• 제목/요약/키워드: BIM-Based Schedule Management

검색결과 35건 처리시간 0.023초

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

BIM정보를 활용한 강구조물의 공정 물량 통합관리 (Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information)

  • 김진욱;신태송
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

BIM기반 건설공사 일정관리를 위한 정보에 관한 연구 (A study on the Information for the Schedule Management of the Construction based BIM)

  • 박소현;송정화;오건수
    • 디지털콘텐츠학회 논문지
    • /
    • 제16권4호
    • /
    • pp.555-564
    • /
    • 2015
  • 최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.

공정리스크 관리를 위한 BIM 적용 방안 (BIM Utilization Plan for Schedule Risk Management)

  • 이계현;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안 (A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase)

  • 정준호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • 건설현장에서 정확한 진도를 관리하기 위해서는 비용정보와 일정정보를 결합한 통합정보가 요구되며 프로젝트의 성과측정을 위한 기초자료가 된다. 그러나 국내 건설공사는 비용과 일정정보를 각각 관리함으로써 객관적인 성과측정이 어려우며 내역서상의 물량을 액티비티에 분개하는 작업을 통해 생산성을 감소시킨다. 한편, BIM을 활용한 연구가 진행되면서 BIM을 통해 보다 효율적으로 진도관리하는 연구가 필요한 실정이며 현장에서는 일일 작업관리에 대한 필요성이 요구되고 있다. 이러한 건설 산업의 흐름에 따라 본 논문에서는 BIM 모델의 위치정보와 BIM기반의 견적데이터를 활용하여 3가지 타입의 진도관리단위를 생성하고 이를 통해 일일 진도율 및 일일 기성액을 파악하는 정보모텔을 제시하고자 한다.

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF

IFC활용 BIM기반 공정/원가 통합관리 프레임워크 (A Framework Integrating Cost and Schedule based on BIM using IFC)

  • 이진강;이현수;박문서;정민혁
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.53-64
    • /
    • 2013
  • 건설프로젝트 관리 과정에는 수많은 정보가 존재한다. BIM(Building Information Modelling)은 정보전달의 매개체로써 공정 및 원가 정보를 관리하여 4D(3D+Time), 5D(4D+Cost) 시뮬레이션 등 다양한 이익을 얻을 것으로 예상되었다. 그러나 BIM 활용과정에 따른 정보의 연계 문제, BIM 객체기반 공정/원가 정보의 한계, BIM 소프트웨어 호환성 문제 등으로 인해 BIM을 활용한 공정 및 원가정보의 관리는 적극적으로 활용되지 못하고 있다. 이에 본 연구에서는 위의 문제점들을 개선하고자 IFC(Industry Foundation Classes)활용 BIM기반 공정/원가 통합관리 프레임워크를 제안하였다. 먼저, 정보 입력 문제와 정보 표현의 한계점을 개선하기 위해 공간을 최소단위로 공정 및 원가정보를 통합 관리하는 데이터베이스를 구축하고, 데이터 호환성 문제를 해결하기 위해 국제 표준 데이터 포맷인 IFC를 활용하여 앞서 구축한 데이터베이스의 정보와 BIM 소프트웨어를 연계하여 BIM을 기반으로 한 공정/원가 정보의 통합관리를 시도하였다. 이는 BIM기반 공정/원가 통합관리를 위한 정보 처리 프로세스의 기초를 제공하며, 정보 요구에 대한 정확한 이해를 도와 의사소통의 정확성을 향상시켜 BIM기반 공정/원가관리의 효율성을 높일 것으로 예상된다.

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF