UAV-Based Remote Sensing Survey for Quantification of Beach Fill Construction Projects

  • Gavin JACKSON;Junshan LIU;Scott KRAMER
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.399-406
    • /
    • 2024
  • This research paper explores the integration of Unmanned Aerial Vehicle (UAV)-based remote sensing survey methods, specifically LiDAR and photogrammetry, into the measurement and payment processes of beach fill construction projects managed by the U.S. Army Corps of Engineers (USACE). The primary objective is to evaluate the feasibility, accuracy, and cost-effectiveness of UAV technology in contrast to traditional topographic and hydrographic survey methods. The methodology includes a comprehensive literature review, case studies, accuracy standard assessments, and a detailed cost comparison between conventional and UAV-based survey techniques. The findings reveal that UAV-based remote sensing can offer significant improvements in terms of efficiency and cost savings. UAVs are capable of capturing large data volumes quickly with reduced manpower and equipment needs. However, the accuracy of UAV surveys is contingent upon environmental conditions and the proper staging of control points. Moreover, the initial investment and operational costs of UAV equipment are substantial and warrant further analysis. The paper argues for flexibility in measurement and payment methodologies during the project design phase to accommodate UAV technology. While environmental conditions may occasionally necessitate traditional survey methods, the study suggests that regions like the Florida Peninsula, with clearer water and more favorable weather, are particularly well-suited for the implementation of UAV-based surveys. The significance of this study lies in its potential to guide future beach fill construction projects, promoting more efficient and cost-effective survey methods while adhering to accuracy standards and environmental considerations.

Quantitative Study on Sustainability of Building Construction in Japan from Perspective of Recent Changes in Building Status and Trends

  • Atushi TAMURA;Koya UTSUMI;Akinori KONNO
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.119-126
    • /
    • 2024
  • After increasing to 84 trillion yen in FY1992 following the burst of Japan's economic bubble, construction investment in Japan fell to 42 trillion yen in FY2010 in the wake of the global financial crisis. It subsequently recovered to 67 trillion yen in FY2022, driven largely by demand for reconstruction after the Great East Japan Earthquake and Abenomics. On the other hand, the sustainability of Japanese construction is under threat due to a declining population and a decrease in the number of construction workers. A breakdown in sustainability is not only detrimental to the population, but also leads to delays in disaster recovery for Japan, which is a disaster-prone country. It is therefore necessary to analyze the status and trends in building construction in recent years to clarify the future sustainability of building construction in Japan. This study reviews basic information on buildings constructed in recent decades using raw data from the Statistical Survey of Building Starts, a statistical survey undertaken by the Japanese government, and analyzes statistical data such as number of buildings, location, building type, total floor area, construction cost, and construction duration. Finally, the sustainability of building construction in Japan is discussed.

A Case Study of Information System Auditing of CBD Project (CBD프로젝트의 정보시스템감리 사례연구)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

Korean Nominal Bank, Using Language Resources of Sejong Project (세종계획 언어자원 기반 한국어 명사은행)

  • Kim, Dong-Sung
    • Language and Information
    • /
    • v.17 no.2
    • /
    • pp.67-91
    • /
    • 2013
  • This paper describes Korean Nominal Bank, a project that provides argument structure for instances of the predicative nouns in the Sejong parsed Corpus. We use the language resources of the Sejong project, so that the same set of data is annotated with more and more levels of annotation, since a new type of a language resource building project could bring new information of separate and isolated processing. We have based on the annotation scheme based on the Sejong electronic dictionary, semantically tagged corpus, and syntactically analyzed corpus. Our work also involves the deep linguistic knowledge of syntaxsemantic interface in general. We consider the semantic theories including the Frame Semantics of Fillmore (1976), argument structure of Grimshaw (1990) and argument alternation of Levin (1993), and Levin and Rappaport Hovav (2005). Various syntactic theories should be needed in explaining various sentence types, including empty categories, raising, left (or right dislocation). We also need an explanation on the idiosyncratic lexical feature, such as collocation and etc.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

DEVELOPMENT OF FEASIBILITY ANALYSIS MODEL FOR DEVELOPER-REQUESTED HOUSING PROJECTS

  • Young-Ki Huh;Bon-Gang Hwang;Joong-Seok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.847-855
    • /
    • 2009
  • While many studies on feasibility analysis for housing projects have been released, the main focus was on economic feasibility and factors related to developers were not clearly identified enough to be used in practice. In order to establish a feasibility analysis model for apartment development projects requested by developers in Korea, 31 driving factors behind projects' success were identified under seven different categories. Criterions of the each factor were also developed, and weight of each factor was assigned by applying the Analytical Hierarchy Process(AHP). Finally, based on the Monte Carlo simulation, the feasibility analysis model was established, providing probability distribution of project's grade. The model was applied to 12 housing projects to verify its reliability, and found that the model properly filtered projects that are unlikely to be profitable, indicating reasonable reliability of the model. The model can be a useful tool for contractors, especially with less experience in analyzing project development feasibility.

  • PDF

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.