• 제목/요약/키워드: BIM RFI

검색결과 4건 처리시간 0.018초

시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계 (Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site)

  • 이승원;엄익철;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제14권1호
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석 (Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase)

  • 함남혁;여옥경;지규현
    • 한국BIM학회 논문집
    • /
    • 제8권3호
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석 (Performance Analysis of BIM Labor using Case Analysis)

  • 김형진;유무영;김재준;최창식
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

시공단계 BIM 적용에 의한 재시공 방지 효과분석 (Analysis of BIM Impact on Preventing Rework in Construction Phase)

  • 이명도;차민수;이웅균
    • 한국건축시공학회지
    • /
    • 제18권2호
    • /
    • pp.169-176
    • /
    • 2018
  • 본 연구는 시공단계에 적용된 BIM이 재시공 방지에 기여한 효과를 분석하는 것을 목적으로 하였다. 기존 연구에서는 다양한 방법으로 BIM에 대한 적용효과를 제시하고 있으나 보다 현실적이고 신뢰성 있는 분석 방법론이 요구되고 있다. 이에 본 연구에서는 현장 실무자를 대상으로 BIM 효과분석에 대한 요구사항을 수집하고, 이를 반영한 BIM 효과분석 방법론을 제시하였다. 사례 연구를 통해 제시한 방법론을 기반으로 재시공 방지 효과를 분석하였다. 사례현장에서는 BIM 적용을 통해 약 370,519,593원의 재시공 방지 효과가 있는 것으로 분석되었다. 또한 현장 실무진을 대상으로 본 연구에서 제시한 방법론 및 효과분석 결과에 대한 적합성을 자문하였으며 충분한 신뢰성이 있는 결과인 것으로 확인하였다. 본 연구의 결과물은 향후 BIM 성과측정 연구에 효율적인 기초자료로 활용될 수 있을 것이다.