Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

Information Delivery Requirements of Steel Structure according the Structural Design Stages using IDM (IDM을 이용한 강구조의 구조설계 단계별 정보전달 요구 분석)

  • Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1467-1473
    • /
    • 2013
  • In construction project, it is important to exchange and share the digital information generated by their own professional softwares. So this paper analyzed the information delivery requirements of steel structure according the structural design stages using IDM methodology. For schematic design stage and detailed design stage, the structural design information to share in each design stages is abstracted by defining the PM, ER, and FP. The new ERs and FPs are proposed by defining the new property sets(Psets), suchlike bolt gauge line, weld, scallop, and cope, to complement the structural design information of $IFC2{\times}3$. Finally, the reasonability of the proposed new ERs, FPs are verified by applying them to represent the standard steel connection sample in detailed design stage. As a result, the structural design information of standard steel connection could be stored and managed sufficiently by using the proposed new ERs and FPs.

Synthesis and Electrolyte Characterization of 1-Benzyl-3-butylimidazolium Hydroxide Ionic Liquid (1-Benzyl-3-butylimidazolium Hydroxide 이온성액체 합성 및 전해질 특성 조사)

  • Salman, Muhammad;Lee, Hye Jin
    • Applied Chemistry for Engineering
    • /
    • v.31 no.6
    • /
    • pp.603-606
    • /
    • 2020
  • A hydrophilic alkaline room temperature ionic liquid electrolyte (RT-IL) carrying hydroxide ion as an anion and 1-benzyl-3-butylimidazolium as a cation was synthesized. Electrochemical, physical and structural properties of the synthesized RT-IL were characterized using cyclic voltammetry, ionic conductivity, viscosity, thermogravimetric analysis (TGA), differential scanning calorimetry (DSC), FT-IR, and 1H-NMR measurements. High ionic conductivity and low viscosity characteristics comparable to 0.1 M KCl electrolyte solution were achieved for the RT-IL in addition to a wide electrochemical potential window of about 4.4 V. The results indicate that the RT-IL is promising for future applications as an alternative electrolyte to energy and environmental research fields.

A Study of Establishing the Development Strategy of Construction Project Management System Using SWOT Analysis (SWOT분석을 통한 건설사업관리시스템 개발전략 수립에 관한 연구)

  • Kim, SeongJin;Ok, Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.86-93
    • /
    • 2016
  • Information technology, such as IoT, Big Data, Drone, Cloud etc., is evolving every year. Information Society is changing Intelligence Society and Creative Society. A new Construction Projects Management System Roadmap is required because it is difficult to reflect the current IT environments based on the CALS(Continuous Acquisition & Life-cycle Support) master plan, which is performed to establish every five years since 1998. This study was prepared for the Roadmap with a focus on Construction Management System based on the 4th CALS master plan, which was performed to establish the 2012 year. To this end, the construction environment and several information systems were investigated and analyzed. The problems of the construction project information system were derived using SWOT analysis, the vision, goal, direction, strategy, main tasks, specific tasks, and timetable of the Construction Project Management System are presented. This roadmap is designed to be used as operational indicators of a future construction project management system.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.