Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

BEST PRACTICES FOR JOINT VENTURES: ISSUES AND CRITICAL SUCCESS FACTORS

  • Rizwan U. Farooqui;Syed M. Ahmed;Dilshad Umer
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.369-374
    • /
    • 2009
  • Project-based joint ventures are often used in the construction industry to assemble an organization that meets a client's project needs and matches or exceeds the capacities of competitors. The joint venture / partnerships provides the means for a firm to quickly add resource, political, technical, or other required strengths that will increase project acquisition. This paper sets out to study the types of joint ventures, different issues or problems while having joint ventures and the critical factors that contribute to successful joint ventures. A questionnaire was designed and administered to survey the issues and present practices of joint ventures in the South Florida construction industry. Along with the questionnaire, personnel interviews were also conducted to get first hand knowledge about the subject matter. The results are presented in the paper. These results specifically identify the overall practice of joint ventures in South Florida as well as indicate the most significant factors leading to failure or success of these ventures.

  • PDF

Study on Flight Test Safety Management Operations and Processes (국내 비행종합시험을 위한 비행시험 및 안전관리 운영·절차에 관한 연구)

  • Mok, Jihyun;Lee, Kyelim;Ko, Sangho
    • Journal of Aerospace System Engineering
    • /
    • v.11 no.3
    • /
    • pp.31-38
    • /
    • 2017
  • As demand for best practices relative to flight test safety management operations and processes in the aviation industry grows, standards for such aspects of the industry in Korea should be examined. Therefore, in this paper, we conducted flight test operation processes and safety management program development studies based on documents related to flight tests of the Korean civil aviation KC-100, the military aircraft T-50, the FAA (Federal Aviation Administration), and CAAC (Civil Aviation Administration of China) for performance validation, test evaluation and safety certification for aircraft under development and remodeling. In addition, we introduced and analyzed best practices of the FTSC (Flight Test Safety Committee) applicable to aircraft flight test processes.

Investigating the Impact of Best Management Practices on Nonpoint Source Pollution from Agricultural Lands

  • ;Saied Mostaghimi
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.32 no.E
    • /
    • pp.1-19
    • /
    • 1990
  • Abstract Over the last several decades, crop production in the United States increased largely due to the extensive use of animal waste and fertilizers as plant nutrient supplements, and pesticides for crops pests and weed control. Without the application of animal waste best management, the use of animal waste can result in nonpoint source pollution from agricultural land area. In order to increase nutrient levels and decrease contamination from agricultural lands, nonpoint source pollution is responsible for water quality degradation. Nonpoint source pollutants such as animal waste, ferilizers, and pesticides are transported primarily through runoff from agricultural areas. Nutrients, primarily nitrogen and phosphorus, can be a major water quality problem because they cause eutrophic algae growth. In 1985, it was presented that Watershed/Water Quality Monitoring for Evaluation BMP Effectiveness was implemented for Nomini Creek Watershed, located in Westmoreland County, Virginia. The watershed is predominantly agricultural and has an aerial extent of 1505 ha of land, with 43% under cropland, 54% under woodland, and 3% as homestead and roads. Rainfall data was collected at the watershed from raingages located at sites PNI through PN 7. Streams at stations QN I and QN2 were being measured with V-notch weirs. Water levels at the stream was measured using an FW-l Belfort (Friez FWl). The water quality monitoring system was designed to provide comprehensive assessment of the quality of storm runoff and baseflow as influenced by changes in landuse, agronomic, and cultural practices ill the watershed. As this study was concerned with the Nomini Creek Watershed, the separation of storm runoff and baseflow measured at QNI and QN2 was given by the master depletion curve method, and the loadings of baseflow and storm runoff for TN (Total Nitrogen) and TP (Total Phosphorus) were analyzed from 1987 through 1989. The results were studied for the best management practices to reduce contamination and loss of nutrients, (e.g., total nitrogen and total phosphorus) by nonpoint source pollution from agricultural lands.

  • PDF

Review of Uncertainties in Applying GIS Data and Hydrological Models to Evaluate the Effectiveness of Best Management Practices (수리모델과 GIS 데이터를 이용한 최적관리방안의 평가에 대한 불확실성의 재고)

  • Lee, Tae-Soo
    • Journal of the Korean association of regional geographers
    • /
    • v.17 no.2
    • /
    • pp.245-258
    • /
    • 2011
  • Best management practices (BMPs) are widely accepted and implemented as a mitigation method for soil erosion and non-point source problems. Estimating the amount of soil erosion and the effectiveness of BMPs using hydrological models help to understand the condition, identify the problems, and make plans for conservation practices in an area, typically a watershed. However, the accuracy and reliability of assessment of BMP impacts estimated by hydrological models can be often questionable due to the uncertainties from various sources including GIS(Geographic Information System) data, scale, and model. This study reviewed the development and the background of hydrological models, and the modeling issues such as the selection of models, scale, and uncertainties of data and models. This study also discussed the advantage of a small scale and spatially distributed model to estimate the impacts of BMPs.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Successful ERP Implementation Model : Exploratory Model from Ernst & Young PER (Package Enabled Reengineering) and Change Management Methodology (성공적 ERP구축 모델 : Ernst & Young의 PER(Package Enabled Reengineering) 방법론과 변화관리 방법론을 중심으로 한 탐색적 모델)

  • An, Joon-Mo;Park, Dong-Bae
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.59-70
    • /
    • 1998
  • According to the Gartner Group, the market for ERP software in Korea is growing rapidly. However, the number of successful ERP implementations is quite few. Standard(unmodified) ERP's are built based on best practices. Improvements expected from successful implementation are based on best practices built into the software. Many improvements are lost through modification to "standard" software. Even minor changes in software can significantly reduce benefits. Both implementation time and risk factors are increased with modifications. We introduce a methodology, called package Enable Re-engineering (PER) and the main components of change management program by Ernst & Young. "To-Be" model could be developed through the software capabilities. And change management processes such as continuous education and self-developments are required. The philosophy of the change management processes is to let the software package drive the re-engineering practices and avoid moving the software toward the "As-IS" process. Extensive top management involvement, major focus on speed, extensive communication program, and "clear" picture of the future are essential components of change management. We are sure that the complied experiences and model have implications for practice and for academicians for their endeavors in their fields.

  • PDF

Construction Based Model for Assessing Maturity Level of Enterprises

  • Marzouk, Mohamed;Attia, Tarek;El-Bendary, Nasr Eldin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.14-19
    • /
    • 2012
  • Maturity models allow organizations to assess and compare their own practices against best practices or those employed by competitors, with the intention to map out a structured path to improvement. This research explores the aspects of the Maturity Models that are relevant to distinguish them from one to another. The different Project Management maturity models for define maturity differently and measure different things to determine maturity. Because of this, organizations should give careful consideration to select appropriate maturity model. The main reason behind this research lies on the modification to the existing Organizational Project Management Maturity Model (OPM3) by adding four knowledge areas, dedicated to construction industry as best practices. These are Safety, Environment, Financial and Claim Management. This Model contains (Yes/No) questions; all of these questions must be answered before the user reviews the results that describe the overall maturity and areas of strength and weakness of an organization. The research presents the implementation of the proposed Model Construction Enterprises Maturity Model (CEM2). All the components of the developed Model have been implemented in Microsoft Access. CEM2 helps Construction Enterprises to assess their Maturity Level and know Areas of Weaknesses for future improvement. The easy to use Yes/No user interfaces help enterprises' employees to assess the maturity level of their enterprises. The Model maintains users' responses in its database; as such, many employees from different enterprise divisions can be involved during assessment phase in several sessions.