A Study on the Development of the Problem Improvement Directions in Enhancing 3D BIM Data Interoperability through IFC (사례분석을 통한 3D 상용 어플리케이션 기반 BIM 데이터의 상호연동성 개선방향에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.390-403
    • /
    • 2009
  • Construction industries have increasingly utilized Building information Modeling (BIM) technologies. Interoperability - the capability for BIM data to run from one computer application to another in the life cycle of a project - has become one of the principal research areas. Enhancing interoperability inevitably requires information structures that are standardized throughout the construction industries. As a candidate of the data exchange standard, Industry Foundation Classes (IFC) has been developed and several researches recently performed to measure its richness of digital data exchange. But doubts have been brought up whether IFC meets a sufficient level of interoperability since the research result revealed a number of cases of information misrepresentation and loss. This research presents the lessons learned from the interoperability tests of three widely used 3D design applications including Graphisoft's Archicad, Autodesk's Revit, and Bentley's Bentley Architecture. One building's architectural and structural design data were modeled with the three tools and exchanged through IFC respectively for interoperability test.

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

A Study on the Effective Calculation of Rebar QTO in the Early Design Phase through the Application of BIM Model (BIM 모델 활용을 통한 초기설계단계에서의 효율적인 철근물량 산출 방안 연구)

  • Lee, Jae-Cheol
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.5
    • /
    • pp.145-152
    • /
    • 2019
  • In this study, rebar QTO(Quantity Take-Off) was quickly produced from the BIM model prepared by Revit in the early design phase, and the available premium rates were quantitatively presented. For this purpose, the amount of rebar calculated using the BuilderHub, which specializes in calculating rebar QTO, was analyzed according to various factors such as member type, rebar diameter, building size, item type, and order length, and the effect of each factor on the rebar QTO was determined. In addition, the BIM model generated on Revit was used to establish parameters and processes required to produce rebar QTO, and proposed a rebar premium rate and a stirrup/hoop premium rate based on the BuilderHub output results. Through this study, it is expected that a rapid and efficient comparative evaluation of rebar QTO will be possible according to various structural design alternatives in the early design phase.

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

Landscape Object Classification and Attribute Information System for Standardizing Landscape BIM Library (조경 BIM 라이브러리 표준화를 위한 조경객체 및 속성정보 분류체계)

  • Kim, Bok-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.2
    • /
    • pp.103-119
    • /
    • 2023
  • Since the Korean government has decided to apply the policy of BIM (Building Information Modeling) to the entire construction industry, it has experienced a positive trend in adoption and utilization. BIM can reduce workloads by building model objects into libraries that conform to standards and enable consistent quality, data integrity, and compatibility. In the domestic architecture, civil engineering, and the overseas landscape architecture sectors, many BIM library standardization studies have been conducted, and guidelines have been established based on them. Currently, basic research and attempts to introduce BIM are being made in Korean landscape architecture field, but the diffusion has been delayed due to difficulties in application. This can be addressed by enhancing the efficiency of BIM work using standardized libraries. Therefore, this study aims to provide a starting point for discussions and present a classification system for objects and attribute information that can be referred to when creating landscape libraries in practice. The standardization of landscape BIM library was explored from two directions: object classification and attribute information items. First, the Korean construction information classification system, product inventory classification system, landscape design and construction standards, and BIM object classification of the NLA (Norwegian Association of Landscape Architects) were referred to classify landscape objects. As a result, the objects were divided into 12 subcategories, including 'trees', 'shrubs', 'ground cover and others', 'outdoor installation', 'outdoor lighting facility', 'stairs and ramp', 'outdoor wall', 'outdoor structure', 'pavement', 'curb', 'irrigation', and 'drainage' under five major categories: 'landscape plant', 'landscape facility', 'landscape structure', 'landscape pavement', and 'irrigation and drainage'. Next, the attribute information for the objects was extracted and structured. To do this, the common attribute information items of the KBIMS (Korean BIM Standard) were included, and the object attribute information items that vary according to the type of objects were included by referring to the PDT (Product Data Template) of the LI (UK Landscape Institute). As a result, the common attributes included information on 'identification', 'distribution', 'classification', and 'manufacture and supply' information, while the object attributes included information on 'naming', 'specifications', 'installation or construction', 'performance', 'sustainability', and 'operations and maintenance'. The significance of this study lies in establishing the foundation for the introduction of landscape BIM through the standardization of library objects, which will enhance the efficiency of modeling tasks and improve the data consistency of BIM models across various disciplines in the construction industry.

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

BUILDING INFORMATION MODELING (BIM)-BASED DESIGN OF ENERGY EFFICIENT BUILDINGS

  • Cho, Chung-Suk;Chen, Don;Woo, Sungkwon
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early during the design development stage. The application of BIM during building energy simulations has profoundly improved the energy analysis process and thus this approach has gained momentum. However, despite rapid advances in BIM-based processes, the question still remains how ordinary building stakeholders can perform energy performance analysis, which has previously been conducted predominantly by professionals, to maximize energy efficient building performance. To address this issue, we identified two leading building performance analysis software programs, Energy Plus and IES (IES ), and compared their effectiveness and suitability as BIM-based energy simulation tools. To facilitate this study, we examined a case study on Building Performance Model (BPM) of a single story building with one door, multiple windows on each wall, a slab and a roof. We focused particularly on building energy performance by differing building orientation and window sizes and compared how effectively these two software programs analyzed the performance. We also looked at typical decision-making processes implementing building energy simulation program during the early design stages in the U.S. Finally, conclusions were drawn as to how to conduct BIM-based building energy performance evaluations more efficiently. Suggestions for further avenues of research are also made.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.