• 제목/요약/키워드: Bridge Planning

검색결과 189건 처리시간 0.025초

국내최장 고속철도 정지고가(L=9.3km) 교량형식 개발 및 설계 - 35m PSM PSC Box교, 80m 3경간 Arch교, 국내최초 ED교 - (The Planning and Design of Jeong-Ji High Speed Railway Bridge)

  • 장인호;박경호;박종화;김영남;김선필
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1691-1696
    • /
    • 2010
  • Jeong-Ji overbridge is designed to be 9.3km long, the longest for a high speed railway bridge ever constructed in Korea. This bridge is constituted of three types of structure. Standard type bridge is 35m PSC Box bridge which will be constructed by Precast Span Method. To cross the Cheonan Nonsan Expressway, 80m three-span steel arch bridge is designed to avoid rail expansion joint. Finally, Extradosed bridge is planned for high speed railway bridge for the first time in Korea based on originative and advanced design techniques. It is expected that this will contribute to the development of national technology for long-span high speed railway bridges.

  • PDF

호남고속철도 4-2공구 교량 계획 및 설계 (Planning and Design of Honam High-Speed Railroad's Bridges)

  • 배민혁;우동인;조현;안광수;한녹희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1470-1477
    • /
    • 2010
  • In 2004, Korea has become the world's fifth-express train states, Honam high-speed railroad which goes down another line with existing Kyoungbu high-speed railroad is divided 19 construction sectors, its total length is 230.9 km and it will be constructed by 2017. This site is located in Jeollabukdo Jeong-eup district along 9.38 km. There are three representative bridges. ;One is the PSC box girder bridge, another is the Extradosed bridge, and the other is the three continuous spans half-through hybrid arch bridge. This paper shows a planning and design of these bridges.

  • PDF

BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발 (BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge)

  • 천경식;박원태
    • 한국산학기술학회논문지
    • /
    • 제16권10호
    • /
    • pp.7204-7210
    • /
    • 2015
  • 본 연구는 2주탑 3경간 사장교의 사업기획 단계에서 3차원 모델정보에 기반하여 신속한 개략 공사비 및 물량 산정을 지원하는 시스템을 개발하였다. 우선, 기 설계된 사장교 설계정보(구조계산서, 도면, 수량)를 분석하여 설계변수를 도출하였다. 도출된 설계변수를 기반으로 매개변수적으로 사장교를 3차원 모델링하는 BIM Wizard를 개발하였다. BIM Wizard를 이용해 작성된 3차원 모델로부터 사장교의 주요 재료에 대한 수량을 직접 산출하며, 케이블 교량에 대한 단가 D/B와 산출된 수량을 연계하여 개략공사비를 산정할 수 있다. 결과적으로, 사업 초기단계에서 m당 혹은 $m^2$당 실적 평균공사비를 산출하는 재래적인 방식보다 더 구체화된 공사비를 산출할 수 있는 시스템을 구축하였다. 이로써, 우리는 사장교에 대해 입찰단계에서 가능한 신속하게 다양한 대안을 검토할 수 있을 것이다.

An investigation on the bearing capacity of steel girder-concrete abutment joints

  • Liang, Chen;Liu, Yuqing;Zhao, Changjun;Lei, Bo;Wu, Jieliang
    • Steel and Composite Structures
    • /
    • 제38권3호
    • /
    • pp.319-336
    • /
    • 2021
  • To achieve a rational detail of the girder-abutment joints in composite integral bridges, and validate the performance of the joints with perfobond connectors, this paper proposes two innovative types of I-shaped steel girder-concrete abutment joints with perfobond connectors intended for the most of bearing capacity and the convenience of concrete pouring. The major difference between the two joints is the presence of the top flange inside the abutments. Two scaled models were investigated with tests and finite element method, and the damage mechanism was revealed. Results show that the joints meet design requirements no matter the top flange exists or not. Compared to the joint without top flange, the initial stiffness of the one with top flange is higher by 7%, and the strength is higher by 50%. The moment decreases linearly in both types of the joints. At design loads, perfobond connectors take about 70% and 50% of the external moment with and without top flange respectively, while at ultimate loads, perfobond connectors take 53% and 26% of the external moment respectively. The ultimate strengths of the reduced sections are suggested to be taken as the bending strengths of the joints.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

특징형상 인식을 통한 창성적 자동 공정계획 수립 - 복합특징형상 분류를 중심을 - (Generative Process Planning through Feature Recognition)

  • 이현찬;이재현
    • 한국CDE학회논문집
    • /
    • 제3권4호
    • /
    • pp.274-282
    • /
    • 1998
  • A feature is a local shape of a product directly related to the manufacturing process. The feature plays a role of the bridge connecting CAD and CAM. In the process planning for he CAM, information on manufacturing is required. To get the a manufacturing information from CAD dat, we need to recognize features. Once features are recognized, they are used as an input for the process planning. In this paper, we thoroughly investigate the composite features, which are generated by interacting simple features. The simple features in the composite feature usually have precedence relation in terms of process sequence. Based on the reason for the precedence relation, we classify the composite features for the process planning. In addition to the precedence relation, approach direction is used as an input for the process planning. In the process planning, the number of set-up orientations are minimized whole process sequence for the features are generated. We propose a process planning algorithm based on the topological sort and breadth-first search of graphs. The algorithn is verified using sample products.

  • PDF

철근콘크리트 교각의 연성과 손상도 평가 (Evaluation of Ductility and Damage Ratio for Reinforced Concrete Bridge Piers)

  • 박창규;이대형;이은희;김훈;정영수
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 추계 학술발표회 논문집
    • /
    • pp.197-204
    • /
    • 2002
  • The resent earthquakes in worldwide have caused extensive damage to highway reinforced concrete bridge piers. It has been observed in the Korean Peninsula that the number of minor or low earthquake motions have increased year by year. Since the concern about the earthquake hazards is increased, the objective of this research is to evaluate the damage of reinforced concrete bridge piers subjected to probable earthquake motions. Experimental investigation was conducted to study the seismic performance of the full-scale specimens in size D=1.2m H=4.8m, which were constructed with different longitudinal lap splice and loading pattern, through the quasi-static test and the pseudo-dynamic test. It is thought that this result could contribute to establish the retrofit decision-making and disaster planning of reinforced concrete bridge piers in earthquake regions. And it could be also possible to quantify the damage of reinforced concrete bridge piers under cyclic loading

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF