The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.
Kim, Beom-Jun;Kim, Seong-Ah;Kim, Byeong-Ju;Chin, Sang-Yoon
Journal of KIBIM
/
v.7
no.2
/
pp.44-55
/
2017
Recently, there has been a growing interest in the life cycle management field of buildings through the introduction of BIM. And as BIM application is expanded, BIM ordering guidelines and guidelines are becoming popular. Also, as diverse forms of buildings including super high-rise building have been generalized, attention to the importance of curtain walls that are advantageous for construction period shortening, building lighting and quality homogenization has been increasing. However, all BIM information from the design stage to the maintenance stage is not accumulated in stages. And the input information is not improved in proportion to the level of appearance of the BIM model. Also, current curtain wall designs rely heavily on curtain wall consulting firms or utilize accumulated data from existing processes. In this study, curtain wall components, shape and property information were derived by analyzing BIM guidelines and curtain wall construction standards to contribute to solving these problems. And the curtain wall smart BIM library which can be converted according to LOD(Level of Development) has been produced and its applicability has been verified. Through the library, curtain wall information can be systematically managed in the library from design to construction and maintenance. And the library will contribute to the expansion and activation of the BIM library market in the future.
Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
Korean Journal of Construction Engineering and Management
/
v.20
no.1
/
pp.22-31
/
2019
The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.6
/
pp.567-576
/
2017
The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.
Jo, Yong-Hyun;Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
Journal of KIBIM
/
v.6
no.2
/
pp.1-11
/
2016
In South Korea, there have been attempts to enhance BIM work practices in various aspects. Public Procurement Service(PPS) has recently published 'basic guidelines to improve BIM work practices in construction and facility management'. It defines roles and responsibilities of project members in their application of BIM. It also developed a set of modelling standards and guidelines for effective model creation, management and communication among BIM users. Moreover, numerous construction companies have tried to cultivate BIM specialized manpower throughout entire construction phases. However, there are still challenges faced by firms during BIM adoption. Therefore, this study aims to provide practical counsel for construction companies to help them create optimized facilities and deliver high performance by analyzing BIM-based domestic construction projects in Korea from 2009 and 2015. The study will investigate types of client, project, BIM application range, and application technology.
In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.
Korean Journal of Computational Design and Engineering
/
v.20
no.3
/
pp.269-280
/
2015
Although BIM has been recognized as one of the main streams that advance the construction industry worldwide, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines that enhance design quality. Such problems cause designers, constructors, and project owners to hesitate applying it to their business. The main objective of this research is to develop a BIM guide for public project owners that is to be usable at the design phase of the public projects. To meet the objective, the study invited 10 BIM experts from Korean construction industry and operated workshops with focus group interview methodology. As well, a number of BIM guidelines from the BIM advanced countries were reviewed to identify valuable contents for the guide. There are four main parts in the guide developed: BIM design procurement process guide, Request for Proposal development guide for BIM design, BIM execution plan development and evaluation guide, and BIM output and deliverables review and evaluation guide.
International conference on construction engineering and project management
/
2011.02a
/
pp.88-92
/
2011
Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.
Recently, Building Information Modeling(BIM) has become a hot topic in the construction industry such as quantity calculation, interference check, process management, and construction cost management. It is also trying to convert the existing 2D design to 3D design and introduce the BIM in various fields, thus, many new deliverable are being presented but there are many issues due to the lack of standard guides on the preparation and delivery criteria for such new deliverable and how to utilize performance data. Therefore, In order to develop the electronic delivery process, we analyzed the process related to the delivery of BIM digital models presented in domestic and international BIM guidelines and the delivery of products from the Korea National Railway. The analysis focused on the list of achievements, delivery process, quality review standards, and the utilization code system of the Korea National Railway through BIM guidelines and the National Railroad Service's business procedures. Based on these analysis results, it presents a plan to construct an functional module of electronic delivery.
BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.