활용을 위한 흙건축 특성분석)

  • Lee, jang-hyuk;Hwang, hey-zoo;Kim, Jeong-Gyu
    • KIEAE Journal
    • /
    • v.7 no.4
    • /
    • pp.3-8
    • /
    • 2007
  • This study is aimed to apply basic data to planning earth building through analyzing characteristics of earth building. For doing it, we investigated a research paper in advanced countries(New zealand, Australia, etc.) that has been used for earth building standards for a long time, and then we corrected inadequate standards that would apply our earth building environment. As a result, we can devide earth characteristics into three parts that are materials, plan, and maintenance and repair. First, as material selection is very important factor, a general plan is possible to change in accordance with what material is selected. These methods that made mud brick, pressed earth block, rammed earth, cob have been well used during the current 30 years in earth building. Second, the plan is composed of site select and architecture plan. In architecture plan, we should consider from foundation to eaves protection, and in site selection, consider sides of the environment and the social. Third, we should always check a periodical inspection through watchful observation because earth buildings need more time and efforts in maintaining and repairing than others.

A Study on the Evaluating Indicators for Housing Plan on Slope-Site (시가지내 경사지 아파트단지 계획의 평가지표에 관한 연구)

  • Oh, Se-Wook;Lee, Jin-Wook;Ha, Jae-Myung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2004.11a
    • /
    • pp.215-220
    • /
    • 2004
  • The purpose of this study is to develope evaluating indicators for housing plan on slope-site. At first, housing plan elements were derived from existing studies, and then, the importance of elements were evaluated by expert group. AHP(Analytic Hierarchy Process) was used to calculate the weight of housing plan elements on slope-site. The results are as follows: 'building layout' is relatively important, and followed important elements are selected as 'pedestrian circulation' and 'parking plan', and then, detail elements for building layout, 'daylight', 'view', 'privacy' and 'using level' are all relatively important.

  • PDF

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

Recycling of In-site waste soil material to fill a hollow between PHC pile and Earthen wall

  • Jang, Myung-Houn;Choi, Hee-Bok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.510-517
    • /
    • 2012
  • This study evaluated the recycling potential of in-site waste soil as pile back filling material (PBFM). We performed experiments to check workability, segregation resistance, bond strength, direct shear stress test, and dynamic load test using in-site waste soil in coastal areas. We found that PBFM showed better performance than general cement paste in terms of workability, segregation resistance, and bond strength. On the other hand, the structural performance of PBFM was slightly lower than that of general cement paste due to the skin friction force of pile by Pile Driving Analyzer and direct shear stress. However, because this type of performance degradation in terms of structure can be improved through the use of piles with larger diameter or by changing the type of pile, considering the economics and environment, we considered that recycling of PBFM has sufficient value.

A Study on Factors Affecting Changes in Estimating Standards in Plaster Work (미장공사의 품기준 변화 요인에 관한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

Measurements and Analysis of Vibration on Construction Site (공사현장에서 발생하는 진동 측정 및 영향 분석)

  • Moon, Ka-Eun;Rhim, Hong-Chul;Jeong, Byung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.3-4
    • /
    • 2015
  • Vibration occur at construction sites due to various causes. Starting from the movement of heavy equipments and construction vehicles, the machine crushing of embedded obstacles and rocks creates not only noise but also vibration. Furthermore, the blasting of rocks tops the other causes. In this paper, the measurements of various vibration occurring at the construction site are made and analyzed to determine the magnitude of vibration upon different sources of vibration. The results showed the relative magnitude of vibration for the site studied.

  • PDF

Analysis of manpower-dependent window cleaning work through on-site investigation (현장조사를 통한 인력의존형 유리창 청소 작업분석)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.138-139
    • /
    • 2018
  • The purpose of this study is to analyze the work of the existing manpower dependent cleaning method by investigating the window cleaning site. In this study, detailed work contents were confirmed by on-site investigation and interview with experts, and the relationship, procedure, repetition work, and time required for each work were analyzed. The future analysis results will be used as a basic data for comparative analysis of productivity and economical efficiency with the window cleaning device to be developed.

  • PDF

A comparative analysis study of Green Building Certification Criteria - Focusing on the site and environment (친환경건축물인증제도의 외부환경요소적용에 관한 연구 - Site/environment를 중심으로)

  • Park, Chan-Hyuk;Oh, Myung-Won;Kim, Byung-Sun
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.324-329
    • /
    • 2009
  • This paper is to provide problems and changes to be don Korean Green Building Certification Criteria, which are similar to American Leed certification and Japanese CASBBE, reorganizing and comparing those systems with domestic system. Normally, those certification program is very similar, but have some differences in the view to the site and environment chapter. That difference will be change to the right way that protect the nature states of the environment. Therefore, this study is going to base data to first step of the process for modify the differency problem.

  • PDF

A Study on the Application of Quality Management to Fire Door Construction (방화문 시공시 현장품질관리지침 적용에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.90-91
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. Accordingly, on-site quality management and maintenance guideline for fire doors were presented. In this paper, we tried to explain the requirements for the construction of fire doors during the on-site quality management and maintenance guideline for fire doors presented in the study.

  • PDF