• Title/Summary/Keyword: BAT-AEL

Search Result 5, Processing Time 0.022 seconds

Determination of the Best Available Techniques Associated Emission Level(BAT-AEL) (최적가용기법 연계배출수준(BAT-AEL) 설정)

  • Seo, Kyungae;Bae, Yeon Joung;Park, Jae Hong;Shin, Dong Seok;Rhew, Doug Hee
    • Journal of Environmental Science International
    • /
    • v.28 no.4
    • /
    • pp.455-464
    • /
    • 2019
  • BAT-AEL(Best Available Techniques Associate Emission Level) is the basis for establishing permissible emission standards for the workplace. Therefore, it is necessary to formulate a regulated BAT-AEL setting methodology that is generally applicable to all relevant industries. For the BAT-AEL settings, various factors should be considered such as the pollutants item, whether the workplace is subject to integrated pollution prevention and control, whether BAT is applicable, the basic data type, the emission classification system, and the suitability of the collected data. Among these factors, it is the most important factor to establish the classification system for the emitting facilities such that the emission characteristics of an industrial facility and its pollutants can be effectively reflected. Furthermore the target of the survey workplace should adhere to the BAT guidelines, even if it is a workplace that is subject to an the integrated environmental system. Certified data (SEMS, TMS, cleanSYS, WEMS, etc.) can be used to prioritize the classification system for the emission facility and the emission levels of pollutants. However, the self-measured data, daily logs, and questionnaire data from the workplace can also be used upon agreement of the relevant TWG. The collected data should only be used only when the facility is operating normally. Data that have been determined to be outliers or inappropriate validation methods should also be excluded. The BAT-AEL can be establish by adhering to the following procedure: 1) investigate all relevant workplaces with in the industry, 2)select workplaces for integrated management, 3)Identify BAT application, 4)identify whether BAT is generally applicable, 5)establish a classification system for emitting facilities, 6)collection available data, 7)verify conformity, 8)remove of outliers, 9)prepare the BAT-AEL draft, 10)deliberate, and 11) perform the confirmation procedure.

BAT-AEL Calculation in Waste Incineration Facility (폐기물 소각시설 최적가용기법 연계배출수준 (BAT-AEL) 설정)

  • Shin, Sujeong;Park, Jae-Hong;Lee, DaeGyun;Kim, Dai-Gon;Bae, YeonJoung
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.34 no.1
    • /
    • pp.144-155
    • /
    • 2018
  • As the public interest in environmental issues increased, the "Act On The Integrated Control Of Pollutant-Discharging Facility" was enacted. Through the integrated environmental pollution prevention act in which 19 industries with large environmental impacts are sequentially applied, pollutants can be managed in a medium-integrated manner and integrated permission of the business unit is possible and BAT can be applied to enable a scientific and proactive environmental management system. In addition, if the facility with BAT works normally, the pollutant emission is offered with the range of lower limit to upper limit. This study analyzed the overview of Best Available Techniques-Associated Emission Levels (BAT-AEL), and its setting procedure and method, and then suggested the BAT-AEL of a waste incineration facility. In comparative analysis on Emission Limit Values (ELVs) of EU, this study tries to propose improvement matters and development directions if the relevant standard is revised.

Understanding and Improvement of Best Available Techniques for Electricity and Steam Production Facility (전기 및 증기 생산시설 최적가용기법 (BAT) 기준서의 이해와 개선방향)

  • Shin, Sujeong;Park, Jae-Hong;Lee, DaeGyun;Kim, Dai-Gon
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.34 no.2
    • /
    • pp.281-293
    • /
    • 2018
  • As the public interest in environmental issues increased, the "Act On The Integrated Control Of Pollutant-Discharging Facility" was enacted. Through the integrated environmental pollution prevention act in which 19 industries with large environmental impacts are sequentially applied, pollutants can be managed in a medium-integrated manner and integrated permission of the business unit is possible and BAT can be applied to enable a scientific and proactive environmental management system. This study analyzed the overview of BAT reference documents(BREF), BAT setting procedure and method, and then suggested the development direction BAT and BAT-AEL monitoring method of a Electricity and Steam production facility.

Enhancing the Applicability and Improvement Direction of Integrated Environmental Permit System (통합환경허가시스템의 활용도 제고 및 개선방향)

  • Park, Jae Hong;Shin, Su Jeong;Lee, Dae Gyun
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.3
    • /
    • pp.339-345
    • /
    • 2018
  • The integrated environmental permit system is currently in operation online. It carries out various functions of postmanagement such as the submission of annual reports containing operations management data onto integrated management workplaces, the operation and management of emission facilities and prevention facilities, and the disclosure of information on the integrated permission. On the other hand, the integrated environmental permit system needs to perform various roles in order to stably manage and smoothly perform the permitting work. It is necessary to utilize this system to establish policies by using diverse operations management data onto integrated management workplaces collected in the integrated environmental permit system. This system can also play a role in improving the post-management system and user convenience after the permission review and approval processes. The integrated environmental permit system can be effectively used to set up the BAT-AEL because it collects all of the cross-media data and identifies the overall status of the workplace. In order to establish a post management system after the approval, it is necessary to provide performance management and performance evaluation functions as conditions of the permit after approval. In addition, a variety of support functions should be provided to enable the permission authority and the environmental expert examination agency to facilitate the review of permits. It will be necessary to provide an evaluation system and a proactive diagnostic function to determine whether permission conditions and permit emission standards will change in the future. Also, it is important to adopt an information exchange platform that can be used to collect the status data onto the workplaces; the platform can also be used as an information exchange site for technical working groups (TWG), and for collecting field experts' opinions.

Significance and Development of the Integrated Environment Management System Implementation (통합환경관리제도 시행의 의의와 발전방향)

  • Park, Jae Hong;Kim, Yong Seok;Lee, Won Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.3
    • /
    • pp.318-324
    • /
    • 2016
  • The significance of an integrated environmental management system implementation can be summarized into three sections. The first is that the paradigm of a permit system will be changed from the existing media-specific permits to cross-media permits. In the near future, the cross-media license will be granted based on the diagnostic results of the plant. The second is that it will be established through a social concensus, i.e., consultations with stakeholders and direct participation in the system design process of stakeholders. The third is that it will have flexibility in its operating system. In the near future, it will be possible to management an environment through its industrial workplace itself and determine if emission standards are being complied with or not through statistical methods. In addition there is also an urgent need for complementary parts in order to enhance the driving force of the integrated environmental management system which is based on transparency, reliability and flexibility. In other words, it is necessary to continuously promote in order to diffuse consensus and increase an understanding of implementation through an integrated environmental management system. It is also necessary to establish a new organization and educate authorized representatives so that they have the tools to smoothly perform the system.