INTEROPERABILITY ISSUES IN CROSS-DISCIPLINARY COLLABORATIONS OF IRREGULARLY SHAPED BUILDINGS: THE CASE OF DONGDAEMUN DESIGN PLAZA AND PARK

  • Ohyoon Kwon;Ghang Lee;Seonwoo Kim;Yunah Sin;Jeashik Hwang;Kabsu Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.331-337
    • /
    • 2009
  • This paper summarizes some of approaches that could be taken for data exchange in a non-interoperable work environment and reports lessons learned from the Dongdaemun Design Plaza and Park project. Today's widespread application of building information modeling (BIM) to the construction and architectural design industries requires a change in the cooperation between business organizations and their methods of communication. In particular, the interoperability of information between interdisciplinary organizations, which use specific programs for different purposes, has become a critical issue. More than just a technical problem, it is also highly related to an organization's collaboration culture and the particulars of a specific project. This paper describes the interoperability issue that occurred during the construction documentation phase of the irregularly shaped building project, Dongdaemun Design Plaza and Park, designed by Zaha Hadid Architects and Samoo Architects and Engineers, from the perspective of the technological problem and the collaborative organizations' communications. Although the perfect compatibility of information is not possible, this paper deals with a practical approach to the interoperability issue by examining the way the end-users of computer-aided design (CAD) resolved the interoperability problems in practice.

  • PDF

Analysis of Crime Prevention Environment Design Elements in Old Building Districts -Focused on the Daegu Metropolitan City Safety Village Project- (노후건축지구의 범죄예방환경디자인 요소 분석 - 대구광역시 안전마을만들기사업 중심으로 -)

  • Kang, Kyung-Ha;Son, Byeung-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.301-302
    • /
    • 2021
  • Recently, there has been a large social issue about the environmental sector for safe zones from crime. Since 2010, starting with Seoul, most local governments have enacted ordinances related to crime prevention environmental design (hereinafter referred to as CPTED) and are showing active movement. In this study, as part of a method to understand how to use the design elements applied to CPTED, the safety village creation project of deteriorated construction districts in Daegu Metropolitan City was conducted, focusing on the 10 project destinations using CPTED, and the CPTED application elements were evaluated by CPTED. The analysis was conducted according to the basic principles, and the elements related to the architectural plan of the environmental design elements were reviewed. In order to extract the environmental design elements of the project site, the CPTED guideline appropriate for the sector was used based on the standard guidelines for environmental design for crime prevention in Daegu City and the contents of the crime prevention urban design ordinance.

  • PDF

Working Posture Analysis Using OWAS method of Core Wall Construction in High-rise Building (OWAS기법을 활용한 초고층 코어월 공사의 근로자 작업자세 분석)

  • Lee, Junehyuck;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.72-73
    • /
    • 2016
  • Working Posture is an important factor directly connected with quality and productivity of the construction project. In particular, High-rise building construction is required to manage the working posture due to the repetitive task and unfavorable working condition such as high place work, limited space. However existing construction planning of high-rise building construction has a negative effect on the labor's productivity because it is not insufficiently considered for working posture. Therefore the purpose of this study is to suggest a work that needs improvement by analyzing labor's working posture quantitatively using OWAS method. These results would provide the basic information to improve the productivity of the construction project by supporting the construction plan considering the working posture in high-rise building.

  • PDF

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

BIM based Construction Progress Monitoring System Integrated with IOT (사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템)

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

ENERGY EFFICIENT BUILDING DESIGN THROUGH DATA MINING APPROACH

  • Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.601-605
    • /
    • 2009
  • The objective of this research is to develop a knowledge discovery framework which can help project teams discover useful patterns to improve energy efficient building design. This paper utilizes the technology of data mining to automatically extract concepts, interrelationships and patterns of interest from a large dataset. By applying data mining technology to the analysis of energy efficient building designs one can identify valid, useful, and previously unknown patterns of energy simulation modeling.

  • PDF

BIM-DRIVEN ENERGY ANALYSIS FOR ZERO NET ENERGY TEST HOME (ZNETH)

  • Yong K. Cho;Thaddaeus A. Bode;Sultan Alaskar
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.276-284
    • /
    • 2009
  • As an on-going research project, Zero Net Energy Test Home (ZNETH) project investigates effective approaches to achieve whole-house environmental and energy goals. The main research objectives are (1) to identify energy saving solutions for designs, materials, and construction methods for the ZNETH house and (2) to verify whether ZNETH house can produce more energy than the house uses by utilizing Building Information Modeling (BIM) and energy analysis tools. The initial project analysis is conducted using building information modeling (BIM) and energy analysis tools. The BIM-driven research approach incorporates architectural and construction engineering methods for improving whole-building performance while minimizing increases in overall building cost. This paper discusses about advantages/disadvantages of using BIM integrated energy analysis, related interoperability issues between BIM software and energy analysis software, and results of energy analysis for ZNETH. Although this investigation is in its early stage, several dramatic outcomes have already been observed. Utilizing BIM for energy analysis is an obvious benefit because of the ease by which the 3D model is transferred, and the speed that an energy model can be analyzed and interpreted to improve design. The research will continue to use the ZNETH project as a testing bed for the integration of sustainable design into the BIM process.

  • PDF

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.