BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city - (BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -)

  • Lee, Hae-Chan;Kim, Jin-Man;Choi, Cheol-Ho;Song, Sang-Hoon
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases (설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안)

  • Park, Bo Sung;Kim, Sean Hay
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Evaluation and Selection of Building Materials based on Life Cycle Cost Prediction (생애주기비용 예측 기반 건물재료 경제성 평가 및 선정)

  • Ahn, Junghwan;Lim, Jinkang;Oh, Minho;Lee, Jaewook
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.34-45
    • /
    • 2015
  • As buildings become larger and more complicated, construction costs have increased with a considerable effect on buildings' Life Cycle Cost (LCC). However, there has been little consideration on economic aspects in the selection of construction materials due to limited information on the materials and dependency in architects' experience and inefficiency in cost estimation, causing design changes, increase in maintenance cost, difficulty in budgeting, and decrease in building performance. To solve these problems, this study proposed a BIM-based material selection model which reflects the comprehensive economic efficiency of building materials. Our cost prediction model can estimates the material-related cost during the entire building life cycle. Furthermore, we implemented the proposed model in connection with BIM, which can analyze and compare LCC by material. Through the validation of the model, we could confirm the necessity of LCC-based material selection in comparison with the conventional cost-centered material selection.

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex - (복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -)

  • Kang, Shin-Yeop;Ahn, Jae-Hong;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.