• Title/Summary/Keyword: Budget calculation

Search Result 88, Processing Time 0.03 seconds

A Study on the Development methods of Operating Systems Concurrent Spare Parts (CSP 운영체계 개선방안에 관한 연구)

  • 이규헌;김현호;조경익;최광묵;오혁재
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.1
    • /
    • pp.15-29
    • /
    • 2004
  • The existing CSP systems is inefficient and brings about waste of budget in some operating aspects which show accumulation of unnecessary items, omitted or running short items and limitation of timely use of them. The purpose of this study is to analyze the actual situation of existing CSP(calculation and estimation of CSP requirements), and to suggest a few methods (post control system by activating buy-back system, and middle and long term operating system itself in relation to budget) to improve the CSP operating systems in order to maximize the effectiveness of combat strength and to contribute to the economic efficiency of defense management. The results show that improved method is efficient and effective by comparing with some actual data.

A Study on the Terrestrial DTV Channel Model (지상파 DTV 채널 모델에 관한 연구)

  • Lee, Seung-Youn;Na, Chae-Dong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.4
    • /
    • pp.57-65
    • /
    • 2010
  • In this paper we proposed channel models for terrestrial ATSC (Advanced Television Systems Committee) DTV (Digital Television) system in South Korea. For the purpose of this model, we research on propagation model involved in terrestrial DTV system and analyze out field test data of terrestrial DTV broadcasting carried out in korean Broadcasting System. Using the measured values of received field strength, newly proposed Path-loss models have more correctly than that of conventional Path-loss models. This models can be utilized usefully for the efficient ATSC DTV system implementation requiring accurate link-budget calculation

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

A Study on Developing the Model of Reasonable Cost Calculation for Privacy Impact Assessment of Personal Information Processing System in Public Sector (공공기관 개인정보 처리시스템의 개인정보 영향평가를 수행하기 위한 합리적인 대가 산정 모델 개발에 관한 연구)

  • Shin, Young-Jin
    • Informatization Policy
    • /
    • v.22 no.1
    • /
    • pp.47-72
    • /
    • 2015
  • According to the progress of national informatization throughout the world, infringement and threaten of privacy are happening in a variety of fields, so government is providing information security policy. In particular, South Korea has enhanced personal impact assessment based on the law of personal information protection law(2011). But it is not enough to effect the necessary cost calculation standards and changeable factors to effect PIA. That is, the budgets for PIA was calculated lower than the basic budget suggested by Ministry of Government Administration Home affairs(2011). Therefore, this study reviewed the cost calculation basis based on the literature review, cost basis of similar systems, and reports of PIA and obtained to the standard with Delphi analysis. As a result, the standards of PIA is consisted to the primary labors and is utilized to how the weights by division of target system, construction and operating costs of target system, type of target systems, etc. Thus, the results of this study tried to contribute to ensure the reliability of PIA as well as the transparency of the budget for privacy in public sector.

A Study on the Output Power Optimization of Mobile WiMAX Base Station (Mobile WiMAX 기지국의 최적 출력파워 도출에 관한 연구)

  • Kim, Sung-Man
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.4A
    • /
    • pp.341-349
    • /
    • 2010
  • In this paper, we studied on the optimization of the output power of Mobile WiMAX (IEEE 802.16) base station considering the technical condition of base station and wireless channel condition. The optimum power of base station can be estimated based on the link budget calculation of downlink and uplink in the Mobile WiMAX communication system. We investigated the optimum output power of base station in the case of 2Tx-2Rx base station with $2{\times}2$ MIMO(multiple input multiple output) technology, 2Tx-4Rx base station with improved receiver sensitivity, and 4Tx-4Rx base station with beamforming technology.

A Study on the Program for Estimation of Electric Rates and the Analysis for Power Consumption in Complex Consumer (복합다용도 수용가의 전력소비특성 분석 및 전기요금 산정프로그램 개발)

  • Kim, Se-Dong;Yoo, Sang-Bong;Ki, Yoo-Kyung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.103-107
    • /
    • 2014
  • Together with housings, general buildings and industrial facilities, multi-purpose complexes are equipped with various and special equipment. They are often used by many unspecified people, which causes an increase in annual electricity consumption. Because of this, a great amount of money has been spent for electric charge, far more in excess of the budget, so a reasonable electricity rate needs to be estimated. In this study, we surveyed the power consumption, average power use, and annual electricity bill of multi-purpose complexes in the past five years. To see the general tendency of the survey, we conducted a statistical analysis with such parameters as average, maximum, and minimum values. Through regression analysis, we could see the trend of the survey in linear way. Based on the survey, we have developed an electric-rate calculation program to estimate the next year's budget on electricity.

Dissolved Oxygen Budget in Floating Net Cage of Fish Farm at the Coastal Area -In case of yellow tail farm in Konli-Do- (해산 어류 양식장 가두리의 DO수지 -곤리도 방어 양식장의 경우-)

  • KIM Yong Sool
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.21 no.1
    • /
    • pp.30-34
    • /
    • 1988
  • In roastal fish farms the farmers, especialy engaging in dealing with the floating cage culture, going to know about relationships between holding capacity and water quality in cage. Some of water quality managers and specialists studing physiological ecology understand that the key of water quality management concerned fish farming is budget of dissolved oxygen. This paper deals with oxygen budget in floating cage of the yellow tail farms at southern coastal area in Korea. The sampling station is located at Konli-Do fish farm near Chungmu, and the data is collected for 24 hours from 3:00 p.m. 8th September 1987. In result, the needed oxygen coming after the consumption by the rearing fish had been supplied with the tide current exchange, the sum of oxygen produced by phytoplankton photosynthesis and diffused from atmosphere are no more that $43\%$ for the needs of sea water consumption included respiration of planktons and decomposition of organic matters. The optimum holding capacity of cage is possible to compute with the calculation of minimum diurnal water exchange rate $[Qin{\cdot}V^{-1}\;(C-\bar{c})]$ through net mesh of cage.

  • PDF

Link Budget and Performance Analysis of UWB Transmission Method for Off-body HDR Communication in WBAN System (WBAN에서 신체 외 고속통신을 위한 UWB 전송 방식의 링크버짓 및 성능 분석)

  • Choi, Nack-Hyun;Hwang, Jae-Ho;Jang, Sung-Jeen;Kim, Jae-Moung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.1
    • /
    • pp.53-64
    • /
    • 2009
  • For a realization of the ubiquitous society, applying IT to vehicle industry has recently been an attractive issue to make wireless communication in body area network possible to everywhere. In this paper, we propose the physical layer symbol structure based on PPM scheme of the IEEE 802.15.4a for the off-body high data rate WBAN system. We propose four symbol structures which is classified according to the number of the chip and whether the channel coding is used or not. We calculate the required SNR through the link budget calculation and the recently proposed off-body WBAN channel environment was applied in the simulation. The results of four systems show that small number of burst's chip enhances the performance and the system is capable to achieve the data rate of 10 Mbps.

  • PDF

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.