• 제목/요약/키워드: BIM database

검색결과 65건 처리시간 0.029초

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • 제2권1호
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

Evaluating Effectiveness of BIM-based Idea Bank during VE Workshop

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.650-651
    • /
    • 2015
  • Value Engineering has been recognized as one of the construction management techniques for improving the value and benefits of whole project. However, due to the lack of the past data and inefficient free-thinking techniques, the idea generation during VE workshop is still inefficient and ineffective. Even though various studies related to theoretical methodology and technical systems relevant to database were conducted, VE team still mainly rely on their experience for idea generation. With this regard, this study suggests an approach of BIM-based idea bank and assesses its effectiveness by interviewing 20 VE experts in the industry. This approach covers the three steps of idea generation, consisting of 1) Developing BIM based VE database, 2) Generating VE ideas, 3) Updating VE ideas. The result showed that the proposed approach has great potentials to support VE team and improve the quality of VE ideas during creativity phase.

  • PDF

사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축 (Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study)

  • 조영상;배준서;김유리
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2009년도 정기 학술대회
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF

BIM 기반의 철골접합부 모델링 자동화에 관한 연구 (A Study on the Automation of the Connection modeling for Steel Structures based on BIM)

  • 엄진업;신태송
    • 한국강구조학회 논문집
    • /
    • 제22권1호
    • /
    • pp.99-108
    • /
    • 2010
  • 본 연구는 구조상세설계와 모델링 단계에서 활용 가능한 철골 접합부 모델링 자동화 모듈의 개발을 목적으로 한다. 이를 위해 접합부의 구조해석 결과를 3D 모델링의 입력 변수와 표준접합상세지침을 고려하여 라이브러리 D/B로 구축하였다. 구축된 라이브러리 D/B를 접합부 3D 모델링 단계에서 활용하기 위하여 상용 S/W에서 제공하는 OpenAPI 함수를 이용하여 접합부 자동 생성 모듈을 개발하였다. 개발된 모듈을 검증하기 위해 6층 규모의 철골 오피스 구조물을 대상으로 접합부 모델링을 수행하였으며, 접합부 모델링 과정에 대해 기존 프로세스와 연구 프로세스의 비교를 통해 적용성과 효율성을 검증하였다.

BIM기반 설계 품질검토 자동화를 위한 건축 관련 법규문장의 객체 및 속성 표현에 대한 체계화 접근방법 (Application of Classification of Object-property Represented in Korea Building Act Sentences for BIM-enabled Automated Code Compliance Checking)

  • 신재영;이진국
    • 한국CDE학회논문집
    • /
    • 제21권3호
    • /
    • pp.325-333
    • /
    • 2016
  • This paper aims to classify objects and their properties represented in Korea Building Act sentences for applying to BIM-enabled automated code compliance checking task. In order to conduct automated code compliance checking, it is necessary to develop translation process of converting the building act sentences into computer-executable forms. However, since Korea building act sentences are written in natural language, some of requirements are ambiguous to translate explicitly. In this regard, the building act sentences regarding building permit requirements are analyzed focusing on the regulation-specific objects and related properties representation from noun phrases within the scope of this paper. From 1977 building act sentences and attached reference regulations, 1200 regulation-specific objects and about 220 related properties are extracted and classified. In the application for the classification, object-property database is implemented and some of application using the database and the regulation-specific classification is suggested to support to generate rule set written in computable codes.

시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로 (Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System)

  • 원지선;조근하;주기범
    • 설비공학논문집
    • /
    • 제25권4호
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

BIM 기술 기반 PMIS 개발에 관한 실험적 연구 (A Study on the Development of the Pilot Test Model to Examine the Applicability of the BIM Technology to PMIS)

  • 최정민;옥종호;김성근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.315-320
    • /
    • 2008
  • 건설프로젝트에서 발생하는 정보의 양이 방대해짐에 따라 프로젝트 관리에 있어서 정보시스템의 역할이 점점 커지고 있다. 최근 건설프로젝트관리를 위한 효율적 의사결정 지원도구인 PMIS (건설사업관리정보시스템)가 다양한 프로젝트에 적용되고 있으나 그 활용정도가 저조한 실정이때 보다 효율적으로 프로젝트를 관리할 수 있는 시스템 개발이 요구되고 있다. 건설정보화의 발전단계 측면에서 살펴보면 2D 기반에서 3D 기반으로, 최근에는 BIM 기술로 발전되어 가고 있으며 BIM기술을 접목한 PMIS의 개발이 연구대상으로 부상하고 있다. 본 연구에서는 BIM 기술기반의 PMIS 개발을 위한 Pilot Test 모델을 제시하고 그 활용성을 검토하기 위한 프로세스를 제시하여 향후 BIM 기반의 PMIS 발전방향을 모색하고자 한다.

  • PDF

클라우드 BIM 기반 의료시설 설계지원 시스템 구축에 관한 연구 (A Study on The Construction of Cloud BIM-based Medical Facility Design Support System)

  • 정성호;이병수;최윤기
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.39-46
    • /
    • 2019
  • In the 21st century, medical facility projects are required to operate appropriate digital technologies as the development of technology and the interests of various participants become more complex. In order for architects to successfully lead negotiations among various stakeholder groups, it is necessary to plan for effective communication through appropriate design reflecting their opinions and coordination of conflicts. For this purpose, building information modeling (BIM), which is a method of designing based on knowledge information related to medical facilities in the building database, can respond to change of order promptly and minimizes the occurrence of design errors can do. Recently, BIM technology and cloud computing technology in ICT have been combined and research on cloud BIM has been actively carried out. The use of cloud computing technology in BIM-based healthcare facility projects can effectively support decision making among project participants and has the advantage of sharing and collaborating on various forms of information generated during the design process, regardless of location and time. Therefore, the purpose of this study is to build of system that can support the design of medical facility using cloud computing technology in BIM.

최근 BIM 관련 R&D 동향 조사 연구 (A Study on Current R&D for BIM)

  • 이도윤;이준복
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2015
  • For the past three years, the importance of automatic research has been increased. It was proved in previous research that the number of conducted research using 'Database' technique was the largest, but the amount of increase was the largest in research on 'BIM'. In consequence, it is predicted the research on 'BIM' will become a center of automation in construction. Therefore, the purpose of this paper is to examine trends though classifying into each construction phase and developed extent of techniques related to professionalization and integration with other techniques within a range of 'Automation in Construction Journal' which has the biggest level of awareness in construction field.

  • PDF

BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구 (A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation)

  • 김성아;박권;송병섭;최철호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.56-65
    • /
    • 2016
  • BIM 적용으로 인해 비용절감 효과를 얻은 사례가 많은 학회, 보고서, 세미나 등을 통해 보고되고 있다. 이러한 사례에서는 BIM을 적용하여 재작업 및 재시공방지와 같은 직접적인 비용 절감 효과를 얻을 수 있다고 언급하고 있다. 또한 작업시간 단축, 업무 생산성 향상과 같이 비용으로 환산할 수 없는 효과도 존재한다. 국내외 BIM 사용자들은 BIM 적용으로 인한 비용절감에 관한 잠재적인 가치가 있다고 판단하고 있다. 그러나 아직까지 국내에서는 BIM 적용으로 인한 뚜렷한 경제적 가치(ROI)가 드러나지 않고 있으며, 국내 BIM 사용자들도 경제적 성과에 대해서 부정적인 반응을 보이고 있다. 따라서 본 연구에서는 경제적 가치로 환산하기 어려운 작업시간, 생산성 향상과 같은 BIM 적용 효과를 진단하고, BIM 적용 효과를 얻기 위해서 수반되어야 하는 것들은 무엇인지 살펴보고자 한다. 그리고 본 연구는 건설 프로젝트 생애주기 동안 다양한 분야에 적용될 수 있는 BIM의 적용효과를 견적분야를 대상으로 조사하였다. 본 연구는 동일한 프로젝트를 대상으로 기존 견적과 BIM 견적에서의 작업시간을 비교하였다. 그 결과 기존 견적과 같이 BIM 견적에서 작업속도 및 생산성을 향상시키기 위해서는 실무자들의 BIM 교육, 모델링 작업 기준, BIM 연동 내역서가 필요한 것으로 드러났다.