Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

Analysis of BIM Impact on Preventing Rework in Construction Phase (시공단계 BIM 적용에 의한 재시공 방지 효과분석)

  • Lee, Myung-Do;Cha, Min-Su;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.169-176
    • /
    • 2018
  • The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.