• Title/Summary/Keyword: Boiler Modeling

Search Result 44, Processing Time 0.025 seconds

EXPERIMENTAL AND COMPUTATIONAL PREDICTION OF CONCENTRATION OF CARBON MONOXIDE GAS RELEASED FROM EXHAUST TUBE OF GAS BOILER (가스보일러 배기통 이탈에 의한 CO가스 누출확산 실험 및 수치해석)

  • Kang, Seung-Kyu;Choi, Kyung-Suhk;Yoon, Joon-Yong
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.172-175
    • /
    • 2008
  • In the last five years, 45 people died and 104 were wounded because of carbon monoxide poisoning accident. CO poisoning accident is higher than any other gas accident in the rate of deaths/incidents. Most of these CO poisoning accidents were caused by defective exhaust tube in the old gas boiler and multi-use facility. In this study, the spread of CO gas released from leakage hole of exhaust tube was analyzed by computational flow modeling and concentration measuring test. CO gas leaked form exhaust tube in a building was highest concentrated near the ceiling and formed the circular currents along the walls. Through these experiments and simulation, the reasonable installation location of CO alarm was made certain and suggested.

  • PDF

Analysis of Mechanism for Diffusion of Incomplete Combustion Gas Released from Domestic Gas Boiler (가정용 보일러의 불완전연소가스 누출확산 메커니즘 해석)

  • Kang, Seung-Kyu;Choi, Kyung-Suhk;Yoon, Joon-Yong
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2868-2873
    • /
    • 2008
  • Carbon Monoxide(CO) poisoning accident is higher than any other gas accident in the rate of deaths/incidents. In the last five years, 36 people died and 104 were wounded because of carbon monoxide poisoning accident. Most of these CO poisoning accidents were caused by defective exhaust tube in the old gas boiler and multi-use facility. In this study, the spread of incomplete combustion gas(CO) released from leakage hole of exhaust tube was analyzed by computational flow modeling and concentration measuring test. CO gas leaked form exhaust tube in a building was highest concentrated near the ceiling and formed the circular currents along the walls. Through these experiments and simulation, the reasonable installation location of carbon monoxide alarm was made certain and suggested.

  • PDF

Detection of Oscillatory Pattern Signals and its Application to the Fault Diagnosis of a Boiler Drum-Level Control System (Oscillatory 파형감지에 의한 보일러 플랜트 드럼수위 제어계통의 고장진단)

  • Kim, Jae-Hwa;Seo, Yeol-Kyu;Jang, Tae-Gyu
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.1
    • /
    • pp.44-51
    • /
    • 1999
  • This paper proposes a new approach of plant fault diagnosis which is based on detecting the characteristic pattern signals and associating them with the corresponding faults. The new approach does not require analytic modeling of the target system but best reflects the expertise embedded in the experienced human operation by mimicking them in a systematic way. This paper intends to illustrate the feasibility of the proposed by developing the algorithms to detect and estimate the typical characteristic pattern signals, I. e., oscillatory patterns, and applying them to the diagnosis of various faults of a 500MW boiler control system including tube rupture, feed-water leak, and controller failure.

  • PDF

A Design of Reference Model Following Fuzzy Control System for Boiler-Turbine Equipment (보일러-터빈 설비에 대한 기준모델 추종 퍼지 제어시스템의 설계)

  • 정호성;황창선;황현준
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.11 no.4
    • /
    • pp.82-91
    • /
    • 1997
  • In this paper, a design method of the boiler-turbine control system in the coal fired power plant is proposed. We need to control electric output and drum pressure and water level in drum to guarantee stable operation and save energy for generating electricity and decrease air pollution in the boiler-turbine system. This boiler-turbine control system is composed of reference model part and model following part. The multivariable boiler-turbine system is separated into 3 SISO(Single Input Single Output) systems applying the concept of relative gain matrix. Each 3 reference models for separated boiler-turbine system are composed of 1st order nominal plant and hysteresis integral control system and they make good dy¬namic response with no overshoot and fast rising time. Each fuzzy controller to follow as close as possible to the response of each reference model is designed. The robustness and the good tracking property can be achieved using 5150 fuzzy controllers when there are modeling errors, disturbances and parameter pertur¬bations. The effectiveness of the proposed design method is verified through simulations.

  • PDF

A Design of Model Following Optimal Multivariable BOiler-Turbine H_\infty Control System using Genetic Algorithm (유전 알고리즘을 이용한 모델 추종형 최적 다변수 보일러-터빈 H_\infty제어 시스템의 세계)

  • Hwang, Hyeon-Jun;Kim, Dong-Wan;Park, Jun-Ho;Hwang, Chang-Seon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.2
    • /
    • pp.127-135
    • /
    • 1999
  • Multivarialbe Boiler-Turbine H_\infty Control System Genetic Algorithm Weighting Functions $W_1$(s), $W_2$(s), and design parameter $\gamma$ that are given by Glover-Doyle algorithm, to optimally follow the output of reference model. The first method to do this is that the gains of weighting functions $W_1$(s), $W_2$(s), and design parameter are optimized simultaneously by genetic algorithm with the tournament method that can search more diversely, in the search domain which guarantees the robust stability of system. And the second method is that not only by genetic algorithm with the roulette-wheel method that can search more fast, in that search domain. The boiler-turbine H_\infty control system designed by theabove second method has not only the robust stability to a modeling error but also the the better command tracking preformance than those of the H_\infty control system designed by trial-and-error method and the above first method. Also, this boiler-turbine H_\infty control system has the better performance than that of the LQG/LTR contro lsystem. The effectiveness of this boiler-turbineH_\infty control system is verified by computer simulation.

  • PDF

Modeling of Combustion in Co-Generation / Industrial Boiler Furnace (열병합/산업용 보일러 화로에서의 연소 해석)

  • Kim, Byoung-Yun;Park, Pu-Min;Lee, Kyoung-Mo
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.842-846
    • /
    • 2001
  • Our company produces boilers for industrial usages or power plants. The aim of this study is to investigate the flame structure, heat transfer to evaporator tube wall and NOx emission in the furnaces. Also we are to derive correct FEGT(Furnace Exit Gas Temperature) characteristic curve. When we design furnace and superheater, economizer etc. FEGT characteristic curve is very important factor for optimum design. We calculated turbulent reacting flow, heat transfer and NOx emission in furnace by using numerical modeling with the help of commercial code. Three dimensional steady state calculation is done. k-e turbulence model and equilibrium chemistry combustion model with $\beta-probability$ density function is used. To calculate radiation heat transfer discrete ordinates model is used. And we measured FEGT at several operating plants. Measurement is done by R-type thermocouple. Radiation shield is attached to the thermocouple to prevent radiation effect. Measured and calculated results show good agreement. And we could understand the flame structure and NOx formation positions in each furnaces.

  • PDF

A Study on Thermal Power Plant Drum Boiler-Turbine System Modeling (화력 발전용 드럼 보일러-터빈 시스템의 모델링에 관한 연구)

  • Kim, Woo-Hun;Moon, Un-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1804-1805
    • /
    • 2011
  • In recent year there has been an increasing interest in the dynamic simulation of complex systems. This study uses a large-scale forty-seventh order fossil fuel power plant. Twenty-three state variables are associated with the physical processes and twenty-four state variables associated with the control system. The plant model is expected to predict all dominant effects in a steady and transient state. In this study, the power plant model is reorganized into four subsystems, each with its controller, and the four connected to each other through a manager, which is a fifth part to the system. The four parts of the unit are the boiler system, steam turbine system, condenser system, and feedwater system.

  • PDF

A Study on Air and Gas System of Coal Fired Power Plant (석탄화력발전소의 공기 및 가스시스템 모델에 관한 연구)

  • Jung, Hwan-Joo;Kim, Tae-Hyun;Ryoo, Young-Jae;Chang, Young-Hak;Moon, Chae-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.283-285
    • /
    • 2002
  • Boiler combustion systems are large, non-linear systems with numerous interactions between its component parts. In the analysis of such complex systems. dynamic simulation is recognized as a powerful method of keeping track of the myriad of interactions. This paper shows and discusses the developed analysis model, such as the forced draft fan the primary air fan, the furnace and burner system, pulverizer, air preheater and induced draft fan, etc. in accordance with BMCR condition of boiler using the Modular Modeling System(MMS) software.

  • PDF

Modeling for the Automation of Start-up Operation in Boiler Plant (보일러 플랜트의 Start-Up 운전자동화를 위한 모델링)

  • 윤영진;황규석
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.1
    • /
    • pp.60-70
    • /
    • 1997
  • Since, human error is a major factor contributing to disaster during start-up of operation in Boiler plant. it is necessary to develop an automation system which prevent mode of operation that are known to be dangerous and to bring a loss of energy. The aim of this study is to suggest a model for the computer-aided synthesis of operation sequence as a part of automation system for start-up operation. Synthesis is accomplished by the formation of a hierarchical network of goals which decide sequence of operations. Hierarchical Network is formed by using method which upper goals ( i.e. upper operation al situation) are classified by the function of themselves into lower goals (i.e. lower operational situation). Knowledge for deciding operation sequence is generated by putting In order the knowledge of hazard operation and energy management.

  • PDF

Development of 3MWth Circulating Fluidized Bed Biomass Gasifier (3MWth급 순환유동층 바이오매스 가스화공정 개발)

  • Lee, Jeungwoo;Song, Jaehun;Lee, Dongyoon;Choi, Youngtai;Yang, Won;Lee, Uendo
    • 한국연소학회:학술대회논문집
    • /
    • 2012.04a
    • /
    • pp.231-233
    • /
    • 2012
  • Circulating Fluidized Bed (CFB) is a technically and economically proven technology for boiler systems and large CFB coal boilers are making inroads into the domestic power boiler market. For biomass gasification, it is also considered as a very promising technology for commercial. Due to the lack of experiences of a large scale CFB gasifier, however, any large scale CFB gasifiers are hard to in Korea in spite of fast-growing demand of domestic market. In this study, a 3 $MW_{th}$ CFB gasifier was developed for biomass gasification. The CFB gasifier consists of interconnected fast and bubbling fluidized bed reactors including unique features for in-situ tar removal. Various numerical and experimental approaches will be presented such as basic modeling works, investigation of hydrodynamics with a cold model, computational particle fluid dynamics and experiments in the 3 MWth gasifier.

  • PDF