• Title/Summary/Keyword: BIM(Building Information Modeling) Project

Search Result 292, Processing Time 0.021 seconds

Advanced Sensor-based Building Information Modeling (BIM) for Construction, Operation, and Maintenance Phases of the Project Lifecycle (시공 및 유지관리 단계에서 활용 가능한 단센서 기반의 BIM 구축을 위한 기초연구)

  • Cho, Minwoo;Son, Hyojoo;Kim, Changmin;Lee, Joohyuk;Kim, Changwan
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.7-17
    • /
    • 2012
  • In recent years, building information modeling (BIM) has been an important issue within the architect, engineering, and construction (AEC) industry. BIM provides a way to share and exchange semantically rich information about the buildings in order to achieve a successful level of collaboration, communication, and interaction between stakeholders throughout the life cycle of the project. However, despite the recognition of its potential, BIM has not yet been utilized in the construction, operation, and maintenance stages because of the need to reorganize the BIM by reflecting the as-built status of the buildings. In order to improve and increase the use of BIM at all phases of a project, several research efforts are exploring the creation of an as-built BIM that is based on advanced sensors. However, there is a lack of literature and investigation on this research area to date within the domestic AEC industry. The aim of this study is to suggest ways in which BIM can be utilized within the construction, operation, and maintenance stages based on advanced sensors so that it is an approach that might be usefully carried forward. This paper begins by presenting a review of the existing BIM research and achievement in order to determine the limitations of the use of BIM in the domestic AEC industry. Conclusively, this paper suggests a direction for the future applications of BIM and describes how it can benefit from additional research.

Preliminary Study on the utilization of BIM in modular building construction (모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구)

  • Lee, Myung-Do;Lee, Chan-Woo;Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Ung-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5 (대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언)

  • Seol, Un-Ho;Bae, Byung-Hoon;Park, Jong-Seo;Shin, Jae-Choul;Lee, Geun-Il
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

A Study on Collaborative Design System using Design Issue Modeling and Performance-oriented Design Service in CLOUD BIM based Design Process (CLOUD BIM 기반 설계 프로세스에서 설계정보의 구조화 및 성능지향적 설계서비스를 통한 협업설계 지원 방안)

  • Jung, Jae Hwan;Kim, Jin Wooung;Song, Yu Mi;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.6 no.1
    • /
    • pp.9-17
    • /
    • 2016
  • Building information modeling refers to combination or set of technologies and organizational solutions that are expected to increase collaboration in the construction industry and to improve the productivity and quality of the design, construction, and maintenance of buildings. For enhanced communication among project participants, various information which BIM model usually includes is provided, furthermore data which contain exchange of unstructured information is needed. If the extension of BIM standard file format for practical use of design Issue information about collaborative design process is fulfilled, the productivity and quality of design will be improved.

A Study of LOD(Level of Detail) for BIM Model applied the Design Process (설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구)

  • Cho, Hyun-Jung;Kim, Yeon-Soo;Ma, Young-Kyun
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.

An Analysis of Design Errors Detected During BIM-based Design Validation - Case Studies in South Korea (BIM 설계 검토를 통해 발견된 설계 오류 분석 -한국 BIM 프로젝트 사례 분석)

  • Won, Jongsung;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.158-159
    • /
    • 2016
  • This paper aims to analyze design errors prevented by building information modeling (BIM)-based design validation to identify consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 1,300 design errors detected by BIM-based design validation in three BIM-based projects in South Korea are categorized according to its causes, work types, and likelihoods to cause project delay and cost overrun. Each design error is analyzed by conducting face-to-face interviews with practitioners in the three projects.

  • PDF

Automated Safety Planning of Scaffolding-Related Hazards in Building Information Modeling (BIM)

  • Kim, Kyungki;Cho, Yong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.255-258
    • /
    • 2015
  • Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.

  • PDF

Proposal of Smart BIM Library Framework for Curtain Wall with different LOD on each project stage (프로젝트 단계별 LOD가 반영된 스마트 BIM 커튼월 라이브러리 체계 구축)

  • Kim, Beom-Jun;Kim, Seong-Ah;Kim, Byeong-Ju;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.44-55
    • /
    • 2017
  • Recently, there has been a growing interest in the life cycle management field of buildings through the introduction of BIM. And as BIM application is expanded, BIM ordering guidelines and guidelines are becoming popular. Also, as diverse forms of buildings including super high-rise building have been generalized, attention to the importance of curtain walls that are advantageous for construction period shortening, building lighting and quality homogenization has been increasing. However, all BIM information from the design stage to the maintenance stage is not accumulated in stages. And the input information is not improved in proportion to the level of appearance of the BIM model. Also, current curtain wall designs rely heavily on curtain wall consulting firms or utilize accumulated data from existing processes. In this study, curtain wall components, shape and property information were derived by analyzing BIM guidelines and curtain wall construction standards to contribute to solving these problems. And the curtain wall smart BIM library which can be converted according to LOD(Level of Development) has been produced and its applicability has been verified. Through the library, curtain wall information can be systematically managed in the library from design to construction and maintenance. And the library will contribute to the expansion and activation of the BIM library market in the future.

An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object (BIM 기반의 공간객체를 이용한 물량산출 정확성 분석)

  • Cha, You-Na;Kim, Seong-Ah;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.

A Study on Architectural Design of Elementary School Using Building Information Modeling(BIM) (Building Information Modeling(BIM)을 적용한 초등학교 설계에 관한 연구)

  • Cho, Jae-Keun;Jun, Han-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.3
    • /
    • pp.5-16
    • /
    • 2007
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. To do so, we model Sanggye elementary school project using BIM, and consider other efficient methods for the lack of the information caused by the traditional blueprint. In addition, we try to lay the groundwork for expanding the application of BIM during the life cycle of an educational facility through researching a system to set up an accurate building information.