A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

Development of Rule for Quality Checking Items to Raise Quality of BIM Model -Focusing on the Domestic BIM Guidelines- (BIM 모델의 완성도를 높이기 위한 품질검토항목의 룰 개발 - 국내 BIM 지침을 중심으로 -)

  • Song, Jong-Kwan;Ju, Ki-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.131-143
    • /
    • 2013
  • There is the difference of criteria to apply guidelines among the project participants and to depend on the purpose of utilizing BIM models, although modeling criteria are basically provided through BIM guidelines. Therefore, it is quite important to check compliance with guidelines to raise quality of the BIM model. But Quality Checking (QC) items and method for BIM model modeled in accordance with guidelines is not provided. This study suggested QC items and Rule Specifications(RS) for automatic QC. First of all, QC items were derived by analyzing domestic BIM guidelines and a process for structuring natural language is conducted by utilizing flowchart and pseudocode. So, by combining them, RS was suggested. Finally, RS-based case study was conducted by implementing automatic QC process with solibri model checker$^{TM}$. This study will contribute to the improvement of design quality and completeness of BIM model including huge data of 3 dimension. Furthermore, it is necessary to develop BIM guidelines according to the use case and to provide detailed process and standard for QC of BIM model.

Application of Blockchain Technology to Verify Reliability of Life Cycle BIM Model for Civil Engineering Project (블록체인기술을 활용한 토목공사 생애주기 BIM 모델의 신뢰성 확보 방안)

  • Lee, Jaehee;Moon, Hyounseok;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.116-124
    • /
    • 2021
  • As the utilization of the BIM model increases in the design and construction stages of a construction project, the utilization of BIM in the maintenance stage can also increase. In the maintenance stage, BIM objects created in the design and construction stages that have already been completed are used. Therefore, it is necessary to verify the reliability of whether the used BIM object is a certified model created in the design stage. In particular, the reliability of the BIM model becomes more important in a project such as railway facilities composed of various construction activities with civil engineering, architecture, electricity, signal, and track work. This study proposes a methodology of using blockchain technology as a way to secure the reliability of the BIM model used in the maintenance phase, and constructs the block structure and detailed process for applying the blockchain technology to BIM. In addition, by applying this process to the BIM model of an actual facility to generate a block, it was confirmed that the blockchain technology can be used as a tool to secure the reliability of the BIM model.

Interaction between BIM Model and Physical Model During Conceptual Design Stage (설계 초기 단계에서 BIM 모델과 물리적 모델의 상호작용 방안)

  • Yi, Ingeun;Kim, Sung-Ah
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38C no.4
    • /
    • pp.344-350
    • /
    • 2013
  • It is essential to consider geometry in the early design stage for rational design decisions. However, a crucial decision had been taken by conversation, physical model, and gesture rather than BIM mode which can analyze geometry efficiently. This research proposes the framework of interaction between BIM model and physical model for real-time BIM analysis. Through this real-time system framework of two models, architects can adopt BIM data at early design stage to review analysis of BIM model. It should facilitate dynamic design based on rich BIM information from an early stage to a final stage.

The External BIM Reference Model Suggestion for Interoperability Between BIM and GIS (BIM과 GIS간 정보상호운용을 위한 외부 BIM 참조 모델 제안)

  • Kang, Tae Wook;Hong, Chang Hee;Hwang, Jung Rae;Choi, Hyun Sang
    • Spatial Information Research
    • /
    • v.20 no.5
    • /
    • pp.91-98
    • /
    • 2012
  • The purpose of the present study is to suggest the extern BIM reference model for interoperability between BIM and GIS. After we surveyed the research progress and usecases related to the interoperability to do this, we analyzed the architecture of the neutral model such as IFC, CityGML to identify the differences between these and expand CityGML model. By using this result, we proposed the external BIM reference model including the metadata which defines mapping rules from IFC to CityGML.

Study on Spatial Model Generation for BIM-based Apartment Maintenance History Management (BIM 기반 공동주택 유지보수 이력 관리를 위한 공간 모델 생성 연구)

  • Lee, Kwang-eon;Lee, Yun-Gu;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.3
    • /
    • pp.31-45
    • /
    • 2024
  • This study proposes a BIM-based space model generation framework for managing maintenance history in apartments. While BIM adoption in design and construction phases is increasing, its use in operation and maintenance remains limited, particularly in the continuous utilization of as-built BIM models. To address this, the study introduces a methodology for automated space model generation using DYNAMO, analyzing 1,875 maintenance records and long-term repair plans from two apartment projects over two years. The framework was applied to case projects, achieving a 100% space model creation rate for dedicated spaces and 108.91% for public spaces, proving its applicability. This suggests that the automated space model generation process proposed in this study is applicable. The significance of this study is that it presents a model transition framework for the operation and maintenance phase of the as-built BIM model. In addition, it is of research value that a simplified BIM space model is proposed to overcome the limitation of not being able to manage the history of each part in the current maintenance phase. This study can be utilized as a basis for future BIM guidelines applicable to operation and maintenance phases and delivery guidelines for as-built BIM models.

A Study for the Optimal Expression Level Definition of BIM Model in Construction Phase (시공단계 BIM모델의 적정표현수준 정의를 위한 기초 연구)

  • Noh, Hae-ra;Kim, Ji-yun;Lee, Da-un;Yun, Seok-heon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.378-388
    • /
    • 2016
  • As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.

BIM Model Generation at Building Level using Automated Scan-to-BIM Process - Focused on Demonstration of BIM Modeling for Gangwon Fire Service Academy - (Scan-to-BIM 자동화 기술을 활용한 건축물 단위의 BIM 모델 생성 - 강원소방학교 BIM 모델링 실증을 중심으로 -)

  • Park, Jun-Woo;Kim, Jae-Hong;Kim, So-Hyun;Lee, Ji-Min;Choi, Chang-Soon;Jeong, Kwang-Bok;Lee, Jae-Wook
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.53-62
    • /
    • 2021
  • The successful implementation of Scan-to-BIM automation depends on the entire process from scanning of buildings, including indoor facilities and furniture, to generating BIM models. However, the conventional Scan-to-BIM process requires a lot of time, manpower, and cost for the manual generation of BIM models including indoor objects. To solve this problem, this study applied a Scan-to-BIM automation process using a deep learning model and parametric algorithm to an existing building, Kangwon Fire Service Academy. To improve the accuracy of the BIM model, after object data was extracted from the scan data, the data was corrected according to actual object-specific conditions. As a result, the accuracy of the BIM model created by the proposed Scan-to-BIM automation process was 91% compared to the actual area of the construction drawings. In addition, it was confirmed that the BIM objects were automatically generated for 10 object classes.

A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on preconstruction adopting BIM - (건축 설계 BIM 모델의 시공단계 활용성 향상을 위한 BIM 운영 방안 제시 - 시공전단계 BIM 적용 사례를 중심으로 -)

  • Yoon, Su-Won;Kim, Seong-ah;Choi, Jong-Moon;Keum, Dae-Youn;Jo, Chan-Won
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.1-10
    • /
    • 2015
  • In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c