• Title/Summary/Keyword: BIM 프로젝트

Search Result 165, Processing Time 0.022 seconds

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

An Analysis of BIM uptake in Each Phase of Modular Construction Projects in Korea (국내 모듈러 건축 프로젝트의 단계별 BIM 활용업무 분석)

  • Lee, Ung-Kyun;Lee, Myungdo
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.5
    • /
    • pp.133-140
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that could contribute to overcoming the crisis faced by the construction industry. However, BIM uptake in current modular construction projects is limited. Moreover, there are no specific guidelines to support decision-making regarding the application of BIM in modular construction projects. Therefore, this study aims to analyze the possibility for BIM uptake in each phase of modular construction projects in Korea. Initially, the literature detailing on BIM uptake cases in modular construction projects was reviewed. The detailed work and activities for each phase of a modular project were analyzed via a questionnaire targeting domestic modular experts, to derive items requiring improvement due to errors or changes occurring in the actual project. Ten realistic BIM uptake items were derived, reflecting the results of literature review and expert interviews. Then, the BIM uptake items in each phase were analyzed in terms of necessity and efficiency via a second questionnaire using five-point Likert scales. Finally, the BIM utilization index (BIM UI) of the BIM uptake items was suggested as a priority measure. As a result, the BIM UI of "3D coordination" (U2), "design authoring and reviews for off-site fabrication" (U3), and "detailed 3D modeling for off-site fabrication" (U4), were assigned the highest priority. The results of this study can be used as guidelines to support decision-making regarding the application of BIM in modular construction projects.

Delivery guideline composition and utilization plan for 4D CAD-based schedule management (4D CAD 기반 공정관리 성과품 납품 지침 구성 및 활용방안)

  • Kang, HyoJeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.5
    • /
    • pp.3-14
    • /
    • 2024
  • Recently, both nationally and internationally, various BIM guidelines have been developed. These guidelines present fundamental principles and standards for the application of BIM. However, practical BIM guidelines for the schedule management area in the construction phase are lacking, making it difficult to apply them effectively in practical work settings. In this study, performance-based delivery guidelines are presented for the key functionalities of 4D CAD systems, which are representative BIM tools used in the construction phase. To achieve this, a survey analysis was conducted to determine the prioritization of these functionalities. Based on the characteristics of the project, delivery guidelines were formulated to allow users to selectively utilize the guidelines at different levels. Furthermore, practical ways to utilize performance-based delivery guidelines for schedule management using 4D CAD were proposed, validating the usability of these guidelines. The research findings suggest that these guidelines for BIM functionality in schedule management can hold practical significance as the utilization of BIM in construction phases continues to increase.

Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

Geometry-to-BIM Mapping Rule Definition for Building Plane BIM object (건축물 평면 형상에 대한 형상-to-BIM 맵핑 규칙 정의)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.236-242
    • /
    • 2019
  • Recently, scanning projects have been carried out in various construction and construction fields for maintenance purposes. The point cloud generated by the scan results is composed of a number of points representing the object to be scanned. The process of extracting the necessary information, including dimensions, from such scan data is called paradox. The reverse engineering process of modeling a point cloud as BIM involves considerable manual work. Owing to the time-consuming reverse engineering nature of the work, the costs increase exponentially when rework requests are made, such as design changes. Reverse engineering automation technology can help improve these problems. On the other hand, the reverse design product is variable depending on the use, and the kind and detail level of the product may be different. This paper proposes the G2BM (Geometry-to-BIM mapping) rule definition method that automatically maps a BIM object from a primitive geometry to a BIM object. G2BM proposes a process definition and a customization method for reverse engineering BIM objects that consider the use case variability.

A study on the BIM Design Process in the Free-form Design Project: -Focused on the Dongdaemun Design Plaza(DDP) Project- (비정형 설계 프로젝트의 BIM설계 프로세스에 대한 연구 : -동대문 디자인 플라자(DDP) 프로젝트를 중심으로-)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.473-479
    • /
    • 2020
  • Since the 21st century a free-form building has been noticeably constructed. Now the definition "the monumental architecture is a free-form one." has come to be established. As a free-form building became a landmark of the city and a factor rising a value of the building all around the world, it is currently required to consider a more efficient design process. Therefore this research aims to learn approaches of the lasting free-form design process by considering the design process of Dongdaemun Design Plaza(DDP) designed by 'Zaha Hadid' that is a typical free-form building of Korea and the correlation between the design in the conceptual stage and the BIM(Building Information Modeling) design in practical stage.