• Title/Summary/Keyword: Building Project

Search Result 2,556, Processing Time 0.027 seconds

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

Analysis on the Construction Cost of Steel Truss Stadium (철골 트러스 스타디움 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.75-82
    • /
    • 2007
  • Building costs means capital costs which include cost of land, cost of acquiring and preparing the site, construction costs, engineering fees, furnishings, cost of financing the project, and cost of management required to run and maintenance the building for use. An economic analysis is one of the most important factor to determine the project feasibility. The purpose of the this study is to analysis on the construction cost structure of steel truss stadium.

  • PDF

Implementation scheme for the efficient building of Distribution Facilities Information Management and Operation using GIS (GIS기술을 이용한 배전설비관리 및 운영의 효율적인 추진방안)

  • Kwon, O-Hyung;Moon, Soo-Deog;Kim, Jeong-Gu
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1131-1133
    • /
    • 1998
  • Distribution facilities are installed dispersedly nationwide and in view of huge amounts. it makes it difficult to manage and update distribution facilities information manually. Consequently, much efforts have been exerted on computerization of distribution facilities information. KEPCO has been building distribution facilities information system using GIS technology(DGIS) to manage distribution facilities. In order to implement DGIS, digitizing the existing cartographical and land registration map is essential. In this regard, the Government is pursuing the NGIS project. In parrallel with it, DGIS project will be accelerated in the future. This paper suggests the efficient development plans to computerize distribution facilities using GIS technology.

  • PDF

Quantifying the Value of Floats (작업여유시간의 가치 정량화 방법론)

  • Park, Young-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.123-124
    • /
    • 2015
  • The project participants make use of floats for their benefits. The owner may consume floats in an event of issuing change order(s) and may avoid the risk factors attributed by them; the contractor may reduce activities' costs by substituting the activity with alternative construction method and by leveling the resources, hence consuming floats. There are a lot of disputes and claims involved in the float ownership issue. The ownership of floats should be stipulated in the contract stage. To alleviate these disputes and claims, it is commendable to develop a computational method that quantifies the float value. This paper presents the method that computes the values of total floats which changes over the project life span. The system calculates CPM, compute the ratio of area of banana curve which is enclosed by earliest start curve and latest start-curve.

  • PDF

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

The Perception Research on the Career Development of the Non-Certified Qualification Acquisitors of National Construction Management (국내 건설사업관리(CM) 민간자격 인증자들의 경력개발에 대한 인식조사)

  • Yu, Hoe-Chan;Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF