• Title/Summary/Keyword: Building Facility

Search Result 1,260, Processing Time 0.03 seconds

A Study on the Building Codes in relation with Campus Facility Planning (대학시설계획(大學施設計劃)에 있어서 건축관련법(建築關聯法)의 적용(適用)에 관한 연구(硏究))

  • Lee, Keun-Wook
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.2 no.1
    • /
    • pp.27-41
    • /
    • 1995
  • This study deals zoning and building codes that act on the physical planning and design of university campus in Korea. Campus facility related laws were analyzed in relation to various factor found out through the survey on the existing campuses in rural or urban area. The study shows that the gaps between the standards required by the law and the state of facilitation in many universities could be filled by applying varied norms in accordance with the locational characteristics of each university.

  • PDF

A study on the application and construction of a rainwater storage tank in apartment complex (공동주택단지에서의 빗물저수조 설치 및 활용방안 연구)

  • Lee, Won-Yeul;Jeong, Sang-Min;Shin, Duck;Lee, Chuel-Hun;Han, Moo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.165-171
    • /
    • 2005
  • Nowadays, a source of all water, which has been spent by a lot of people, is the rainwater The rainwater is directly relating human being' life. According to how to use rainwater. human being' life is abundant or poor. Due to the lack of underground filtration quantity, the water circulation of the city is discontinued and the underground ecosystem is destroyed. This study suggest that the unused underground space of building and temporary structure can be used into rainwater storage tank in the facility to use rainwater. Moreover, in this study, while the building is constructed, It is showed that the water used in construction can be replaced in the rainwater.

Analysis of Field Condition for Proper Waterproofing Materials applied to Green Roof System for Depot (도시철도 차량기지의 기반녹화에 적합한 방수시스템 선정을 위한 환경 조건 분석)

  • Min, Kwang-Man;Kwon, Shi-Won;Choi, Sung-Min;Kwak, Kyu-Sung;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.127-131
    • /
    • 2006
  • Depot have a lagged behind structure in the side of building up the view. With this reason, people have been recognized depot as hatred facility causes to have car noise, air pollution. In the other hand, depot become a underground and complex facility as a higher-value added building, and moreover, it need to understand the environment that depot structure have a specific field condition to apply green roof system. 1) Analysis proper waterproofing material and root barrier apply to depot need root penetrating test method 2) Suggest root barrier and waterproofing material relate to maintain and construction for green roof system 3) Construction condition for depot have crack movement of structure by vehicle vibration and root penetrating force by plant growth

  • PDF

A Study on Architectural Design of Elementary School Using Building Information Modeling(BIM) (Building Information Modeling(BIM)을 적용한 초등학교 설계에 관한 연구)

  • Cho, Jae-Keun;Jun, Han-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.3
    • /
    • pp.5-16
    • /
    • 2007
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. To do so, we model Sanggye elementary school project using BIM, and consider other efficient methods for the lack of the information caused by the traditional blueprint. In addition, we try to lay the groundwork for expanding the application of BIM during the life cycle of an educational facility through researching a system to set up an accurate building information.

Design and Implementation of Building Control System based 3D Modeling (3D 모델링 기반 빌딩관제시스템의 설계 및 구현)

  • Moon, Sang Ho;Kim, Byeong Mok;Lee, Gye Eun
    • Journal of Korea Multimedia Society
    • /
    • v.23 no.5
    • /
    • pp.673-682
    • /
    • 2020
  • Buildings are becoming more and more high-rise and large-scale in recent years, so in the event of a disaster such as a fire, enormous human and economic damage is expected. Therefore, management, security, and fire control are essential for large buildings in the city. Because these large buildings are very complex outside and inside, they need a three-dimensional control based on 3D modeling rather than a simple flat-oriented control. To do this, this paper designed and implemented a building control system based on 3D modeling. Specifically, we designed a 3D building / facility editing module for 3D modeling of buildings, a 3D based control module for building control, and a linkage module that connects information such as firefighting equipment, electrical equipment and IoT equipment. Based on this design, a building control system based on 3D modeling was implemented.

Knowledge Reorganization Method of Temporary Facility Planning for High-rise Building Constructions (고층건축공사를 위한 가설계획 지식의 체계화 방법)

  • Kim Wan-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.411-414
    • /
    • 2002
  • As high density of cities, construction project is getting to be high rise, large sized and multi purposed, whereas it has some difficulties due to disordering of classification and undeveloped management systems. In this study, it would be suggested that classification method for knowledge and constraint of temporary facility in order to efficient decision making of temporary facility planning with knowledge reorganization and establishment process.

  • PDF

Detailed Analysis of the KAERI nTOF Facility

  • Kim, Jong Woon;Lee, Young-Ouk
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.2
    • /
    • pp.141-147
    • /
    • 2016
  • Background: A project for building a neutron time-of-flight (nTOF) facility is progressing. We expect that the construction will start in early 2016. Before that, a detailed simulation based on the current architectural drawings was performed to optimize the performance of our facility. Materials and Methods: Currently, several parts had been modified or changed from the original design to reflect requirements such as the layout of the electron beam line, shape of the vacuum chamber producing a neutron beam, and the underground layout of the nTOF facility. Detailed analysis for these modifications has been done with MCNP simulation. Results and Discussion: An overview of our photo-neutron source and KAERI nTOF facility were introduced. The numerical simulations for heat deposition, source term, and radiation shielding of KAERI nTOF facility were performed and the results are discussed. Conclusion: We are expecting that the construction of the KAERI nTOF facility will start in early 2016, and these results will be used as basic data.

Analysis of Modeling Errors for BIM-based Facility Management Systems (BIM기반 시설물유지관리시스템을 위한 모델링 오류 분석)

  • An, Hyokyung;Lee, Seulki;Yu, Jungho;Son, Bosik;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.35-45
    • /
    • 2013
  • Facility Management is the longest in the building of life cycle. Because it occupies more than 80% of cost, the phase of Facility Management has to be managed and has to be perceived as important as design and construction phase. The method to manage building more efficiently is the introduction of Facility Management System used by CAD and database. But information Requirement is now input by hand in the most Facility Management System. This study aims to analyze the example of applying BIM in the Korea or abroad and the errors of this were deducted by many phase. Lastly, the possible solution is suggested in order to be used in the Facility Management System. This study's benchmarking is COBIE which is developed by the COE(Corps of Engineers) and now popular in the world. The suggestion in this study is the method that I have already mentioned is helpful for a designer to do modeling when a designer uses BIM S/W(software). To be more specific, the method plays a side role in helping data input considering the phase of Facility Management.

An Institutional Improving Standards for Water Reclamation/Reuse(WRR) System Establishment to Buildings (건축물의 중수도 설치기준에 대한 제도적 개선방안)

  • Kong, Young Hyo
    • KIEAE Journal
    • /
    • v.6 no.3
    • /
    • pp.43-48
    • /
    • 2006
  • This paper aims to suggest ways of institutionally improving standards that must be applied when installing Water Reclamation/Reuse (WRR) system based on efficiency analysis. Currently, the standard for WRR system establishment requires that the system should treat more than 10% of used water in the building of over $60,000m^2$ in total area of all floors, but our research has found that it would be more effective to change the standard to $150-m^3-per-day$ reclaimed water or the total area of all floors of $30,000m^2$ ($50,000m^2$ in the case of an office building). In other words, what this paper suggests is not a one-size-fits-all standard based on the total area of all floors, but a reasonable and flexible standard that takes into account efficiency and a unit water usage according to a building's purpose. Furthermore, this paper recommends a new WRR standard that can be applied to large-scale land development for housinglots, like the New Town. The recommendation is based on the economic analysis that the WRR system will ensure efficiency only if the amount of reclaimed water is over 4,000 tons per day, which corresponds to 4 millions square meters of housinglots. Regarding the size of the established facility, this paper suggests changing the standard, which is now set at over 10% of water usage, to what is relative to the total amount of use of reclaimed water in order to ensure efficiency and promote use of reclaimed water. In addition, this paper proposes that governmental support should be offered not only to facility owners, who are recipients at present, but also to facility builders. By doing so, those who donate a facility to the government, central or local, after building it, can be provided with substantial aid. Therefore, the application of the institutional improvement suggested in this paper is expected to create environment-friendly living conditions and boost the quality of life by encouraging people to secure water resources efficiently in buildings, and in a wider range, in cities.

Derivation of System Requirements and Scenario for Smart Bridge Facility Management System Development (스마트 교량 관리시스템 개발을 위한 요구사항 및 활용 시나리오 도출)

  • Hong, Sungchul;Kang, Taewook;Hong, Changhee;Moon, Hyounseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7902-7909
    • /
    • 2015
  • The needs for smart city management technology has been increased for efficiently managing huge and complex social infrastructures. Thus, this research introduces smart bridge facility management system based on sensor and BIM technologies so that the inadequacy of current facility maintenance system and the limitations of data objectivity, consistency and expandability can be improved. For which, current trends on sensor and BIM technologies and standard information system were investigated to derive system develop requirements, and a scenario was suggested to discuss how to utilize the suggested system. Research outcomes are expected to be utilized as a preliminary research for developing the real application framework for bridge facility management.