• 제목/요약/키워드: Building Integrated design

Search Result 471, Processing Time 0.031 seconds

A Novel Design of the Distributed Fire Alarm Control System by Developing Intelligent Control Modules with LonTalk Protocol (지능형제어기를 이용한 분산 방계시스템에 관한 연구)

  • 홍원표;이승학
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2001.11a
    • /
    • pp.157-162
    • /
    • 2001
  • There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires communication standard and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the distributed fire alarm signaling system and a new intelligent control modules with LonTalk protocol. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation systems. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate Integrated building systems.

  • PDF

Automation of Architectural Design Process and Robotic System in Building Construction using Object-Oriented Design

  • Choo, Seung-Yeon;Park, Sang-Min
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.12
    • /
    • pp.1787-1795
    • /
    • 2009
  • This paper describes an automation of architectural design processes and the direction between this automation and robotic system in building construction using the concept of the object-oriented design in architecture. The research starts from the premise that many computer-aided design systems are mostly aimed at serving as drawing tools which are used only after a design formal solution has already been established by the architect. If the computer is well applied to the architectural design process, many positive things such as standardization of design detail, increasing productivity and collaboration, minimizing construction costs etc. can be done. To support an early design solution in the computer-based environment, the proposed automation was developed and tested in a real building project, using the object-oriented design concept such as product model. This design automation gives various design alternatives from the early design phase to the final stage of design details, according to musical harmony. This paper shows how architectural design process can be automated and how the data of the applied architectural design can be integrated into product model environment, in relation to robotic system in building construction.

  • PDF

Installation and Operating with Photovoltaic System of Sunshade Type (차양형 태양광발전시스템의 설치 및 운영에 관한 연구)

  • Lee, So-Mi;Shim, Hun;Lee, Yong-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.136-141
    • /
    • 2005
  • The application of photovoltaics into building as integrated building components has been paid more attention worldwide. Photovoltaics or solar electric modules are solid state devices, directly converting solar radiation into electricity; the process does not require fuel and any moving parts, and produce no pollutants. So, the purpose of this research is to present how to get PVIB which can be applied building facade and how to apply it. From the basis of these results this study will intend to develop an integrated for optimal design of PV System.

  • PDF

Demonstration Study of 10kW Poly Metal Panel integrated PV Module (10kW급 지붕재용 태양전지모듈 실증연구)

  • Yi, So-Mi;Noh, Ji-Hee;Joo, Man-Sic
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.246-249
    • /
    • 2007
  • The application of photovoltaics into building as integrated building components has been paid more attention worldwide. Photovoltaics or solar electric modules are sol id state devices, directly converting solar radiation into electricity; the process does not require fuel and any moving parts, and produce no pollutants. And the prefab building method is very effective because the pre- manufactured building components is simply assembled to making up buildings in the construction fields especially the sandwich panel. So, this paper describes a design and performance test of the 10kW poly metal pv module(pmpp) system. It is concluded that the prediction of BIPV system's performance should be based on the more accurate PV module installation.

  • PDF

Development of Integrated Simulator for Intelligent Building Control Systems (인텔리젼트 빌딩 제어 시스템의 통합 시뮬레이터 개발)

  • Bae, Joong-Won;Lim, Dong-Jin;Hong, Seung-Ho;Song, Kyoo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1199-1201
    • /
    • 1996
  • To Provide pleasant building environment and the ease of maintenance and facility management, many new office buildings are being built as intelligent buildings. Building control systems which are employed in intelligent buildings require advanced types of controllers and varieties of control schemes. Designing and installation of these types of advanced building control systems take a lot of effort and also they are costly. In order to design these systems, it is necessary for the designers to have means to analyze and estimate the performance of control systems. In this paper, the results of the simulator for HVAC and elevator system are presented as the first stage of the development of the integrated simulator. For the development of simulator, ARENA which is the general-purpose software tool for the simulation with reinforced GUI is used.

  • PDF

The Development of Performance Evaluation Program of Building Integrated Photovoltaic System (건물일체형 태양광발전 시스템 성능평가 프로그램 개발)

  • Kim, Beob-Jeon;Park, Jae-Wan;Yoon, Jong-Ho;Shin, U-Cheul
    • KIEAE Journal
    • /
    • v.15 no.4
    • /
    • pp.85-90
    • /
    • 2015
  • Purpose: In design and planning Building Integrated Photovoltaic(BIPV) system can reduce cost by replacing building facade as construction material such as roofs, outer walls and windows as well as generating electricity. BIPV system should be applied at the early stage of architectural design. However, it is hard to decide whether using BIPV system or not for architects and builders who are not professional at BIPV system because performance of system is considerably influenced by types of module, installation position, installation methods and so on. It is also hard for experts because commercialized analytical program of photovoltaic systems is too complicated to use and domestic meteorological data is limited to partial areas. Therefore, we need evaluation program of BIPV system which can easily but accurately interpret generating performance and evaluate validity of BIPV system at the early stage of architectural design even for inexpert. Method: In this study, we collected meteorological data of domestic major region and analyzed generation characteristic of BIPV system by using PVsyst(commercialized software) in accordance with regions, types of solar module, place and methods of installation and so on. Based on this data, we developed performance evaluation program of BIPV system named BIPV-Pro, through multiple regression analysis and evaluated its validity. Result: When comparing predictive value of annual average PR and annual electricity production of BIPV-Pro an that of PVsyst, each of root mean square error was 0.01897 and 123.9.

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

Knowledge Support and Automation of Paneled Building Envelopes for Complex Buildings using Script Programming

  • Park, Jungdae;Im, Jinkyu
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.85-90
    • /
    • 2015
  • Advances in the technology of computational design are giving architects and engineers the opportunity to analyze buildings with complex geometries. This study explores the optimization and automation process using the parametric design method, and uses digital tools to achieve surface representation and panelization for curved shaped office buildings. In this paper, we propose parametric algorithms of dimensional and geometric constraints using the Knowledge-ware scripts embedded in Gehry Technologies' Digital Project. The knowledge-based design methods proposed in this study can be used to systemize the knowledge possessed by experts in the form of data. Such knowledge is required to promote collaboration between designers and engineers in the process of CAD/CAE/CAM. The aim of this study is to integrate the process into design, which establishes an integrated process. This integration enables two-way feedback between design and construction data by combining the methods used in designing, engineering, and construction.

Fabrication of Lightweight Flexible c-Si Shingled Photovoltaic Modules for Building-Applied Photovoltaics (건물 부착형 고경량 유연성 슁글드 태양광 모듈)

  • Minseob, Kim;Min-Joon, Park;Jinho, Shin;Eunbi, Lee;Chaehwan, Jeong
    • Current Photovoltaic Research
    • /
    • v.10 no.4
    • /
    • pp.107-110
    • /
    • 2022
  • Lightweight and flexible photovoltaic (PV) modules are attractive for building-integrated photovoltaic (BIPV) applications because of their easy construction and applicability. In this study, we fabricated lightweight and flexible c-Si PV modules using ethylene tetrafluoroethylene (ETFE) front cover and shingled design string cells. The ETFE front cover instead of glass made the PV modules lighter in weight, and the shingled design string cells increased the flexibility. Finally, we fabricated a PV module with a conversion power of 240.08 W at an area of 1.25 m2 and weighed only 2 kg/m2. Moreover, to check the PV module's flexibility, we conducted a bending test. The difference of conversion power between the modules before and after bending shown was only 1.7 W, which showed a power reduction rate of about 0.7%.

The Experimental Study on the Application of the Insulated Glass PV Module in the Curtain Wall (단열 복층유리 PV의 커튼 월 적용 가능성에 관한 실험적 연구)

  • Oh, Min-Seok;Kim, Hway-Suh
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.3
    • /
    • pp.63-69
    • /
    • 2006
  • In order to positively cope with the international environmental regulations like UNFCCC (UN Framework Convention on Climate Change) and to overcome energy crisis Korea, who depends on import for more than 97% of required energy, needs to continuously proceed to development, spread and expansion of alternativeenergy and then, to cultivate the capacity to keep the balance of demand and supply of energy by itself. In this aspect, the technology of BIPV (Building Integrated Photovoltaic) is the field that the world is most interested in. However, at present, this technology is centered on increasing the efficiency of the module itself so it has lots of problems to be applied to buildings. Application of the integrated PV system in building external curtain wall can obtain much more generation of electric power than in roof-types whose area for installation is restricted, so it is excellent in terms of its possibility of application. Therefore, this paper intends to advance its practical use by proposing how to get integrated PV system which can be applied to building external curtain wall, and how to apply it.