BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

BIM 기반 물량산출 자동화를 위한 콘크리트와 거푸집 공사의 사례분석 (The case study of BIM-based quantity take-off for concrete and formwork)

  • 전기현;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.13-17
    • /
    • 2011
  • 최근 설계사무소의 단가 및 설계 생산성이 계속 낮아지면서 3차원 설계에 대한 관심이 사회적으로 높아졌다. 설계사무소의 영역을 넘어 건설사회의 설계팀에서 기획설계 및 건설현장의 시공검토용으로 BIM이 활용되기 시작하면서 많은 성공사례가 나오기 시작하였다. 그래서 근래 각광 받고 있는 BIM의 견적 활용성에 대하여 알아보고자 기본적인 콘크리트 량과 거푸집 량을 일반 2D 기반의 방식으로 물량을 산출하고, 3차원 캐드를 통해서도 같은 내용의 물량을 산출하여 BIM 견적의 활용성과 그 정확도를 검토하고 문제점들을 분석하여서 BIM의 효율성을 높이는 방법을 연구한다.

BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구 (Quantity Takeoff for Non-Selection Work Items based on BIM)

  • 박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

실무 기반 건축공사 물량산출 교육용 컨텐츠 개선 방안에 관한 연구 (A Study on the Improvement of Practice-based Construction Quantity Takeoff Educational Contents)

  • 박지환;최창훈;한충희;이준복
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.217-218
    • /
    • 2015
  • There are various standards and manuals on the quantity takeoff for construction estimation. However, a lot of time and money has been spent on retraining because of difference between practice and education. Therefore, the main purpose of this paper is to suggest improvement to analyze problems and limitations of the existing educational content for quantity takeoff. In order to achieve research objective, comparative analysis for quantity takeoff contents is carried out. This study will be extended to assist in effective quantity takeoff in building projects by supplementing the existing issues with quantity takeoff contents and developing a BIM-based quantity takeoff multimedia contents that use diverse media to increase the understanding on the subject for a non-professional.

  • PDF

철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립 (BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures)

  • 주선우;김치경;김시욱;노준오
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.567-576
    • /
    • 2017
  • 본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.

BIM기반 가설공사 업무지원시스템 개발에 관한 연구 (A Study on Development of BIM-based Engineering Management System for Temporary Work)

  • 최창훈;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제21권1호
    • /
    • pp.61-69
    • /
    • 2020
  • 건설 프로젝트d의 대형화, 복잡화, 다양화로 인해 건설공사에서 발생되는 정보의 양이 기하급수적으로 증가하고 있다. 이에 설계 및 시공 검토가 현장 성공 여부에 치명적인 영향을 미치고 있다는 사실을 인지하고, 이를 위한 다양한 노력들이 학계와 산업에서 활발하게 이뤄져 왔다. 설계, 계획 및 유지관리 등 건설 전 단계에서 BIM의 활용은 늘어나고 있는 추세이고, 현재 건설 산업에서 사용되는 표준 중의 하나로 받아들여지고 있다. 하지만 가시설물을 위한 전문화된 소프트웨어가 없을 뿐만 아니라 전문적인 기술자가 절대적으로 부족하여 BIM기반 가설공사 설계는 2D 설계를 완료한 후 3D로 형상화하여 보조수단으로 활용된다. 이에 본 연구에서는 BIM기반 가시설물 설계 및 물량산출, 현장점검 업무의 인간적인 실수(Human error)를 최소화하고 업무시간을 단축할 수 있도록 하여 업무 효율을 높일 수 있는 BIM기반 업무지원시스템을 개발하고자 한다.

BIM기반 물량산출 완성도 측정을 위한 지수 개발 (An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off)

  • 이창희;김성아;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.79-92
    • /
    • 2011
  • 건설 프로젝트에서 물량 산출은 공사비를 결정하는 중요한 요소로 정확성과 신뢰성이 요구된다. BIM 데이터로부터 물량정보의 추출은 물량산출을 매우 정확하고 신속하게 수행할 수 있다는 점에서 매우 매력적이다. 하지만, BIM을 어떻게 구축하였는가에 따라 그 물량산출 결과가 매우 상이하게 나타날 수 있다. 프로젝트가 진행됨에 설계정보가 점점 더 구체화되기 때문에 BIM 모델의 완성도와 물량산출의 정확도 또한 높아질 것으로 기대할 수 있다. 하지만, 단계별로 공사비를 예측할 때 현 단계에서의 BIM data를 기반으로 한 물량산출의 정확도가 얼마 정도인지 평가하거나 예측할 수 있는 방법이 없기 때문에 그 결과물을 신뢰하기 어렵고 기존방식의 견적에 다시 의존하게 되는 문제가 발생할 수 있다. 따라서 본 연구에서는 BIM기반 물량산출에 영향을 미치는 요인을 도출하고, 이를 기반으로 BIM기반 물량산출 결과물의 완성도를 정량적으로 측정하고 예측할 수 있는 방법과 체계를 제시하는 것에 초점을 두고 있다. 본 연구에서 제시하는 측정체계와 지수는 약 6개의 파일럿 프로젝트 적용을 통해 그 측정결과의 일관성과 타당성이 검증되었다.

BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안 (Study for Architectural Standard Details Based On BIM Information Framework)

  • 권순호;이운재;조찬원
    • 한국CDE학회논문집
    • /
    • 제18권2호
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발 (Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments)

  • 최재웅;강전용;김현민
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.