• Title/Summary/Keyword: Benefit-Cost analysis

Search Result 959, Processing Time 0.026 seconds

Estimation of Environmental Costs Based on Size of Oil Tanker Involved in Accident using Neural Network (신경망을 이용한 유조선 기름 유출사고에 따른 환경비용 추정에 관한 연구)

  • Shin, Sung-Chul;Bae, Jeong-Hoon;Kim, Hyun-Soo;Kim, Seong-Hoon;Kim, Soo-Young;Lee, Jong-Kap
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.1
    • /
    • pp.60-63
    • /
    • 2012
  • The accident risks in the marine environment are increasing because of the tendency to build faster and larger ships. To secure ship safety, risk-based ship design (RBSD) was recently suggested based on a formal safety assessment (FSA). In the process of RBSD, a ship designer decides which risk reduction option is most cost-effective in the design stage using a cost-benefit analysis (CBA). There are three dimensions of risk in this CBA: fatality, environment, and asset. In this paper, we present an approach to estimate the environmental costs based on the size of an oil tanker involved in an accident using a neural network. An appropriate neural network model is suggested for the estimation,and the neural network is trained using IOPCF data. Finally,the learned neural network is compared with the cost regression equation by IMO MEPC 62/WP.13 (2011).

Theory and Methods for the Evaluation of Environmental Resources (환경자원의 가치평가 이론과 주요 방법)

  • Kim, Joon-Soon
    • Journal of Forest and Environmental Science
    • /
    • v.19 no.1
    • /
    • pp.108-123
    • /
    • 2003
  • The importance of environmental resources has been recognized over the world after Rio declaration(1992). so it is moved to monetarize environmental resources. The studies on the evaluation of nonmarket goods began also in the early 1990 in Korea. In practice the preliminary feasibility studies(PFS) are carried out since 1999 in case of major public investments projects. In PFS the Benefit-Cost analysis is practically used. which is considering the evaluation of environmental resources. But the methods for the evaluation have not been fixed up. In this study It is introduced to the theory and major methods for the evaluation of environmental resources. In the theory the evaluation is handled in aspect of demand function and supply function. The optimum level can be extracted from the two functions. In the method. travel cost method(TCM), hedonic price method(HPM) and contingent valuation method(CVM) are introduced according to the market structures.

  • PDF

Therapeutic lumbar facet joint nerve blocks in the treatment of chronic low back pain: cost utility analysis based on a randomized controlled trial

  • Manchikanti, Laxmaiah;Pampati, Vidyasagar;Kaye, Alan D.;Hirsch, Joshua A.
    • The Korean Journal of Pain
    • /
    • v.31 no.1
    • /
    • pp.27-38
    • /
    • 2018
  • Background: Related to escalating health care costs and the questionable effectiveness of multiple interventions including lumbar facet joint interventions, cost effectiveness or cost utility analysis has become the cornerstone of evidence-based medicine influencing coverage decisions. Methods: Cost utility of therapeutic lumbar facet joint nerve blocks in managing chronic low back pain was performed utilizing data from a randomized, double-blind, controlled trial with a 2-year follow-up, with direct payment data from 2016. Based on the data from surgical interventions, utilizing the lowest proportion of direct procedural costs of 60%, total cost utility per quality adjusted life year (QALY) was determined by multiplying the derived direct cost at 1.67. Results: Patients in this trial on average received $5.6{\pm}2.6$ procedures over a period of 2 years, with average relief over a period of 2 years of $82.8{\pm}29.6$ weeks with $19{\pm}18.77$ weeks of improvement per procedure. Procedural cost for one-year improvement in quality of life showed USD $2,654.08. Estimated total costs, including indirect costs and drugs with multiplication of direct costs at 1.67, showed a cost of USD $4,432 per QALY. Conclusions: The analysis of therapeutic lumbar facet joint nerve blocks in the treatment of chronic low back pain shows clinical effectiveness and cost utility at USD $2,654.08 for the direct costs of the procedures, and USD $4,432 for the estimated overall cost per one year of QALY, in chronic persistent low back pain non-responsive to conservative management.

Establishing the Method of Risk Assessment Analysis for Prevention of Marine Accidents Based on Human Factors: Application to Safe Evacuation System

  • Fukuchi, Nobuyoshi;Shinoda, Takeshi
    • Journal of Ship and Ocean Technology
    • /
    • v.4 no.4
    • /
    • pp.19-33
    • /
    • 2000
  • For the prevention of marine accidents based on human factor, the risk assessment analysis procedure is proposed which consists of (1) the structural analysis of marine accident, (2) the estimation of incidence probability based on the Fault Tree analysis, (3) the prediction of ef-fectiveness to reduced the accident risk by suitable countermeasures in the specified functional system, and (4) the risk assessment by means of minimizing of the total cost expectation and the background risk. As a practical example, the risk assessment analysis for preventing is investigated using the proposed method.

  • PDF

A Study on Application Methods to Economic Impact Analysis on R&D of Geoscience and Mineral Resources in Input-Output-Outcome Perspective (연구성과(outcome) 관점에서 지질지원 분야 연구개발의 경제적 파급효과 분석 방법론 적용)

  • Ahn, Eun-Young;Kim, Seong-Yong
    • Economic and Environmental Geology
    • /
    • v.39 no.6 s.181
    • /
    • pp.787-801
    • /
    • 2006
  • Focused in the characteristic of R&D on Geoscience and Mineral Resources as basic research area, we survey on methods of public works' economic impact analysis including cost-benefit analysis and resent technology evaluation methods and suggest apply-methods to conduct economic impact analysis on R&D of geoscience and mineral resources. To conduct economic impact analysis on the basic research area, it need to identification research's out-come not just output. In this perspective, we propose a method, Input-Output-Outcome Roadmapping to identify the outcome of R&D and show the relation of input, output, and outcome of R&D. Furthermore, noticing the different effects of R&D from public works, we directly evaluate the use-value of the academic theory or geological maps through Contingent Valuation Method(CVM) and others developed as evaluation methods on environmental goods. In indirect application methods, it can evaluate the partial of the pubic works' benefit with assuming R&D factors if R&D is a part of public works. If not, we evaluate the R&D's value as reductions of costs or additions of benefit with finding related public works.

A Benefit-Cost Analysis on the DSM Programs (DSM 프로그램의 비용효과 분석)

  • 오영진;김발호;박종배
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.9
    • /
    • pp.535-541
    • /
    • 2003
  • Demand Side Management (DSM) activities have been designed to encourage customers to modify their patterns of electricity consumption including the timing and level of electricity demand. The role of DSM has been more and more important in the point of social energy utilization on the limited resources. The objectives of DSM are generally related to load reductions and generation cost savings. This paper presents an approach to B/C analysis to evaluate the impact of DSM programs especially on the strategic conservation and the load management programs. The proposed approach embedding the existing B/C analyses is applicable to the new electricity market. Case studies show the B/C ratio and the avoided cost due to the impact of DSM programs.

The Value Assessment for Indirect Benefits of Road Project Using Contingent Valuation Method (조건부가치측정법을 이용한 도로사업의 간접편익 추정)

  • Kim, Kyong Ju;Kang, Ki Yong;Kim, Kyoungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.61-70
    • /
    • 2010
  • In case of low benefit project with low traffic or high-priced project, existing analysis of cost and benefit tends to present a low feasibility. However, considering the improvement of environment, intensification of disaster prevention, public stability of countryside area and formation of good scenery, these projects can have a feasibility. This paper analyzes and summarizes the indirect benefit of some ripple effects, caused by road projects, and presents the methodology and process in order to change the indirect benefit into monetary value.

An Application of Fault Tree Analysis in Industrial Safety System (산업 안전시스템에 있어서 Fault Tree Analysis의 적용)

  • 김진규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.43-50
    • /
    • 1990
  • Fault tree analysis(FTA) is available to the engineer for determining reliability of complex industrial safety system. Therefore quantitative aspects of FTA greatly multiply its power this paper proceeds of presenting the methodology of FTA, including an approach to constructing in fault tree. A working guide to the use of FTA for the purpose of cost/benefit determination in industrial safety system is given. Finally, an analytic method for uncertainty analysis of the top event of a complex system is described.

  • PDF

A Study on the Feasibility Analysis of Large Scale Research Project (대규모 연구 프로젝트 타당성 분석에 관한 연구)

  • Lee, Hong-Cheol;Hwang, In-Ju;Kim, Tae-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Nowadays national research and development fund is continuously increased. And the evaluation on the feasibility of R&D budget investment was carried out. Through this study it was possible that a business feasibility evaluation of large scale research project. Also the benefit of research project about large scale plant(A plant) is $2.67{\sim}3.76$ times of research funds, and the R&D fund pay-back period is $6{\sim}8$ years. And also there is employment effect as $1,200{\sim}2,200$ every year, and $22,000{\sim}35,000$ within 20 years after research project.

  • PDF

An Economic Evaluation Study of Office Remodeling and Green-remodeling Projects : A Simulation Approach to a Rental Office in GBD, Seoul (생애주기를 고려한 오피스 건물의 리모델링과 그린리모델링의 경제성 평가 연구 : 서울시 강남업무지구의 임대오피스 사례)

  • Lee, Seong-Ho;Lee, Jae-Su
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.23-34
    • /
    • 2018
  • Due to a waste of energy in korea, about 525,000 which are 75 percent of total buildings are at least 15 years old buildings that need remodeling. There are two current remodeling systems. One is a remodeling system to reduce a waste of resources from the reconstruction. The other is a green-remodeling system aimed to energy savings and reducing environmental costs. This study is to analyze quantitatively these current systems with respect to the cost-benefit caused by the life cycle and suggests the political and institutional implications through the interpretation of the results. For a quantitative analysis, we analyzed reducing maintenance costs and rent benefits with simulation by using opportunity costs, construction costs, plan costs and supervision costs as expense variables and using the reduced floor area ratio, institutional incentives, energy, water resources and certified emission reduction(CER) as benefit variables. As a result of the empirical study, the green-modeling was more beneficial in the field of environment such as the energy savings, however, the final benefits of remodeling which has no green building certification costs but more floor area ratio incentives were more economical. The green-remodeling system focused on reducing environmental costs and energy savings needs a equatable institutional incentive system.