Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.3
/
pp.421-435
/
2017
Recently, due to the saturation of ground structures and the overpopulation of pipeline facilities requires to development of underground structures as an alternative to ground structures. Thus, mechanized tunnel construction of the shield TBM method has been increasing in order to prevent vibration and noise problems in construction of the NATM tunnel for the urban infrastructure construction. Tunnel construction plan for the tunnel line should be formed in a sharp curve to avoid building foundation and underground structures and it is inevitable to develop a shield TBM technology that suits the sharp curve tunnel construction. Therefore, this study is about the structural stability technology of the articulation jack, shield jack and skin plate for the shield TBM thrust in case of the mechanized tunnel construction that is a straight and sharp curve line. The construction case study and shield TBM operation principle are examined and analyzed by the theoretical approach. The torque of the cutter head, the thrust of the articulation jack and the shield jack, the amount of over cutting for curve is important respectively in shield TBM construction of straight and sharp curve line. In addition, it is very important to secure the stability of the skin plate structure to ensure the safety of the inside worker. This study examines the general structure and construction of the equipment, experimental simulation was carried out through numerical analysis to examine the main factors and structural stability of the skin plate structure. The structural stability of the skin plate was evaluated and optimizes the shape by comparing the loads of the articulation jack by selecting the virtual soil to be applied in a straight and sharp curve line construction. Since the present structure and operation method of the shield TBM type in domestic constructions are very similar, this study will help to develop the localized shield TBM technology for the new equipment and the vulnerability and stability review.
Kim, Eung-Cheol;Kwon, Young-In;Yun, Seong-Soon;Kang, Jin-Goo
Journal of Korean Society of Transportation
/
v.23
no.5
s.83
/
pp.47-55
/
2005
Roads deeply affect the life of people and keep doing an important role to support economic growth of a country. According to the budget plan of the ministry of construction and transportation of Korea, 8.1 trillion won have been allotted for road investment in the year of 2002 which occupy 61% of the transportation infrastructure special account (13.3 trillion won) and 4.7% of the total national budget (1,740 trillion won). It is true that services generated from road investment such as mobility enhancement and increased accessibility have shown positive effects through shortened travel time and decreased vehicle operating cost. However, it is also notable that many negative effects are gradually being discussed and those are nowadays getting severer due to enhanced people interests about road construction, increased concerns on environment and active public involvement that were evoked by traffic accidents, air pollution & noise and destruction of environment. Road construction processes in Korea are normally governed by administrative sectors (suppliers) not by users. These processes ate very weak to accomodate user s needs and community concerns thus easy to fail finalizing a road project without hassles. A public hearing process is supposed to be held in the processes of detailed design step and the environmental impact analysis. However, it is not enough to grab user's needs and community concerns. Increased public involvement frequencies, optimized public involvement timing and enhanced depth of public involvement magnitude are suggested to improve the current poor public involvement schemes in road planning and design processes. The application of these recommended methods to the road planning and design processes may guarantee the change from the current supplier-oriented schemes to the new user-oriented one. Also, this study suggests to reset objectivity and clarity of road construction process, to make conciliation guidelines based on many practical cases that produced good results, to introduce public involvement techniques in a stepwise basis, and to foster the professionals via education and training programs.
This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.
Kim, Nahui;Moon, Jooyeon;Song, Cholho;Heo, Seongbong;Son, Yowhan;Lee, Woo-Kyun
Journal of Korean Society of Forest Science
/
v.107
no.1
/
pp.96-107
/
2018
This study analyzed the linkage between the Forestry sector Official Development Assistance (ODA) Project in South Korea and the Sustainable Development Goals (SDGs) of United Nations (UN), Suggested direction of ODA project focusing on the implementation of the SDGs. Forestry sector ODA project data in South Korea have collected from Economic Development Cooperation Fund (EDCF) statistical inquiry system developed by The Export-Import Bank of Korea. According to the analysis result, Forestry sector ODA project in South Korea have been actively implemented in the fields of forestry development, forestry policy and administration. In both fields, Korea Forest Service and Korea International Cooperation Agency (KOICA) carried out the most projects. The Forestry sector ODA project data in South Korea are classified technical development, capacity building, construction of infrastructure and afforestation based on their objectives and contents. SDGs emphasizes the importance of national implementation assessment and this study analyze linkage between ODA activity content in each classification item and 2016 Korea Forest Service Performance Management Plan indicator. Analyzed the 2016 Korea Forest Service Performance Management Plan indicator and SDGs target and SDGs indicator were identified. finally, SDGs goals were recognized. In conclusion, Forestry sector ODA project in South Korea are associated with the SDGs Goal 1 (No Poverty), Goal 2 (Zero Hunger), Goal 6 (Clean Water and Sanitation), Goal 13 (Climate Action), Goal 15 (Life on Land) and Goal 17 (Partnership for The Goals). Therefore, With the launch of the SDGs, This study analyzed the linkage among the Forestry sector ODA Project in South Korea, the 2016 Korea Forest Service Performance Management Plan and the SDGs. it presented the limitations of Forestry sector ODA Project in South Korea and made proposals for the implementation of the SDGs.
Vehicle-to-Grid (V2G) system, bi-direction power trading technology, enables drivers possessing electric vehicle to sell the spare electricity charged in the vehicle to power distribution company. The drivers gain profit by charging electricity in the day time of high electricity rate. In this regard, the government is preparing the policies of building and supporting V2G infrastructure and demanding the potential consumers' preference for the V2G system. This paper attempts to analyze the consumers' preference using the data from obtained a survey of randomly selected 1,000 individuals. To this end, choice experiment, an economic technique, is employed here. The attributes considered in the study are residual amount of electricity, electricity trading hours, required plug-in time, and price measured as an amount additional to current gasoline vehicle price. The multinomial logit model, which requires the assumption of 'independence of irrelevant alternatives', is applied but the assumption could not be satisfied in our data. Thus, we finally utilized nested logit model which does not require the assumption. All the parameter estimates in the utility function are statistically significant at the 10% level. The estimation results show that the marginal willingness to pay (MWTP) for one hour increase in electricity trading hours is estimated to be KRW 1,601,057. On the other hand, a one percent reduction in residual amount of electricity and one hour reduction in required plug-in time in V2G system are computed to be KRW -91,911 and -470,619, respectively. The findings can provide policy makers with useful information for decision-making about introducing and managing V2G system.
Korean Journal of Agricultural and Forest Meteorology
/
v.12
no.4
/
pp.241-263
/
2010
KoFlux is a Korean network of micrometeorological tower sites that use eddy covariance methods to monitor the cycles of energy, water, and carbon dioxide between the atmosphere and the key terrestrial ecosystems in Korea. KoFlux embraces the mission of AsiaFlux, i.e. to bring Asia's key ecosystems under observation to ensure quality and sustainability of life on earth. The main purposes of KoFlux are to provide (1) an infrastructure to monitor, compile, archive and distribute data for the science community and (2) a forum and short courses for the application and distribution of knowledge and data between scientists including practitioners. The KoFlux community pursues the vision of AsiaFlux, i.e., "thinking community, learning frontiers" by creating information and knowledge of ecosystem science on carbon, water and energy exchanges in key terrestrial ecosystems in Asia, by promoting multidisciplinary cooperations and integration of scientific researches and practices, and by providing the local communities with sustainable ecosystem services. Currently, KoFlux has seven sites in key terrestrial ecosystems (i.e., five sites in Korea and two sites in the Arctic and Antarctic). KoFlux has systemized a standardized data processing based on scrutiny of the data observed from these ecosystems and synthesized the processed data for constructing database for further uses with open access. Through publications, workshops, and training courses on a regular basis, KoFlux has provided an agora for building networks, exchanging information among flux measurement and modelling experts, and educating scientists in flux measurement and data analysis. Despite such persistent initiatives, the collaborative networking is still limited within the KoFlux community. In order to break the walls between different disciplines and boost up partnership and ownership of the network, KoFlux will be housed in the National Center for Agro-Meteorology (NCAM) at Seoul National University in 2011 and provide several core services of NCAM. Such concerted efforts will facilitate the augmentation of the current monitoring network, the education of the next-generation scientists, and the provision of sustainable ecosystem services to our society.
Journal of agricultural medicine and community health
/
v.34
no.2
/
pp.155-167
/
2009
Objectives: The purpose of this study was to investigate healthy city project related characteristics to members of the Korea Healthy Cities Partnership(KHCP). Methods: This study analyzed general characteristics of healthy city, characteristics of healthy city(political support, collaboration & citizen participation, healthy city project, infrastructure development, capacity building), self-evaluation of healthy city and etc by self-questionnaires from February to December, 2007, which were distributed to government workers who were in charged in health city project of 23 membership cities of KHCP. Results: The number of urban city was 11(47.8%) and that of rural municipality was 12(52.5%). Public health center was almost in charge of healthy city project(73.9%). As for the characteristics of healthy city, healthy city municipal budget(91.3%), city health profile(91.3%), technical support of cooperative university(82.6%), healthy city regulation(78.3%), citizen participation(78.3%), committee(73.9%), setting approach(69.9%) and healthy city network(69.6%) were good. But intersectoral collaboration(34.8%), long-term healthy city plan(39.1%), administrative policy or campaign promise(43.5%), programs to the vulnerable population(47.8%), department in charge(47.8%) and seminar(47.8%) were not good. Especially, characteristics of healthy city according to the existence of department in charge were significantly different in intersectoral collaboration, citizen participation, setting approach and healthy city network. Conclusions: In spite of rapid expansion in healthy cities, there were great difficulty in political support, collaboration, department in charge and programs of health equity. So we need to go a long way to achieve the vision of healthy cites by its principles and characteristics.
Korean Journal of Construction Engineering and Management
/
v.10
no.5
/
pp.37-46
/
2009
This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIFS), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1 cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.
Korea has achieved significant economic growth with building the Gyeongbu Expressway. As the number of new road construction projects has decreased, it becomes more important to maintain optimal status of the current road networks. One of the best ways to accomplish it is weight enforcement as active control measure of traffic load. This study is to develop High-speed Weigh-in-motion System in order to enhance efficiency of weight enforcement, and to analyze patterns of overloaded trucks on highways through the system. Furthermore, it is to review possibilities of developing overweight control system with application of the HS-WIM system. The HS-WIM system developed by this study consists of two sets of an axle load sensor, a loop sensor and a wandering sensor on each lane. A wandering sensor detects whether a travelling vehicle is off the lane or not with the function of checking the location of tire imprint. The sensor of the WIM system has better function of classifying types of vehicles than other existing systems by detecting wheel distance and tire type such as single or dual tire. As a result, its measurement errors regarding 12 types of vehicle classification are very low, which is an advantage of the sensor. The verification tests of the system under all conditions showed that the mean measurement errors of axle weight and gross axle weight were within 15 percent and 7 percent respectively. According to the WIM rate standard of the COST-323, the WIM system of this study is ranked at B(10). It means the system is appropriate for the purpose of design, maintenance and valuation of road infrastructure. The WIM system in testing a 5-axle cargo truck, the most frequently overloaded vehicle among 12 types of vehicles, is ranked at A(5) which means the system is available to control overloaded vehicles. In this case, the measurement errors of axle load and gross axle load were within 8 percent and 5 percent respectively. Weight analysis of all types of vehicles on highways showed that the most frequently overloaded vehicles were type 5, 6, 7 and 12 among 12 vehicle types. As a result, it is necessary to use more effective overweight enforcement system for vehicles which are seriously overloaded due to their lift axles. Traffic volume data depending upon vehicle types is basic information for road design and construction, maintenance, analysis of traffic flow, road policies as well as research.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.