• 제목/요약/키워드: Building Costs

검색결과 809건 처리시간 0.028초

Sustainable Design and Its Cost: Case Study of Nanning China Resources Tower

  • Lai, Stephen Y.F.
    • 국제초고층학회논문집
    • /
    • 제6권4호
    • /
    • pp.323-326
    • /
    • 2017
  • Sustainability is becoming more and more important in our everyday lives. Thus, it is apparent that more sustainable initiatives are incorporated in a building design concept to reduce operation costs and environmental impacts. However, will the construction cost go up if the building is going green - especially if it is a tall building? This is the question on everyone's mind. In the following paragraphs, we will look into a case study of a skyscraper in Nanning, China. That 411-metre skyscraper, Nanning China Resources Centre East Office Tower, is currently under construction. Designed to LEED-CS Gold standards, the building has adopted a number of sustainable design elements and operation practice, which indeed only accounts for a small percentage of the total construction cost.

Optimization of productivity in the rehabilitation of building linked to BIM

  • Boulkenafet Nabil;Boudjellal Khaled;Bouabaz Mohamed
    • Advances in Computational Design
    • /
    • 제8권2호
    • /
    • pp.179-190
    • /
    • 2023
  • In this paper, building information modelling (BIM) associated to the principle of significant items emerged at quantities and costs in the optimization of productivity related to the rehabilitation of the building where proposed and discussed. A quantitative and qualitative study related to the field of application based on some parameters such as pathology diagnosis, projects documents and bills of quantities were used for model development at the preliminary stage of this work. The study identified 14 quantities significant items specified to cost value based on the use of the 80/20 Pareto rule, through the integration of building information modelling (BIM) in the optimisation of labour productivity for rehabilitation of buildings. The results of this study reveal the reliability and the improvement of labour productivity using building information modelling process integrating quantities and cost significant items.

The Effectiveness of New Power Generation and Energy Demand Reduction to Achieve Greenhouse Gas Reduction Goals in Building Area

  • Park, Seong-Cheol;Kim, Hwan-Yong;Song, Young-Hak
    • Architectural research
    • /
    • 제18권2호
    • /
    • pp.59-64
    • /
    • 2016
  • Since the massive power outages that hit across the nation in September 2011, a growing imbalance between energy supply and demand has led to a severe backup power shortage. To overcome the energy crisis which is annually repeated, a policy change for deriving energy supply from renewable energy sources and a demand reduction strategy has become essential. Buildings account for 18% of total energy consumption and have great potential for energy efficiency improvements; it is an area considered to be a highly effective target for reducing energy demand by improving buildings' energy efficiency. In this regard, retrofitting buildings to promoting environmental conservation and energy reduction through the reuse of existing buildings can be very effective and essential for reducing maintenance costs and increasing economic output through energy savings. In this study, we compared the energy reduction efficiency of national power energy consumption by unit production volume based on thermal power generation, renewable energy power generation, and initial and operating costs for a building retrofit. The unit production was found to be 13,181GWh/trillion won for bituminous coal-fired power generation, and 5,395GWh/trillion won for LNG power generation, implying that LNG power generation seemed to be disadvantageous in terms of unit production compared to bituminous coal-fired power generation, which was attributable to a difference in unit production price. The unit production from green retrofitting increased to 38,121GWh/trillion won due to the reduced energy consumption and benefits of greenhouse gas reduction costs. Renewable energy producing no greenhouse gas emissions during power generation and showed the highest unit production of 75,638GWh/trillion won, about 5.74 times more effective than bituminous coal-fired power generation.

건축물 해체공사비 변동 영향요인 분석 (Analysis of the Factors Influencing the Demolition Costs)

  • 신동욱;조규만;이웅균;김태훈
    • 한국건축시공학회지
    • /
    • 제18권5호
    • /
    • pp.499-506
    • /
    • 2018
  • 급속한 산업화와 도시화를 거치면서 대량으로 건설된 중 고층 건물이 사회적, 구조적으로 노후됨에 따라 해체공사가 대거 증가하고 있다. 그러나 해체공사비 예측을 위한 이론적 접근이나 관련 연구는 미흡한 실정이다. 이러한 배경에서 본 연구는 건축물 해체공사비 변동에 영향을 미치는 중요 요인을 도출하고 분석하고자 하였다. 이를 위해 먼저 문헌고찰과 전문가 그룹의 자문을 바탕으로 14개의 영향요인을 도출하였으며, 설문조사를 실시하여 가설공사, 구조물 해체, 폐기물처리, 전체공정별 중요도를 파악하고 분석하였다. 그 결과, 해체공사비의 변동은 해체현장의 환경적 요인들에 의한 영향이 큰 것으로 분석되었다. 본 연구의 결과는 해체공사 발주단계에서 개략공사비 추정을 위한 기초자료로 활용될 수 있을 것이다.

건축공사 계약해지에 따른 비용산정에 관한 연구 (A Study on the Cost Estimation in Case of Termination in the Building Construction Contract)

  • 이호일;최인성
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.

외국의 유지관리 제도 비교분석을 통한 국내 건축물 유지관리 개선 방안 연구 (A Study of Plans for the improvement of the domestic building maintenance system based on the comparison and analysis of foreign building maintenance systems)

  • 윤효진;정광호
    • 한국디지털건축인테리어학회논문집
    • /
    • 제9권2호
    • /
    • pp.25-33
    • /
    • 2009
  • So far we have investigate and analyzed the actual conditions of building maintenance in Korea and compared the building maintenance laws and systems between Korea and other countries. Now, based on the results from such comparison and analysis, this study proposes the following ideas for improvement: 1) As we can learn from domestic and foreign case studies, in the existing built-up areas becoming obsolete, many building owners remodel their buildings illegally in reaction to current economic and social changes. Therefore, for efficient maintenance of buildings, it is required to improve building maintenance systems by formulating information about inspection items, inspectors, supervisors, inspection costs and intervals of reporting results, depending on how large the buildings are and what they are used for. 2) In addition, to ensure the success of a building maintenance system, it is necessary to keep and manage a history of building maintenance thoroughly and introduce a certification program which gives an appropriate grade to maintenance performance and commits the government to expand their public roles and supporting policies, as widely used in some foreign countries. Further, in keep the building maintenance system secure, there should be a nationwide consensus as well as a favorable evaluation from building owners and manager, and all related people.

  • PDF

건축공사 안전관리비 비율 산정 모형에 관한 연구 (A Study on the Estimating Rate of Safety Management Cost in Building Work)

  • 손기상;갈원모;양학수
    • 한국안전학회지
    • /
    • 제22권5호
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

실적공사비 적산제도 활용을 위한 전기공사비지수 개발 (Development of Electrical Construction Cost Index for Historical Construction Costs Estimation System)

  • 손흥관;이형권;박민영;박인표;권용만;서순석;김광곤;김재현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 전기설비
    • /
    • pp.37-39
    • /
    • 2005
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system for building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is showed to development of electrical construction cost index for estimation of historical costs and contract prices.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

도시재생 사업의 매몰비용에 관한 이해집단간의 의식조사 연구 (A Study on the Perception of Stakeholders on Sunken Costs of an Urban Development Project)

  • 신승일;이웅균;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제14권6호
    • /
    • pp.591-596
    • /
    • 2014
  • 본 연구는 현재 사회적 문제가 되고 있는 도시재생 사업의 매몰비용 관련 인식 조사를 목적으로 실시하였다. 조사결과 지방정부, 중앙정부, 정치권, 조합원 및 토지 등 소유자 모두 매몰비용에 관하여 일정부분 책임과 부담 의무의 필요성이 있는 것으로 나타났다. 매몰비용에 대한 지원은 어느 하나의 주체에게 책임을 전가하기보다 정비 사업에 참여했던 주체 모두가 함께 책임을 통감하여 문제가 되고 있는 매몰비용의 부담과 해결 방안까지 공유해야하는 것으로 나타났다. 공공은 매몰비용에 대해 직접적인 지원보다는 간접적 지원(기반시설 부담, 세제혜택, 규제기준 완화 등)을 통하여 조합 등이 사업 추진의 지속 여부에 대하여 합리적인 선택을 할 수 있도록 유도하여야 하여야 할 것이다.