• Title/Summary/Keyword: Bridge maintenance

Search Result 984, Processing Time 0.029 seconds

The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone (교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과)

  • Kang, Tae-Ku;Min, Kyung-Ju;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

Application of Elastomeric Bearing for Railway Bridge (철도교량의 탄성받침 적용방안)

  • Kang, T.W.;Oa, S.W.;Kim, D.S.;Kang, Y.S
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1697-1702
    • /
    • 2010
  • It has been recognized for decades that the spherical bearing which is sliding on curved surface in the intrinsic behavior is optimized for the railway bridge requiring a large slope deflection. However, the spherical bearing is easily corrosived at the PSC girder bridge which is exposed to the outside so the normal function of bridge bearing is not fulfilled fully. It is common that the corrosion is happened at the operating plate of steel bridge bearing and generally it is necessary to replace the bridge bearing after 20~25 years. Accordingly, It costs multi billion dollars for maintenance each year and the necessity of improvement become a issue. Korea Rail Network Authority(KR) suggested to apply the Elastomeric bearing instead of Spherical bearing through the task of construction site of 2006. But the normal Elastomeric bearing is optimized for the Highway bridge so it needs the special consideration to satisfy each design condition required by railway bridge. As the result of examination of Elastomeric bearing at the railway bridge construction site, the stress is decreased by effective dispersion of earthquakes and the maintenance fee is also decreased.

  • PDF

The Effect and Countermeasures of The Vertical Track Settlement Caused by Expand and Contract Behavior of the High-Speed Railway Bridge Girder (고속철도 교량상판의 온도신축작용이 궤도처짐에 미치는 영향과 대책에 관한 연구)

  • 강기동
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.283-289
    • /
    • 2004
  • According to continuos welded rails on a bridge, temperature changes bring about the expansion of the bridge deck adding axil forces on the track. Moreover, the ballast on the bridge deck expansion joint is moved due to the bridge deck. If bridge decks are longer, the influence is greater, loosening ballast, causing track irregularities, and deteriorating passengers' comfort. Considering structure of bridge itself and tolerance of track irregularities caused by the loosened ballast on bridges, the maximum length of a deck should be less than 80m, which is the same as the standard of the French railway. In this study, an interaction between the expansion related to the bridge length and irregularity in longitudinal level referring to measurements and maintenance works performed in the high-speed railways was analyzed. This research shows that installation of sliding plate or vertical ballast stopper is not a good option since it is difficult to install. On the other hand, installation of movable fastener or gluing is easy but its influence is insignificant. To conclude, switch tie tamping or manual tamping is more effective than others.

The Effects on Structures caused by the Replacement of Bridge Bearing (교량구조물의 받침 교체 효과)

  • Park, Chang-Ho;Ku, Bon-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.4
    • /
    • pp.209-217
    • /
    • 2002
  • The effects on structures caused by the replacement of the bridge bearings are investigated in this study. The bearings of the bridge are seriously deteriorated because of the breakage of lower concrete and the corrosion of the bearing itself. Also, the negative reaction states are created at some bearings on the abutment. Then, the bridge has occurred excessive vibrations and severe noise and impact whenever heavy trucks pass the above joints. The existing bearings are replaced using the adjustable bearing. The height of the bearings is adjusted to minimize the level difference of above joint and also to induce the appropriate distribution of live loads The effects of replacing the bearings are investigated by measuring the behaviors of the bridge without and with replacing works. The results without replacing the bearing show that the distribution of displacements and stresses is distorted in comparison with the analytical results. Also the bridge without replacing the bearing shows that the impact and vibration from the heavy trucks are larger than those with replacing the bearing. Load carrying capacity of the bridge increase about 1.8 times through replacing the bearing. The above results show that the structural performance of the bridge is improved by replacing only bridge bearings.

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance (교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Lee, Min-Jae;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.533-542
    • /
    • 2016
  • The periodic maintenance of bridges is necessary once they have been constructed and its cost depends on various factors, such as their condition, environmental conditions and so on. To make a decision support system, it is essential to establish a basic reconstruction cost model. In this study, a regression model is suggested for calculating the reconstruction cost for typical cases and influential factors, depending on the type of bridge and its components, by analyzing the basic bridge specifications based on the data of the Bridge Management System (BMS). The details for each case were estimated in consideration of the cost calculation variables. The details for each case were estimated in consideration of the cost calculation variables. The cost model for the new construction of the superstructure, substructure and foundation and the temporary bridge construction and demolition costs were drawn from the regression analysis of the estimation results of typical cases according to the cost calculation variables. The reconstruction costs for different types of bridge were obtained using the cost model and compared with those in the literature. The cost model developed herein is expected to be utilized effectively in maintenance decision making.

Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges (불확실성을 고려한 철도 교량의 LCC분석 시스템 개발)

  • Cho, Choong-Yuen;Sun, Jong-Wan;Kim, Lee-Hyeon;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

Condition Evaluation of Concrete Bridge Decks using CPR (레이더를 이용한 콘크리트 교량의 바닥판 상태평가)

  • Suh, Jin-Won;Rhee, Ji-Young;Lee, Il-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.4
    • /
    • pp.101-107
    • /
    • 2000
  • In this study, the Ground Penetrating Radar(GPR) was tested to evaluate the condition of concrete decks. Test results obtained by CPR were compared with values measured from drilled cores and damage mapping by the visual survey. It is shown that GPR can provide highly accurate measurements of layer properties of concrete decks and can map areas of deterioration in bridge decks by dielectric constants. The deck condition can be grouped into categories of "good" or "distressed". The ground penetrating radar data shows promise for producing rapid and accurate condition assessment for bridge decks. And these data can be used to evaluate highway bridge condition and make cost-effective bridge deck rehabilitation by accurately estimating the quantity of deteriorated concrete.

  • PDF