• Title/Summary/Keyword: Build-Transfer-Lease(BTL)

Search Result 73, Processing Time 0.036 seconds

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology (최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구)

  • Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jea-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.45-57
    • /
    • 2009
  • BTL (Build-Transfer-Lease) Project for Education Facilities are contracted as a package which consists of several education facilities. The general maintenance period of BTL project for education facilities is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Project. This research develops a cost forecasting system using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. This system helps owner's decision-making to estimate the total project cost with various constraints changing. The result of this research suggests more reasonable and effective forecasting model for the maintenance facilities package in the BTL project.

A Study on Problems and Improvement in Operation of the BTL Projects. (임대형 민자 사업(BTL)에서 운영부문의 문제점 분석과 해결 방안 연구)

  • Noh, Jung-Ho;Lee, Jae-Young;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.686-691
    • /
    • 2006
  • Beginning January 2005, the BTL (Build-Transfer-Lease) project was initiated by government to provide high level of public services for the upgraded quality of life. The most important process of the BTL project is operation, because the company have to operate the building about $20{\sim}30$ years after completion. But a lot of problems have been founded so far. For example, no counterplan for the risk in operation, no total control system and the vagueness in project guideline and so on. These problems will cause serious demage to the BTL project. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the improvement and deliver the successful operation in BTL project.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Changes of Spatial Composition by Project Phase of Homebase and Media-space on Variation Type Middle and High Schools (교과교실제 중등학교 홈베이스와 미디어스페이스의 사업단계별 공간구성 변화)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.2
    • /
    • pp.13-24
    • /
    • 2014
  • This study compared and analyzed middle and high school's homebase and media space which are installed along with the introduction of subject classroom system operation method, with regard to the position of arrangement, the type of arrangement, and the change of area, etc. which were changed and applied per the phase of project. For this, design competitions were implemented since 2006 targeting the cases which participated in design directly-indirectly in the researcher's architectural firm, present construction documents among the selected BTL(Build-Transfer-Lease) were completed, and the examples of 10 schools(design competitions 2 schools, BTL selected plans 8 schools) were analyzed, which were operating variation type.

An Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL 민간투자사업의 리스크인자에 대한 영향도 분석)

  • Lee, Yang-Woo;Kim, Soo-Yong;Park, Young-Min
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.58-63
    • /
    • 2006
  • In the recent years, the government pay more interested in BTL projects, this led to rapid growth of BTL projects. But the project stakeholder has encountered with some problems during initial phase. As a result, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. In addition, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. Moreover, the result of this study can be used as a tools for anyone who study or encounter the same problems in the future. The paper can be used as standards for risk assignment that occur between competent authorities and private enterprises.

  • PDF

A Case Study on the Improvement Plan for Cost Prediction of Educational BTL Project based on Running Cost Analysis (교육시설 BTL사업의 유지관리비용 비교분석을 통한 비용추정 개선방안에 관한 사례연구)

  • Park, Moon-Sun;Song, Chang-Youg;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.139-149
    • /
    • 2007
  • The purpose of this study is to examine the problem of BTL(Build Transfer Lease) projects through comparative analysis on running costs, focusing on primary school, junior and senior high school education facilities, and then to provide useful information on the estimation of running costs by suggesting valid cost criteria. For this, eight schools from A and B consulting firms were sampled from capital region and other areas. Sampled schools were classified into four categories according to school grade, and running cost data are collected and analyzed from relative view points. The results of this study are as follows: 1) running costs which are analyzed by categories show some difference among sub-items, 2) major problems related to running cost prediction of BTL projects are revealed and improvement schemes are suggested for two groups (Owner and Project applicants).

Analysis of Human Resource Management System Requirement for School Facility Maintenance (학교시설 유지관리 인력운영 구조체제 요구 분석)

  • Choi, Byong-Mook;Lee, Yong-Hwan
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.15 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • School facilities are in 2000, diversification, mechanized and 'green' change rapidly. School facilities Maintenance, however, maintains a simple maintenance practices in the past. Fortunately, in 2005, from BTL maintenance practices in the private sector has introduced changes in business with the advent of school facilities continues. Thus, facilities maintenance practices that are dotted throughout the country, human resources, dear, detailed by the managing body by operations, facilities maintenance to restructuring the system. Effective the presentation of Improvement is needed.

A Life Cycle Cost Case Analysis on the Build-Transfer-Lease(BTL) Projects of School (학교 임대형민자사업(BTL)의 LCC 사례 분석)

  • Cho, Seung-Yun;Ahn, Jang-Won;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.145-150
    • /
    • 2007
  • This study is a LCC case analysis on the school one of the BTL projects which is constructed by private organizations and rented to government. According to the RFP to make out documents, it is performed the case analysis based on the results of LCC calculation about maintenance & conservation costs; repairing costs and replacement costs. It is analyzed LCC on maintenance & conservation costs for 20 years(rent period) and 65 years(life cycle). As a result of LCC analysis, about more than 50% of total LCC are architectural works and the rest of them are machinery works, electric works, and civil works in the order. And it is also suggested some problems and their solutions to perform LCC analysis on the current BTL projects of school.

  • PDF