• Title/Summary/Keyword: Building Production

Search Result 1,150, Processing Time 0.062 seconds

Parametric Design Modeling Method for PC Production Simulation Using BIM (PC 생산 시뮬레이션 모델과 BIM 모델 간의 효율적 건물 부재 정보 교환을 위한 파라메트릭 디자인 모델링 기법)

  • Lee, WonSeok;Jeong, WoonSeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.157-158
    • /
    • 2021
  • Recently, there have been a growing number of cases using precast concrete construction methods to efficiently carry out construction projects. In order to efficiently carry out PC construction, it is necessary to establish a production plan of PC components that effectively reflect various design alternatives during the initial design stage. Because the production plan of PC components is based on productivity of PC members, the use of PC production simulations that can effectively predict productivity for design alternatives is necessary. Therefore, this paper propose a method to efficiently generate design alternatives which is necessary to perform to production simulations using parametric modeling techniques and BIM.

  • PDF

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

A Basic Study of Production System Development of Free-form Concrete Panels (비정형 콘크리트 패널 생산 시스템 구축 기초연구)

  • Son, Seung-Hyun;Kim, Ki-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.70-71
    • /
    • 2019
  • Glass fiber reinforced concrete (GFRC) is very suitable as a material for free-form concrete panels (FCPs) because of its lightweight, strong, moldable, durable and sustainable properties. GFRC is superior in construction and maintenance compared with materials such as steel, aluminium, titanium, glass and plastic, and is advantageous in cost. However, GFRC is being produced by skilled craftsmen, and still lacks the technology to economically produce high quality FCPs. Currently, there is a technology to automatically and accurately produce FCPs. However, the developed technology can not be applied to the field with simple production technology without production line for mass production. To solve this problem, the purpose of this study is a basic study of production system development of free-form concrete panels. This study introduces the developed FCPs production technology and builds FCP production system for mass production. The results of this study will be used as basic data for the commercial production of FCPs in the future.

  • PDF

Benefits of Prepartum Nest-building Behaviour on Parturition and Lactation in Sows - A Review

  • Yun, Jinhyeon;Valros, Anna
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.28 no.11
    • /
    • pp.1519-1524
    • /
    • 2015
  • It is well known that prepartum sows have an innate motivation to build a nest before parturition. Under commercial conditions, however, the farrowing crate, which is widely used in modern pig husbandry, inhibits this innate behaviour through the lack of space, materials, or both. Thus, restriction of nest-building behaviour could generate increased stress, resulting in a decrease in maternal endogenous hormones. Hence, it could lead to detrimental effects on farrowing and lactating performance. Here we review interactions between prepartum nest-building behaviour, stress and maternal endogenous hormone levels, and discuss their effects on parturition, lactation, and welfare of sows and offspring.

A Base Study on In-situ Production Layout of Free-form Concrete panels by System Dynamic (동적 분석기법을 이용한 비정형 콘크리트 패널의 현장생산 배치 기초연구)

  • Lim, Jeeyoung;Lee, Taick-Oun;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.154-155
    • /
    • 2016
  • Although there is an increase in demand for free-form buildings, there are several problems such as increased cost and duration and decreased constructability arising from difficult member production and installation. To solve these problems, a technology to produce free-form panels using CNC machine was developed. According to the technology, the information on free-form buildings designed is delivered to the CNC machine, a form is shaped using the delivered information and free-form concrete panels are produced using the form. The limited construction site, duration and project cost as well as interferences with other work types should be considered upon in-situ production of free-form concrete panels. Thus, the purpose of this study is to conduct a base study on in-situ production layout of free-form concrete panels by system dynamics. With this study, we will discover the causal relationship of influence factors on in-situ production of free-form concrete panels, and improved productivity is expected through the production layout.

  • PDF

A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel (비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구)

  • Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF

Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model (초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션)

  • Roh, Myung-Il;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.6
    • /
    • pp.470-476
    • /
    • 2011
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1112-1118
    • /
    • 2009
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

  • PDF