FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Polymer Base Bored Pile in Bangkok Subsoils

  • Teparaksa, Wanchai
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.407-426
    • /
    • 2008
  • The bentonite slurry has been used as the stabilize suspension for wet process bored pile construction in Thailand. The bentonite suspension has benefit on filtration in the sand layer, but it creates thick cake film along pile shaft and loose sedimentation at pile toe. The base grouting technique was widely used to rectify the soft base or loose sedimentation problem of bored pile. The base grouting technique was not increased only end bearing capacity, but was also more increase in skin friction capacity of the bored piles. The comprehensive researches on base grouting was carried out by installing PVC casing inside the shaft to allow the drilling through the pile base in order to collect the soil sample below the pile tip. The polymer based slurry recently was used to replace the bentonite slurry to overcome the thick cake film along pile shaft as well as loose sedimentation at pile toe. The extent research on polymer slurry by physical model was performed to verify the real behavior of polymer. The appropriate mixing ratio of polymer was proposed. The design skin friction coefficient, $\beta$ and end bearing coefficient, Nq, for sand layer base on fully instrumented tested pile were proposed. The application on remedial of the lose capacity bored pile with large displacement in Bangladesh was proposed and discussed.

  • PDF

PHC 말뚝의 미얀마 현지 사용말뚝 대체 적용 가능성 평가 (Applicability Evaluation of PHC Pile to Replace Myanmar Local Use Piles)

  • 고효진;김현우;박용규;윤기원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2017
  • In this paper, the applicability of PHC piles to replace Myanmar local piles were evaluated. In Myanmar, based on the size of the building, foundation design and field applications are carried out using bored pile and square pile. As a result of the analysis, the application of PHC pile is more economical than conventional bored pile or square pile which was applied in the high rise (17-story) and middle story (12-story) buildings. However, in the low - rise (8-story) building, the application of the existing square piles was found to be more economical than PHC pile.

  • PDF

A Retrospection on Foundation Design of Taipei 101

  • Chin, Chung-Tien;Chao, Hsiao-Chou;Chang, Der-Wen
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.145-156
    • /
    • 2009
  • Large diameter bored pile was selected as the foundation type for Taipei 101. The pile construction method and specific construction procedures were determined based on the results of trial installation and pile load tests. The baseline for foundation design was established using the friction versus depth characteristics of each ground layer obtained from the pile load tests. As the ground profile and depth to the top of rock formation varied significantly on this site, the pile length, bearing capacity and settlement for single pile were analyzed using the information interpreted from adjacent boreholes. The post grouting at pile tip was mandatory for pile construction. Nevertheless, it was treated as a measure reducing the influence of construction uncertainties and providing extra safety for the foundation system.

  • PDF

순환자원 활용 말뚝채움재의 실내모형시험을 통한 주면마찰력 비교 연구 (A Comparative Study of Skin Frictional Force through a Laboratory Model Test of Pile Filling Materials with Utilizing Circulating Resources)

  • 송상훤;정영순;서세관
    • 한국농촌건축학회논문집
    • /
    • 제23권3호
    • /
    • pp.1-8
    • /
    • 2021
  • Rural multi-purpose buildings needs to ensure their safety against various disasters. Therefore, a pile foundation, which is a foundation type that can transmit the load of the structure to the bedrock layer, has been designed. The pile foundation method is largely divided into driving piles method and pre-bored pile method. Recently, in order to respond to the Noise and Vibration Control Act and related environmental complaints, construction of pile foundation adopts pre-bored pile method. The bearing capacity of the pre-bored pile method is calculated through a load test in situ. However, a disadvantage stems in that it is difficult to measure the ultimate bearing capacity due to field conditions. Therefore, in this study, the skin frictional force of pre-bored pile was measured through a model test in laboratory for each pile filling material. In result, the pile filling material with using circulating resources shows superior skin frictional force than ordinary portland cement. This study also judged that the result can be applied in place of ordinary Portland cement in the field.

Effects of polymer support fluid on shaft resistance of offshore bored piles

  • Chungsik Yoo;Chun-Won Shin
    • Geomechanics and Engineering
    • /
    • 제33권5호
    • /
    • pp.519-528
    • /
    • 2023
  • In this paper, we present the results of an experimental study on the effect of polymer support fluid on shaft resistance of offshore bored piles. A series of pullout tests were performed on bored piles installed under various boundary conditions considering different types of grounds and support fluids, and a range of support fluid exposure times. Contrary to previous studies concerning onshore bored piles, a time dependent effect of polymer fluid on shaft resistance was observed in all ground types. The adverse effect of polymer support fluid on the shaft resistance, however, was considerably less than bentonite support fluid for a given exposure time. No significant reduction in shaft resistance was evident when limiting the exposure time of the polymer support fluid to the side wall of the borehole within 2-3 hours. The degree to which the polymer fluid affects shaft resistance seemed to vary with the ground type. A proper consideration should be given to the time dependent effect of polymer fluid on shaft resistance of bored piles installed in offshore construction environment to limit its adverse effect on the pile performance. The practical implications of the findings are discussed.

매입말뚝 충전재로서 고화토의 적용성 (Applicability of Solidified Soil as a Filling Materials of Bored Pile)

  • 김기웅;채종길;한병권
    • 한국지반신소재학회논문집
    • /
    • 제11권3호
    • /
    • pp.37-42
    • /
    • 2012
  • 국내에 시공되고 있는 매입말뚝의 충전재는 주로 시멘트 페이스트를 사용하고 있다. 시멘트 페이스트를 사용한 충전재는 현장 시공 시 실 주입량이 지나치게 커서 비효율적이며, 설계기준에 비해 지나친 강도를 발현하여 시멘트사용에 따른 환경성 문제를 지니고 있다. 이에 대한 대안으로 매입말뚝 시공 시 발생하는 굴착토사를 활용하여 적정 고화제를 혼합한 고화토를 충전함으로써 폐기물 처리비용 절약과 친환경적인 고화토 충전공법의 현장적용성을 검토하였다. 일축압축강도 시험과 현장 재하시험 결과를 토대로 고화토와 기존 시멘트 페이스트 주입재의 성능을 비교하고 설계기준에 적합한지 여부를 검토하였다. 그 결과 고화토 충전재는 시멘트 페이스트 충전재와 유사한 성능을 나타내며 설계기준에도 적합하여 매입말뚝 충전재로서 고화토의 적용성을 확인하였다.

건축기초에서의 매입말뚝 설계기준 및 사례 (Review of Design Guide and Case Study on Bored Prefabricated Piling Method in Architectural Building Foundation)

  • 이원제
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.549-558
    • /
    • 2008
  • Well known and widely used in urban area and limited installation condition, a low noise and vibration piling method which has being called Bored Prefabricated Piling Method was reviewed in terms of design guide, and introduced a few case as well. Among the areas being applied of that method, a structural guide of architectural foundation was reviewed and compared to civil engineering foundation area to provide wider information for the foundation engineers. With introducing a few case application including pile load testing review especially dynamic testing in normal building foundation work, engineers may have a useful information on the design and construction of the piling method even different engineering area. It may also make enhancement a view of foundation engineering knowledge to various pile foundation area.

  • PDF

PHC 매입말뚝의 하중저항 설계정수 제안 (Suggestion of Load and Resistance Factored Design Value for PHC Bored Pile)

  • 박종배;박용부;이범식;김상연
    • 토지주택연구
    • /
    • 제3권3호
    • /
    • pp.279-286
    • /
    • 2012
  • 뢰성에 기반한 한계상태설계법은 국제표준화기구인 ISO뿐만 아니라 국내의 각종 건설관련 기준에서도 적용되는 등 국내외적으로 기존 허용응력설계법을 대체하고 있는 실정이다. 본 논문에서는 국내에서 건축물의 기초로 많이 사용되고 있는 PHC 매입말뚝을 대상으로 한계상태설계법의 일종인 LRFD 설계정수를 제안하였다. PHC 매입말뚝의 LRFD 설계정수를 제안하기 위해 81개의 현장 동재하 시험자료와 이들 말뚝에 대한 지지력 설계(Meyerhof 설계법, SPT-CPT 전환 설계법) 자료를 분석하고 목표 신뢰도 지수 2.33과 3.0에 대해 하중저항계수를 제시하였다. PHC 매입말뚝의 저항계수는 목표 신뢰도 지수에 따라 Meyerhof 방법, SPT-CPT 전환법은 각각 0.36~0.44, 0.24~0.31을 나타내었다.

사질토 지반에서 시멘트밀크 주입비에 따른 매입말뚝의 수평지지력 (The Lateral Load Capacity of Bored-Precast Pile Depending on Injecting Ratio of Cement Milk in Sand)

  • 홍원표;윤중만
    • 한국지반신소재학회논문집
    • /
    • 제12권4호
    • /
    • pp.99-107
    • /
    • 2013
  • 매입말뚝의 수평저항 특성을 고찰하기 위하여 매입말뚝에 대한 수평재하시험을 실시하여 수평하중과 수평변위관계를 분석하였다. 말뚝수평재하시험은 시멘트 밀크가 말뚝매입길이의 50%, 70%, 100%로 주입된 6개의 말뚝에 대하여 실시하였다. 시멘트 밀크의 주입비(시멘트 밀크 주입길이/말뚝의 길이)는 매입말뚝의 수평변위, 항복하중, 수평지지력에 큰 영향을 미치는 것으로 나타났다. 시멘트 밀크의 주입비가 증가할수록 매입말뚝의 수평변위가 발생되기 시작하는 위치는 지표면에 가까워지며 말뚝의 수평변위는 감소한다. 그리고 말뚝의 수평지지력과 항복하중은 시멘트 밀크 주입비가 증가할 수록 크게 나타났다. 시멘트 밀크 주입비가 1인 매입말뚝의 항복하중과 극한수평지지력은 시멘트 밀크 주입비가 0.5인 경우보다 약 2~3배 정도 크게 나타났다.