• 제목/요약/키워드: Bridge maintenance

검색결과 984건 처리시간 0.023초

RC 교량의 현장 안전진단을 위한 지식기반시스템의 원형개발 (Prototyping of Knowledge-Based Systems for Field Inspection and Safety Assessment of RC Bridges)

  • 황진하;박종회;안승수;김기현
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권3호
    • /
    • pp.185-192
    • /
    • 2002
  • Prototyping for field inspection safety assessment expert system of bridge structures is presented in this paper. Knowledgebase with production rules is constructed using the semiautomatic method on the basis of bridge inspection manuals and working reports of the related agency. Backward inference method is taken with the aids of external shells as a inference engine of knowledge-based systems. Implementation of the developed prototype system on MS Windows98 will shows inspiring aspects useful to guide and standardize the field works. In the case to be reinforced with abundant knowledge bases, this will be expected to be educate the practicing engineers.

교량 적정 점검 주기에 관한 비교 연구 (A Study of the Proper Control-Interval through Comparative Analysis on Bridge Maintenance System)

  • 이용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.113-118
    • /
    • 2001
  • 사용중인 교량의 안전성, 사용성, 내구성을 확보하기 위한 시발점은 교량에 대한 점검과 진단이다. 본 논문에서는 최근 개정된 시설물 안전진단에 관한 특별법에 제시된 점검주기와 독일의 점검주기를 비교하고, 외국의 손상 보고서에 나타난 손상발견시기를 분석하였으며, 분석 결과를 기초로 국내 진단 주기의 재조정을 제안하였다. 이를 위해 비교 대상인 양국의 교량 현황을 살펴보고, 유지관리 체계와 비용을 객관적 비교근거로 제시하였다.

  • PDF

교량, 토공 접속구간 궤도동적계측 및 해석에 관한 연구 (Experimental and Analysis Study on Transition Area Between Bridge and Earthwork)

  • 강윤석;나성훈;신정렬;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.250-255
    • /
    • 2002
  • The transition between bridge and earthwork often causes the problems of maintenance. The damages of the track on the transition area influence running safety of train and serviceability, increase the maintenance cost. Therefore it is very important to evaluate the dynamic responses of transition and take a efficient measure. In order to evaluate the dynamic behavior of track, the field estimations are performed at the transition area of a conventional line between bridge and earthwork. And the track system on the transition area numerically analyzed to evaluate the dynamic behavior of damaged track with void sleeper. The measured values and Analysis results such as wheel contact force, rail stress, displacement acceleration and track irregularity in the transition area show the dynamic forces are severe. So it is recommended that the transition area should be improved the rigidity by reinforcing the rail.

  • PDF

RC-T형교의 비선형거동해석을 위한 하중분배법에 관한 연구 (A Study on the Method of Load Distribution for Nonlinear Behaviour in RC-T Bridge)

  • 임정순;김성칠;박성용
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권1호
    • /
    • pp.129-135
    • /
    • 1998
  • The characteristic of load-distribution is investigated by using nonlinear analysis with a field loading test of existing bridge In this study, nonlinear load-distribution technique for quantitative analysis was adopted. The results were compared with linear solution technique with data from failure test at existing RCT-girder bridge and examine the adequacy of the failure mode. The results of this study showed that the linear solution technique and the proposed nonlinear solution technique agreed well in linear region but did not matched well in nonlinear region because of load-redistribution, and that the effect of load-redistribution was considered to analysis of nonlinear region by linear solution.

  • PDF

강교 용접 결함부의 피로평가 (Fatigue Assessment of Butt Joint with Weld Defect in Steel Bridge)

  • 전귀현
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권1호
    • /
    • pp.98-107
    • /
    • 1998
  • There are many weld defects such as surface crack, lack of fusion, and imcomplete penetration in the butt joint of the existing steel bridges. The crack-like defects may significantly reduce the fatigue life of the structure. This paper presents the procedure and the results of the fatigue assessment of the butt joints with weld defect in the existing steel girder bridge. The butt joints with imcomple penetration were instrumented with strain gages to determine the stress histogram under normal traffic. Based on the measured stress histogram the crack propagation analyses were performed for the fatigue assesment. By using the suggested procedure and methodology, one can decide the time of periodic inspection and the necessity of repair of the butt joints with serious weld defects in the existing steel bridge.

  • PDF

교량의 경험적 손상도 곡선 (Empirical Fragility Curves for Bridge)

  • 이종헌;김운학;최정호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권1호
    • /
    • pp.255-262
    • /
    • 2002
  • This paper presents a statistical analysis of empirical fragility curves for bridge. The empirical fragility curves are developed utilizing bridge damage data obtained from the 1995 Hyogoken Nanbu(Kobe) earthquake. Two-parameter lognormal distribution functions are used to represent the fragility curves with the parameters estimated by the maximum likelihood method. This paper also presents methods of testing the goodness of fit of the fragility curves and estimating the confidence intervals of the two parameters(median and log-standard deviation) of the distribution. An analytical interpretation of randomness and uncertainty associated with the median is provided.

Fuzzy 개념을 이용한 RC도로교의 건전성평가 모델 개발 (Development of Integrity Assessment Model for Reinforced Concrete Highway Bridges Using Fuzzy Concept)

  • 나기현;박주원;이증빈;정철원
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권2호
    • /
    • pp.151-161
    • /
    • 1998
  • In this study, an attempt is made to apply the concept of fuzzy-bayesian theory to the integrity assessment of RC highway bridge, and uncertainty states are represented in terms of fuzzy sets which define several linguistic variables such as "very good", "good", "average", "poor", "very poor", etc. Especially, the concept of fuzzy conditional probability aids to derive a new reliability analysis which includes the subjective assessment of engineers without introducing any additional correction factors. The fuzzy concept are also used as reliability indexes for the condition assessment based on the proposed models, the proposed fuzzy theory-based approach with the results of visual inspection and extensive field load tests are applied to the integrity assessment of a new RC highway bridge, namely, Jichok bridge.

  • PDF

구조동정법(構造同定法)에 의한 교량(橋梁)의 안전성(安全性) 평가(評價) (Bridge Safety Evaluation Based on the System Identification)

  • 김기대;이상화
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권2호
    • /
    • pp.162-169
    • /
    • 1998
  • This paper presents the application of system identification approaches for the safety assessment of RC-T type bridge based on the result of field test. For these problems, the moment of inertia of cross-sectional area and the natural frequency of bridge were used as structural parameters, the SAP90 program for the structural analysis and the SLP method for the minimum error. As a result, it is found that the proposed algorithm for this study appears applicable to real structures with reasonable complexity. It is shown that the introduction of approximate quadratic equations is more realistic and timesaving than the common methods.

  • PDF

강합성형 교량의 합리적인 타설방법과 순서에 관한 연구 (The Reasonable Concrete-Placing Methods and Sequences of Composite Steel Bridge)

  • 조병완;서석구
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권2호
    • /
    • pp.205-212
    • /
    • 1999
  • Recently, unexpected cracks in the concrete deck slab of composite steel bridges have been widely reported at an early age of concrete placing due to the concrete placing sequence and methods. Accordingly, the analytical research was carried out to verify the negative moment at an internal supports due to the several concrete pouring sequence and to determine the reasonable concrete placing method on the deck slab of composite steel bridge. The results show that the conventional concrete-placing method, which pours concrete first on the positive moment regions and then negative regions, leads to the minimum moment at an internal supports. However, the conventional method produces two impractical construction joints on every spans and makes field engineer to pour concrete continuously. In conclusion, this concrete-placing method was verified to be reasonable only when the construction joint was placed at the $\frac{5}{8}l{\sim}\frac{6}{8}l$ location of the middle span.

  • PDF

A Bridge Transported Bilateral Force-Reflecting Servo-Manipulator for Maintenance of Nuclear Pyroprocessing Equipment

  • Park, B.S.;Jin, J.H.;Ko, B.S.;Lee, J.K.;Yoon, J.S.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.2226-2230
    • /
    • 2005
  • The Advanced Spent Fuel Conditioning Process (ACP), which is a pre-disposal treatment process for spent fuel is being developed at the Korea Atomic Energy Research Institute (KAERI). The ACP equipment is operated in an intense radiation field as well as in a high temperature. Thus, the equipment is designed in consideration of the remote handling and maintenance. This paper describes a Bridge Transported Bilateral Force-Reflecting Servo-Manipulator (BTSM) system, which is being developed to overcome the limitation of access that is a drawback of the mechanical Master-Slave Manipulators (MSMs), which are mounted on the ACP hot cell wall for the operation and the maintenance of the ACP equipment. The BTSM system was manufactured and temporally installed at the mockup to test its performance. The manufactured BTSM system will be installed at the ACP hot cell on June 2005 after the accomplishment of the performance test. The BTSM system consists of four components: a transporter with a telescoping tubeset, a slave manipulator, a master manipulator, and a remote control system. This system will highly increase the volume of coverage for the operation and maintenance of the ACP equipment.

  • PDF