• Title/Summary/Keyword: Benefit Estimation

Search Result 235, Processing Time 0.022 seconds

Economic Value Estimation of Public Design Facility for Children Using Contingent Valuation Method (조건부가치측정법을 이용한 어린이 공공디자인 시설의 경제적 가치 추정)

  • Moon, Kwang-Min;Yoon, Sung-Il
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.3
    • /
    • pp.532-541
    • /
    • 2017
  • Design is an extremely critical and important for the prosperity and development of a corporation, and design for children's facilities can be said to be a critical factor not only from a commercial perspective but also one of the critical factors that can be beneficial to the physical, intellectual and emotional growth and development of children. To measure the economic value of publicly designed children's facilities established with the purpose of children's design education, this research study utilized the Contingent Valuation Method. This research study attempts to provide useful information for policy administrators on the usage of both publicly designed children's facilities with high use value and also high non-use value through economic value measurement. To achieve the objectives of this research, the Contingent Valuation Method that utilized both open-ended questions and also double-bounded dichotomous choice methodologies was used. The results of the pre-verification that used the open-ended questions results from 50 test subject participants and the double-bounded dichotomous choice methodology results from 530 test subject participants confirmed that the average annual per person expense was estimated to be KRW 12,463. The gross benefit amount figure estimated for all households in the nation was estimated to be about KRW 219 billion annually.

The study on DC-link Film Capacitor in 3 Phase Inverter System for the Consideration of Frequency Response (3상 인버터 시스템에서 주파수 특성을 고려한 필름 콘덴서의 DC-link 적용 방법에 관한 연구)

  • Park, Hyun-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.117-122
    • /
    • 2018
  • A large-capacity three-phase system air conditioner recently includes an inverter circuit to reduce power consumption. The inverter circuit uses a DC voltage that comes from DC-link power capacitor with the function of rectifying, which means AC voltage to DC voltage using a diode. An electrolytic capacitor is generally used to satisfy the voltage ripple and current ripple conditions of a DC-link power capacitor used for rectifying. Reducing the capacitance of the capacitor decreases the size, weight, and cost of the circuit. This paper proposes an algorithm to reduce the input ripple current by combining the minimum point estimation phase locked loop (PLL) phase control and the average voltage d axis current control technique. When this algorithm was used, the input ripple current decreased by almost 90%. The current ripple of the DC-link capacitor decreased due to the decrease in input ripple current. The capacitor capacity can be reduced but the electrolytic capacitor has a heat generation problem and life-time limitations because of its large equivalent series resistance (ESR). This paper proposes a method to select a film capacitor considering the current ripple at DC-link stage instead of an electrolytic capacitor. The capacitance was selected considering the voltage limitation, RMS (Root Mean Square) current capacity, and RMS current frequency analysis. A $1680{\mu}F$ electrolytic capacitor can be reduced to a $20{\mu}F$ film capacitor, which has the benefit of size, weight and cost. These results were verified by motor operation.

Estimation and Application of the Value of Travel Time by Time Period: A Case Study of Downtown Highway Expansion Project (시간대별 통행시간가치 추정 및 적용: 도심부 도로 확장 사업 사례연구를 중심으로)

  • Lee, Jae-Young;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.7-15
    • /
    • 2011
  • The travel time value is important factor for the evaluation of feasibility the transportation facility investment. The existing method for calculation of the travel time for each mode uses daily average trip purpose. So the value of travel time is constant because it is estimated with only daily average proportion. This daily constant time value can distort the results of future demands of toll roads or economic appraisals for the projects. The proportion of the trip purpose varies by time periods. Accordingly the value of travel time also varies by time periods. In this study, times periods are classified as morning peak, evening peak, business time off-peak, and non-business time off-peak. And trip purpose proportions are sorted by each time period from raw data of Seoul household trip study, then the value of travel time for each time period is estimated with these sorted purpose proportions. A case study of Seoul Jung-gu and Yongsan-gu performed with newly estimated time value by time periods. The result of benefit calculation with the daily constant time value is overestimated approximately annual 2.5 billion Won compared by time values by time periods. The demands of toll roads are also overestimated with the existing daily constant time value by daily 3,500 vehicles and total revenue of toll roads are overestimated by annually 1 billion Won. In conclusion, the value of travel time by each time period enables the more precise economic evaluation of the transportation facility investment projects, mode choice behavior, and route choice behavior especially for toll roads.

Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis (경제성분석에 의한 소수력 개발의 최적규모 결정 방안)

  • Kim, Kil-Ho;Yi, Choong-Sung;Lee, Jin-Hee;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.995-1005
    • /
    • 2007
  • This study presents a framework for optimum scale determination for small hydropower development in a river basin. The framework includes the construction of hydrology and topography data, the simulation of hydropower operation, the economic analysis, and the determination of optimum scale of the small hydropower. The optimum scale of design flow and facility are determined by Net Present Value among economic analysis indices. The investment cost is estimated by the cost function derived from the construction cost of existing small hydropower plants. The benefit from power generation is estimated by the price announced by government. The presented framework is applied to the two potential sites in Cho River basin for the dam and run-of-river type of plants. Finally, the sensitivity analysis for a design flow and scale of the plant is performed for the each site. The usage of the framework presented in the study is highly expected for the estimation of potential hydropower resources or the decision support tool for a proprietor by estimating the optimum scale and economical feasibility in advance.

Estimation of Operating Cost and Efficiency of the Introduction of Urban Subway (대중교통 운영비용계수 추정 및 도시철도 도입 효율성 검토)

  • Park, Jun-Sik;Oh, Dong-Kyu;Kho, Seung-Young
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.6
    • /
    • pp.113-122
    • /
    • 2008
  • This study extended Park et al.(2007c), which analyzed the efficiency of a hierarchical transit network, showed the result of a real data, and analyzed its applicability. Operating cost was estimated using a model which was established in this study, and minimum transit demand was derived from the operating cost. The minimum transit demand value is just a sample calculation, thus it varies by many inside and outside factors of the model. Looking at the inside of the model, operating cost and travel speed are major factors, and the possibility of introducing urban subway becomes high when the operating cost of the transit system is low and its travel speed is high. As far as the outside factors are concerned, according to the analysis on the network structure, transit demand, and transit mode share, the minimum transit demand value which was derived in this study will be the maximum value among the possible values. In the feasibility study, the benefit is likely to be overestimated and the cost is likely to be underestimated than those of this study. It could be concluded that the methodology of a feasibility study is appropriate in the field standard. This study analyzed the efficiency of introduction of urban subway using analytical approach, thus has many shortcomings and limitations. However the practical approach, like feasibility study, has some limitations as well. This study could be a basis on establishing an analysis framework that is more accurate and reasonable by comparing analytical approach and practical approach.

Estimation of the Shadow Price of Carbon Dioxide Emissions, the Potential Reduction, and Substitution Possibility for fuels in the Chinese Fossil-fueled Power Generation Sector (중국 화력발전산업의 CO2 암묵가격 및 잠재감축량, 연료에 대한 대체가능성 분석)

  • Jin, Yingmei;Lee, Myunghun
    • Environmental and Resource Economics Review
    • /
    • v.22 no.1
    • /
    • pp.77-98
    • /
    • 2013
  • China, the world's largest $CO_2$ producer, is likely to be obligated to reduce greenhouse gas emissions under the post-Kyoto protocol. This paper estimates a Shephard input distance function for the Chinese fossil-fueled power generation sector to measure the shadow price of $CO_2$ emissions, technical efficiency, and indirect Morishima elasticities of substitution between inputs. Empirical results show that, on average, it costs approximately 3.2 US dollars per year to reduce $CO_2$ emissions by one ton over the period 1981-2009. This finding indicates that Chinese power sector is expected to benefit from selling emission permits to other countries such as Korea and Japan, given that our estimate for China is lower than the ones previous literatures estimated for the power sector in these countries. The maximum attainable average $CO_2$ reduction potential amounts to approximately 25 million tons per year by improving technical efficiency. Capital is substitutable with both coal and oil and capital is relatively more readily substituted for these fuels.

Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D (2D기반 기존방법 대비 BIM기반 터널 물량산출 오차 분석)

  • Shin, Jae-Choul;Baek, Yeong-In;Park, Won-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.8
    • /
    • pp.63-71
    • /
    • 2011
  • In case of applying BIM method to the civil engineering of irregularly shaped structure, BIM method is recognized to have relatively high construction productivity. In this paper, we developed quantity calculation algorithms applying BIM method to NATM tunnel construction method and implemented BIM based 3D-BIM Modeling Quantity Calculation. The results showed that BIM-based method has high reliabilty in structure work in which errors occurred only in the range between 0.00% and -1.45%. On the other hand, BIM method applied to earth work showed great error range of -19.78% to 35.30%. So the benefit and applicability of BIM method in civil engineering were confirmed. In addition, routine method for the quantity of earth work has negligible error as in the case of structure work. But, rock type's quantity calculation showed significant errors so that the reliability of 2D-based volume calculation is problematic. It may thus be concluded that 3D-BIM is more reliable than the routine method in estimating the quantity of earth work. Considering the reliability and merits in the stage of its design, construction and maintenance levels, the application of BIM to civil engineering works is recommended.

Research on the Function and Economic Effect of Technology Opportunity Development System (기술기회발굴시스템의 기능 및 경제적 효과에 관한 연구)

  • Lee, Woo-Sung;Kim, Kang-Hoe;Coh, Byoung-Youl
    • Journal of Korea Technology Innovation Society
    • /
    • v.14 no.spc
    • /
    • pp.1096-1127
    • /
    • 2011
  • This research focus on estimating the economic effects of TOD system development from the perspective of new market creation, R&D planning cost reduction and increase of R&D projects' commercialization success rates. The research is conducted through simulation and scenario analysis with assumptions about economic effect parameters. Scenario analysis shows that scenario 1 (the application ratio of the new TOD system to total Korean R&D programs' planning is 1.4%) results in total economic effects, 921.3 billion won in 2011 price with B/C ratio 6.15, that scenario 2 (the application ratio is 1.9%) results in total economic effects, 1,250.3 billion won in 2011 price with B/C ratio 8.34, and that scenario 3 (the application ratio is 0.9%) results in total economic effects, 592.2 billion won in 2011 price with B/C ratio 3.95. The research contributed to the prior evaluation of economic validity of "R&D on Technology Opportunity Development (TOD) system" and to cultivating the new methodology of economic benefit estimation in the area of R&D on system development.

  • PDF

Estimation of Post Evaluation Index of Natural Disaster Prevention Projects using Structure Equation Modeling (구조방정식모델을 이용한 자연재해예방사업의 사후 평가 지수 산정)

  • Heo, Bo Young;Song, Jai Woo;Yoon, Sei Eui;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1807-1814
    • /
    • 2014
  • Natural disaster has been hard to prevent the occurrence of itself, thus in order to reduce the economic damages and loss casualties, it is important to be prepared in cases that the disasters should occur in advance. Interest of the related project to prevent various natural disasters has been grown along with an investment in Korea. Along with this movement, when investments related to natural disaster prevention projects were built on, the post evaluation that can verify the ripple effects of those investments on the community should be emerging as an essential task. For evaluating the effects of public investment projects such as natural disaster prevention projects in this study, the related researches would continue through qualitative analyses, for example, cost-benefit analysis. Even the qualitative analysis alone cannot fully explain the effects of those projects, the diverse methods of analyzing and evaluating those effects might not have been presented in those fields. For the post evaluation of natural disaster prevention projects through the qualitative analysis, this study derived subjects that had effects on the post evaluation of natural disaster prevention projects. Also, employing the structural equation modeling (SEM), the causation between post evaluation subjects and the effects of projects were quantitatively analyzed, and the weighting factors of evaluation items were calculated respectively. Based on these results, post evaluation index formula was proposed for the natural disaster prevention projects in Korea.

The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique (자산관리 기법을 적용한 주차장 리모델링 대안평가 기법 개발)

  • Yu, Yongsin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.52-62
    • /
    • 2017
  • The purpose of this study is to develope an assessment method for parking lot remodeling alternative by adopting the asset management technique. In order to identify the Level of Service(LOS) and the Evaluation Measurement(EM), literatures was implemented which documented the consideration of parking lot plan, needs of the apartments' tenant, and various design standards. In addition, the authors conducted a three-time delphi survey for the identified 5 LOS and 19 EM to evaluate suitability and necessity of them and to collect additional opinion of experts. The LOS of parking lot were categorized into 5 areas such as Environmental effect and Convenience, Accessibility and so on. The 19 EM were determined to estimate the LOS quantitatively. The researchers analyzed the degree of importance of LOS and EM by using the Analytic Hierarchy Process (AHP) method. But construction cost was excepted from the analysis, because it is used as an independent variable in alternative assessment. In conclusion, the authors proposed the estimation criteria for EM, and the method and process for alternative assessment be performed to benefit-cost analysis using the LOS variation and construction cost. The assessment method for parking lot remodeling alternative was demonstrated effective to assess the parking lot remodeling alternative by case-study. This study has a academic significance by adopting the asset management techniques in the area of the parking lot remodeling. And the assessment method is expected to help deciding a reasonable remodeling alternative of parking lot, as it ensures the diversity for remodeling of the parking lot and reflects the needs of the occupant.