• Title/Summary/Keyword: BIM 기반 정보 관리

Search Result 207, Processing Time 0.026 seconds

Integration of Extended IFC-BIM and Ontology for Information Management of Bridge Inspection (확장 IFC-BIM 기반 정보모델과 온톨로지를 활용한 교량 점검데이터 관리방법)

  • Erdene, Khuvilai;Kwon, Tae Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.6
    • /
    • pp.411-417
    • /
    • 2020
  • To utilize building information modeling (BIM) technology at the bridge maintenance stage, it is necessary to integrate large quantities of bridge inspection and model data for object-oriented information management. This research aims to establish the benefits of utilizing the extended industry foundation class (IFC)-BIM and ontology for bridge inspection information management. The IFC entities were extended to represent the bridge objects, and a method of generating the extended IFC-based information model was proposed. The bridge inspection ontology was also developed by extraction and classification of inspection concepts from the AASHTO standard. The classified concepts and their relationships were mapped to the ontology based on the semantic triples approach. Finally, the extended IFC-based BIM model was integrated with the ontology for bridge inspection data management. The effectiveness of the proposed framework for bridge inspection information management by integration of the extended IFC-BIM and ontology was tested and verified by extracting bridge inspection data via the SPARQL query.

Development and Utilization of Linked Data of Port Maintenance Information for Port Facilities Based on Port BIM Standards (항만 BIM 표준 기반 항만 유지관리 정보의 링크드데이터 구축 및 활용)

  • Shin, Jaeyoung;Moon, Hyounseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.501-510
    • /
    • 2023
  • The importance of using construction data is increasing in accordance with the recent trend in the smart construction. However, construction project and maintenance information is distributed on the web, and the existing BIM(Building Information Modeling) information exchange and linking method using IFC(Industry Foundation Classes) cannot support connection with BIM data and web resources. This study aims to establish the BIM-based port facility data integration system using linked data(LD) technology in order to integrate BIM and heterogeneous data in the port maintenance domain. To this end, the port BIM-based ifcOWL and port facility maintenance ontology were designed, and LD was built for the BIM and maintenance information of Busan New Port 2-1 Pier3, a BIM pilot project. In addition, service prototypes such as search, statistics and SPARQL(SPARQL Protocol and RDF Query Language) endpoint functions were implemented using the issued LD. The LD-based information utilization system is expected to improve the reusability of information by converting the existing closed information system into an open system and BIM and maintenance data as a web resource in a standard format.

BIM Application in Design Phase for Civil Engineering Project (토목공사의 설계단계 BIM적용에 대한 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Moon, Jin-Seok;Ann, Jae-Gyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.666-669
    • /
    • 2008
  • Recently, the application of building information model (BIM) is evaluated as one of important issues in construction market through the analyzed results in successful case studies. This study suggests an integrated information management model based on BIM through the problem analysis in existing information model for design phase. The application of suggested model is verified by a case study of bridge project. Those automatic and integrated information models for design phase can be used for an effective information management model through project life cycle.

  • PDF

A Development of BIM Planning Framework for BIM Based Collaboration (BIM 기반 협업을 위한 BIM Planning 체계 개발 - 가상건설 연구단의 CPLM 시스템 중심으로)

  • Yoon, Su-Won;Kim, Seong-Ah;Chin, Sang-Yoon;Choi, Cheo-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.369-374
    • /
    • 2010
  • 최근 건설 산업에서 BIM이 각광 받으면서, BIM 기반의 다양한 엔지니어링 기술 도입 및 프로세스 적용이 시도 되고 있다. 이중 BIM 기반의 프로젝트 운영을 위해서는 BIM의 데이터의 저장, 수정, 배포뿐만 아니라, 관련 주체간의 협업이 가능한 환경이 요구되고 있으며, 이러한 환경 구축을 위해 제조업에서 활용되고 있는 PDM(Project Data Management) 또는 PLM (Product Life-cycle Management) 시스템을 벤치마킹한 CPLM (Construction Project Life-cycle Management)과 같은 BIM 기반 협업 시스템이 등장하고 있다. 하지만 기존의 이러한 협업 시스템의 경우, 건설 프로젝트가 가지는 다양한 계약 방식, 관리 단계, 관련 정보의 체계 등에 대한 종합적 계획 없이 프로젝트의 각 참여 주체들의 기존 관리 방식을 도입함으로써, 당초 BIM 기술을 도입하여 달성하고자 하는 원활한 협업 환경을 구축하는데 한계를 가지고 있다. 따라서 본 연구에서는 최근 BIM 가이드라인의 도입 등에서 시도되고 있는 BIM Planning이라는 개념을 활용하여, BIM 기반 협업 시스템의 구축 이전에 BIM을 관리하기 위한 관리 구조, 방식, 데이터 체계 등을 효과적으로 계획하고, 이를 시스템에 반영시킴으로써 보다 효과적인 BIM 기반 협업 환경이 구축될 수 있는 체계를 제안하였다.

  • PDF

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

Application of BIM technologies for maintenance of subway structures (지하철 구조물 유지관리를 위한 BIM 기술 활용)

  • Shim, Chang-Su;Kim, Seong-Wook;Yun, Nu-Ri;Song, Hyun-Hye
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.91-94
    • /
    • 2011
  • 시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 설계, 시공, 유지관리 단계별로 효과적인 협업을 위한 유기적인 단일 모델이 요구된다. BIM기반의 지하철 터널 구조물의 유지관리를 위해 건설정보분류체계 및 이를 보안한 유지관리점검 표준분류체계를 적용한 정보모델을 개발하였다.

  • PDF

A Study on Development of Supporting System for Pre-design Phase based on BIM (BIM 기반 건축 기획단계 지원 시스템 개발에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.85-88
    • /
    • 2010
  • 건축 기획단계는 프로젝트 전반에 걸친 주요한 의사결정이 일어나는 부분으로 그 영향력에 비해 프로젝트 정보를 수집, 처리, 저장하여 관련 참여자가 정보를 재사용하거나 참고하여 새로운 의사결정을 수행하는 것이 미흡하다. 따라서 본 논문에서는 BIM을 활용하여 기획단계에서 발생한 정보들이 설계, 시공, 유지관리 단계에 이르기까지 전생애주기에 걸쳐 정보를 통합 관리할 수 있도록 BIM기반의 건축 기획단계 지원 시스템을 개발하고자한다. 선행연구 분석과 이론적 고찰을 통해 건축 기획단계를 정의하고 건축기획 BIM의 개념과 특징을 도출하였다. 이를 토대로 기획단계 BIM프로세스를 정립하여 BIM을 기반으로 건축 기획단계를 지원하는 프로토타입 시스템 VA-Cityplanner를 개발하였다.

  • PDF

Development Method of Open BIM Data for Facility Space Management (시설물 공간관리를 위한 개방형 BIM 데이터 구축 방안)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.321-322
    • /
    • 2015
  • 본 연구는 BIM의 최종 모델(As-built Model)이 BIM기반 유지관리 시스템(Facility Management System)에 활용되는 것을 전제로 하며 유지관리 분야 중 공간관리 분야에서 활용되는 BIM 모델을 구축하기 위한 방안을 제시한다. 연구의 최종 결과물인 BIM 유지관리 가이드라인은 향후 BIM 발주 지침에 반영되어 건설과정에서 구축된 BIM 정보를 유지관리 단계까지 지속적으로 활용하도록 유도할 것이라 기대한다.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.