• Title/Summary/Keyword: BIM 프로젝트

Search Result 162, Processing Time 0.016 seconds

Information Delivery Requirements of Steel Structure according the Structural Design Stages using IDM (IDM을 이용한 강구조의 구조설계 단계별 정보전달 요구 분석)

  • Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1467-1473
    • /
    • 2013
  • In construction project, it is important to exchange and share the digital information generated by their own professional softwares. So this paper analyzed the information delivery requirements of steel structure according the structural design stages using IDM methodology. For schematic design stage and detailed design stage, the structural design information to share in each design stages is abstracted by defining the PM, ER, and FP. The new ERs and FPs are proposed by defining the new property sets(Psets), suchlike bolt gauge line, weld, scallop, and cope, to complement the structural design information of $IFC2{\times}3$. Finally, the reasonability of the proposed new ERs, FPs are verified by applying them to represent the standard steel connection sample in detailed design stage. As a result, the structural design information of standard steel connection could be stored and managed sufficiently by using the proposed new ERs and FPs.

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF