• Title/Summary/Keyword: BIM기반 공정관리

Search Result 29, Processing Time 0.029 seconds

Development of 4D System Linking AR and 3D Printing Objects for Construction Porject (AR과 3D 프린팅 객체를 연계한 건설공사 4D 시스템 구성 연구)

  • Park, Sang Mi;Kim, Hyeon Seung;Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.181-189
    • /
    • 2021
  • In order to increase the practical usability of the virtual reality(VR)-based BIM object in the construction site, the difference between the virtual image and the real image should be resolved, and when it is applied to the construction schedule management function, it is necessary to reduce the image gap between the virtual completion and the actual completion. In this study, in order to solve this problem, a prototype of 4D model is developed in which augmented reality (AR) and 3D printing technologies are linked, and the practical usability of a 4D model linked with two technologies is verified. When a schedule simulation is implemented by combining a three-dimensional output and an AR object, it is possible to provide more intuitive information as a tangible image-based schedule information when compared to a simple VR-based 4D model. In this study, a methodology and system development of an AR implementation system in which subsequent activities are simulated in 4D model using markers on 3D printing outputs are attempted.

Analysis of Guidelines and Ordering Cases for BIM Deliverable Delivery System Development in Road Sector (도로분야 BIM 성과품 납품체계 개발을 위한 국내외 지침 및 발주사례 분석)

  • Seo, Myoung-Bae;Kim, Jin-Uk;Choi, Won-Sik;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5897-5905
    • /
    • 2013
  • In spite of advantage by using BIM as quantity take-off, schedule control and clash check, absence of guidelines is a barrier to applying BIM to road domain. In this research, domestic and overseas cases of BIM guideline are analyzed in order to develop the road BIM deliverable submission system. The analysis is classified 5 topics which are BIM submit product list, submit files format, availability of existing 2D based products, BIM authoring tools and submit process. As a result, It needs a lot of effort to standardize BIM delivery system for road domain because BIM submit product list and BIM authoring tools are changable depending on BIM use cases. However, submit files format and submit process are common part to suggest guidelines of road BIM delivery system. It requires to combine BIM and 2D products for road BIM delivery system because delivery products are not exactly alternative 2D based delivery products for the present. The authors expect this research to use as basic data for development of the BIM deliverable submission system in road domain.

Development of the Rebar Auto Placing System Using 3D Structural Information Model (3차원 골조정보모델을 이용한 철근배근 자동생성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong;Kim, Gye-Joong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.72-75
    • /
    • 2009
  • 본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

Risk Management for Environment Protection in Job Site Utilizing BIM Method (BIM을 활용한 현장시공의 친환경 위험관리에 관한 연구)

  • Li, Teng;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.111-114
    • /
    • 2010
  • With the rise of green technology, the environmental question causes people’s attention more and more, based on objective of the sustainable development, the green risk has already begun to appear. In the paper the definition of the green risk of construction project is given, it analyzes and identifies the green risk of construction project from three aspects, based on BIM, the relation with green risk was found. Though the relation, the management of green risk was analyzed and we may take some measures to reduce the unnecessary risk and waste.

  • PDF

Assessment of the Educational Effects through the Building Information Modeling for the Establishment of the Wartime Relocatable Military Facilities (전시 이동형 군사시설 구축을 위한 BIM의 교육효과 분석)

  • Kim, Tae-Hui;Ahn, Sung-Jin;Park, Jang-Kweon;Kim, Heung-Bin;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.545-550
    • /
    • 2014
  • The re-locatable military facilities are significant in combat zones with limited infrastructures. Military tents are particularly one of the most essential components in the battlefields, During the offensive operation. This study assesses educational effectiveness of the 4D Building Information Modeling (BIM), which is used to deliver educational information with considering re-locatable military facility construction. Furthermore, the real time for constructing temporary concentration camp was measured, By using analysis of variance associated with the educational effects of the 4D BIM. Statistically, understandability of facility construction using 4D BIM was found to be higher than the conventional educational materials with field manual.

The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM (BIM 도입 후 설계사무소 실무자들의 직무스트레스 분석)

  • Seo, Hee-Chang;Oh, Jung-Keun;Kim, Jea-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.120-131
    • /
    • 2012
  • Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

Simulation based Target Geometry Determination Method for Extrinsic Calibration of Multiple 2D Laser Scanning System (다중 2D 레이저 스캐너 시스템의 외부 표정요소 캘리브레이션을 위한 시뮬레이션 기반 표적 배치 결정 기법)

  • Ju, Sungha;Yoon, Sanghyun;Park, Sangyoon;Heo, Joon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.443-449
    • /
    • 2018
  • Acquiring indoor point cloud, using SLAM (Simultaneous Localization and Mapping) based mobile mapping system, is an element progress for development of as-build BIM (Building Information Model) for the maintenance of the building. In this research we proposed a simulation-based target geometry determination for extrinsic calibration of multiple 2D laser scanning mobile system. Four different types of calibration sites were designed: (1) circle type; (2) rectangle type; (3) double circle type; and (4) double rectangle type. Based on the measurement values obtained from each simulated calibration site geometry, least squares solution based extrinsic calibration was derived. As a result, the rectangle type geometry is most suitable for extrinsic calibration of this system. Also, correlation values between extrinsic calibration parameters were high, and calibration results were distinct according to the calibration sites.