• Title/Summary/Keyword: BASIN MANAGEMENT

Search Result 813, Processing Time 0.021 seconds

Extraction of Primary Factors Influencing Dam Operation Using Factor Analysis (요인분석 통계기법을 이용한 댐 운영에 대한 영향 요인 추출)

  • Kang, Min-Goo;Jung, Chan-Yong;Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.10
    • /
    • pp.769-781
    • /
    • 2007
  • Factor analysis has been usually employed in reducing quantity of data and summarizing information on a system or phenomenon. In this analysis methodology, variables are grouped into several factors by consideration of statistic characteristics, and the results are used for dropping variables which have lower weight than others. In this study, factor analysis was applied for extracting primary factors influencing multi-dam system operation in the Han River basin, where there are two multi-purpose dams such as Soyanggang Dam and Chungju Dam, and water has been supplied by integrating two dams in water use season. In order to fulfill factor analysis, first the variables related to two dams operation were gathered and divided into five groups (Soyanggang Dam: inflow, hydropower product, storage management, storage, and operation results of the past; Chungju Dam: inflow, hydropower product, water demand, storage, and operation results of the past). And then, considering statistic properties, in the gathered variables, some variables were chosen and grouped into five factors; hydrological condition, dam operation of the past, dam operation at normal season, water demand, and downstream dam operation. In order to check the appropriateness and applicability of factors, a multiple regression equation was newly constructed using factors as description variables, and those factors were compared with terms of objective function used in operation water resources optimally in a river basin. Reviewing the results through two check processes, it was revealed that the suggested approach provided satisfactory results. And, it was expected for extracted primary factors to be useful for making dam operation schedule considering the future situation and previous results.

Characteristics of Petroleum Geology of the Marine Basins in North Korea and Mutual Cooperative Plans for MT (Marine Technology) (북한 해양분지의 석유지질학적인 특징과 남북한 해양과학기술 협력 방안)

  • Huh, Sik;Yoo, Hai-Soo;Kwon, Suk-Jae;Oh, Wee-Yeong;Pae, Seong-Hwan
    • The Korean Journal of Petroleum Geology
    • /
    • v.12 no.1
    • /
    • pp.27-33
    • /
    • 2006
  • The possibility of oil reserve has been conformed because the oil has been produced by 450 barrel per day in the West Korea Bay basin of the North Korea. There is also possibility of giant oil reserve since it is geographically close to one of the biggest oil fields of Bohai Basin, China. Based on the on-going oil exploration and the present condition of investment, the areas of ongoing oil exploration are three: West Korea Bay B&C prospect explored by Swedish Taurus, the north of West Korea Bay and Anju basin explored by Canadian SOCO, and East Korea Bay explored by Australian Beach Petroleum. However, there is little or no possibility of oil reserve in the rest sea areas of three. Even though oil reserves were discovered in the some parts of land areas such as Kilju and Myungcheon, it was presumed to have no economical efficiency. Geology in West Korea Bay off the North Korea is similar to that in Bohai Bay off China. The basement consists of thick carbonate rock of the Late Proterozoic and Early Paleozoic overlain by Mesozoic ($6,000{\sim}10,000\;m$) and Cenozoic ($4,000{\sim}5,000\;m$) units. Source rocks are Jurassic black shale (3,000 m or more), Cretaceous black shale ($1,000{\sim}2,000\;m$), and pre-Mesozoic carbonates (several thousand meters). Reservoir rocks are Mesozoic-Cenozoic sandstone with high porosity and pre-Mesozoic fractured carbonate rocks. Petroleum raps are of the anticline, fault sealed, buried hill, and stratigraphic types. It absolutely needs to take up a positive attitude, the activation of ocean science and technology exchange, and the joint research and development of modern MT (Marine Technology) considering the state of establishing new international ocean order forcing on building up 200 nautical mile EEZ (exclusive economic zone) among coastal nations. Both South and North Koreas should extend the ocean jurisdiction and contiguity, and MT development dealing with the same sea areas. It is more urgent problem to find a way to have the North Korea participated in, and then to develop ocean management and ocean industry individually.

  • PDF

Comparison of rainfall-runoff performance based on various gridded precipitation datasets in the Mekong River basin (메콩강 유역의 격자형 강수 자료에 의한 강우-유출 모의 성능 비교·분석)

  • Kim, Younghun;Le, Xuan-Hien;Jung, Sungho;Yeon, Minho;Lee, Gihae
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.2
    • /
    • pp.75-89
    • /
    • 2023
  • As the Mekong River basin is a nationally shared river, it is difficult to collect precipitation data, and the quantitative and qualitative quality of the data sets differs from country to country, which may increase the uncertainty of hydrological analysis results. Recently, with the development of remote sensing technology, it has become easier to obtain grid-based precipitation products(GPPs), and various hydrological analysis studies have been conducted in unmeasured or large watersheds using GPPs. In this study, rainfall-runoff simulation in the Mekong River basin was conducted using the SWAT model, which is a quasi-distribution model with three satellite GPPs (TRMM, GSMaP, PERSIANN-CDR) and two GPPs (APHRODITE, GPCC). Four water level stations, Luang Prabang, Pakse, Stung Treng, and Kratie, which are major outlets of the main Mekong River, were selected, and the parameters of the SWAT model were calibrated using APHRODITE as an observation value for the period from 2001 to 2011 and runoff simulations were verified for the period form 2012 to 2013. In addition, using the ConvAE, a convolutional neural network model, spatio-temporal correction of original satellite precipitation products was performed, and rainfall-runoff performances were compared before and after correction of satellite precipitation products. The original satellite precipitation products and GPCC showed a quantitatively under- or over-estimated or spatially very different pattern compared to APHPRODITE, whereas, in the case of satellite precipitation prodcuts corrected using ConvAE, spatial correlation was dramatically improved. In the case of runoff simulation, the runoff simulation results using the satellite precipitation products corrected by ConvAE for all the outlets have significantly improved accuracy than the runoff results using original satellite precipitation products. Therefore, the bias correction technique using the ConvAE technique presented in this study can be applied in various hydrological analysis for large watersheds where rain guage network is not dense.

A Study of Impacts of Human Interference on the Gapcheon River Basin in Daejeon City (도시하천에 대한 인위적 간섭 특성 및 하천 관리 방안 - 대전시 갑천유역을 중심으로 -)

  • Kim, Doo-Il
    • Journal of the Korean association of regional geographers
    • /
    • v.14 no.1
    • /
    • pp.1-18
    • /
    • 2008
  • If there is no choice but to be urbanized, we should examine how human interference has had influences on the area to keep the river environment safe and stable. This study is aimed at finding improvement by examining the effect of human interference in Gapcheon river in Daejeon, which is developing fast. Distinctive features of human interference in Gapcheon river are followings. First, middle and upper reaches of Gapcheon river are being maintained and restored focusing on flood control but are scheduled to develop city and channel. Second, the rear area of middle and lower reaches of Gapcheon river is already developed into an urban district and solidified into artificial stream for leisure activities installing the artificial structure for fun. Third, lower reaches of Gapcheon river are in an unstable condition because of straightening waterway and developing rear area of river. Up to now, geographical features and bio-diversity of Gapcheon river has been ruined by the artificial management of river centered for technical engineering. From now on, followings should be considered for management of urban river. First, it is focused on maintaining eco system by itself than usage for human. Second, natural features of rear area of river should be taken into consideration and should be preserved before developing urban city and hills, back marsh, channel deposit and swamp to directly have an influence on river.

  • PDF

Assessment of the Locations for Carbon Monoxide Monitoring Stations in Daegu according to Emission Distribution (배출량 분포에 따른 대구시 일산화탄소 측정망 위치의 적절성 평가)

  • Kim, Hyo-Jeong;Jo, Wan-Kuen
    • Spatial Information Research
    • /
    • v.20 no.2
    • /
    • pp.25-34
    • /
    • 2012
  • Air quality in Daegu area is lower compared to many other cities, since Daegu is a basin surrounded by mountains. Accordingly, the present study investigated the location of carbon monoxide(CO) monitoring stations for systematic CO pollution management on the basis of the CO emission distribution in Daegu area. In order to achieve this purpose, the location of CO monitoring stations, which can be used for the establishment of CO management, were assessed. Emission map in Daegu area was prepared using numerical map and Clean Air Policy Support System(CAPSS) data supplied by the M inistry of Environment. Average emissions were estimated by dividing emission sources into four subgroups(roadway, apartment, industry, and municipal incineration facility) according to legal division. The CO emission intensities were subdivided into 10, which a high number represents a high emission intensity, and the current monitoring stations were evaluated for the determination of their steps in CO emission intensities. As a result, additional installation of monitoring stations were suggested for the high CO emission areas rather than the low CO emission areas. A systematic CO management strategy would be established by the supplying various principle CO data when the CO monitoring stations are additionally installed at Kukwudong and other six sites on the basis of analyses of data obtained from 1999 to 2007.

Water Quality Prediction and Forecast of Pollution Source in Milyanggang Mid-watershed each Reduction Scenario (밀양강 중권역 오염부하 전망 및 삭감 시나리오별 하류 수질예측)

  • Yu, Jae-Jeong;Yoon, Young-Sam;Shin, Suk-Ho;Kwon, Hun-Gak;Yoon, Jong-Su;Jeon, Young-In;Kang, Doo-Kee;Kal, Byung-Seok
    • Journal of Environmental Science International
    • /
    • v.20 no.5
    • /
    • pp.589-598
    • /
    • 2011
  • Milyanggang mid-watershed is located in downstream of Nakdong river basin. The pollutants from that watershed have an direct effect on Nakdong river water quality and it's control is important to manage a water quality of Nakdong river. A target year of Milyanggang mid-watershed water environment management plan is 2013. To predict a water quality at downstream of Milyang river, we have investigated and forecasted the pollutant source and it's loading. There are some plan to construction the sewage treatment plants to improve the water quality of Milyang river. Those are considered on predicting water quality. As results, it is shown that the population of Milyanggang mid-watershed is 131,857 and sewerage supply rate is 62.2% and the livestock is 1,775.300 in 2006. It is estimated that the population is 123,921, the sewerage supply rate is 75.5% in 2013. The generated loading of BOD and TP is 40,735 kg/day and 2,872 kg/day in 2006 and discharged loading is 11,818 kg/day and 722 kg/day in 2006 respectively. Discharged loadings were forecasted upward 1.0% of BOD and downward 2.7% of TP by 2013. The results of water quality prediction of Milyanggang 3 site were 1.6 mg/L of BOD and 0.120 mg/L of TP in 2013. It is over the target water quality at that site in 2015 about 6.7% and 20.0% respectively. Consequently, there need another counterplan to reduce the pollutants in that mid-watershed by 2015.

Current State of Occupational Health in Small-Scale-Enterprises of Korea (50인 미만 소규모사업장의 보건관리 실태)

  • Yun, Soon-Nyung;Kim, Young-Im;Jung, Hye-Sun;Kim, Soon-Lae;Yoo, Kyung-Hae;Song, Young-Sook;Kim, Hwa-Joong
    • Research in Community and Public Health Nursing
    • /
    • v.11 no.1
    • /
    • pp.90-104
    • /
    • 2000
  • This study was carried out to investigate the current state of occupational health management and characteristics of employees working in small-scale-enterprises (SSE) employing less than 50 workers. Samples were chosen among the two thousands employees working in 838 factories where located in Youngdungpo-Ku, Seoul, Korea. The study results were as followed: 1. Most factories investigated in the study were manufactures (68.6%) which were established in 5 to 10 years ago (29.2%), employing less than 5 workers (72.9%) and registered in accident compensation insurance (23.0%). 2. Health screening was undertaken in 24.9% workplaces for periodic health examination and in 1.5% for special health examination. Environmental monitoring was done in 3.3% factories. Very few factories displayed Material Substance Data Sheet (MSDS) in 3.1% among the total factories. 3. Workplaces usually had their own toilets in 75.9% and washing basin in 58.6% as types of sociowelfare facilities. 4. Employees responded in the study were mostly in the range of age from 30 to 39 in 34.7%. male in 84.8%. the married in 70.3%. manual workers in 42.0%. mostly working regularly 51 hours per a week in 48.2% and earned 710.000 Won to 1.000.000 Won per month in 35.0%. Medical utilization for employees were covered by factories sponsored medical insurance in 12.7% and by provincial sponsored medical insurance in 83.4%. 5. Two point six percents of employees were suffered by diseases. The health complaints indicated were mainly digestive problems in 46.7% and hypertension in 24.4%. 6. Employees wore personal protective equipments for work such as gloves in 48.1%. safety shoes in 30.5%. ear plug in 5.5% and mask in 6.9%. Based on the results of study, we recommend that various types of occupational health management should be developed according to workplace working condition of each factory. In addition to the development of occupational health strategies. we think that it is more important to monitor and to allocate how effectively they operate each other on the basis of longitudinal continuity. Besides, we would like to insist that these all management effort should be focused on prevention of disease and occupational health education of employees.

  • PDF

A study on the estimation of river water intake using the operating time of the pumping station (양수장의 가동시간을 이용한 하천수 취수량 산정방안 연구)

  • Baek, Jongseok;Kim, Chiyoung;Cha, Jun-Ho;Song, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.2
    • /
    • pp.89-96
    • /
    • 2020
  • Water management agencies under the Ministry of Environment produce and accumulate qualified basic data for major rivers. However, the integrated management of the river water has been weak since the artificial water circulation process, such as the intaking and drainage of agricultural water, has not been examined in the basin, which includes many agricultural land. In this study, a study was conducted on how the power usage method (operating time method) based on the running time can be applied and improved among indirect flow rate measurement methods used to investigate flow rates collected by the riverside for agricultural water purposes, and thus the resultant data of high reliability can be obtained at low cost. The operation time method is suitable for small-scale water pumping stations where it is difficult to secure real-time power supply data. The reliability of the data was verified through the correlation analysis with the actual flow rate, and it was found that the flow rate calculated by the operation time method reflecting the level of the stream to which the inlet of the pumping station is connected can be reasonably matched with the actual flow rate. In addition, it was confirmed that the investment cost at the time of initial installation of the facility was highly efficient by generating qualified flow data at low cost through comparison with direct flow rate measurement methods. If flow data is secured by applying the operation time method to large and small water farms located along the riverside, it is expected that more quantitative and integrated stream water management will be possible.

Economic Management of River Water Quality by Utilization of Self Purification-An Environmental Resource (환경자원의 자정능력 선용을 통한 경제적 하천 수질관리)

  • Koo, Ja Kong;Lee, Byung Kuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.7 no.3
    • /
    • pp.13-21
    • /
    • 1987
  • The object of this study was to evaluate the management alternatives with respect to the attainable water quality and total cost(construction+O & M cost) in order to devise a reasonable water quality management system. Joong Ryang-cheon stream located Seoul, Korea was taken as the study area, and dissolved oxygen concentration as the water quality index. Water quality simulation model QUAL2E and linear programming optimization technique were used for scientific and rational analyses. It was assumed that the improvement of water quality could be obtained by the treatment of major point sources where imaginary treatment plants were constructed. And by this, the relationship between total cost of the treatment plants and the stepwise improvement of water quality was studied. The result showed that 3.5mg/l of DO(=dissolved oxygen) level at best could be attained in Joong Ryang-cheon stream during summer. When the DO standard was set 3.0mg/l in the severely polluted regions, more than 5.0mg/l of DO level can be achieved by the construction of 4 treatment plants. Also, the cost comparisons showed that the uniform treatment method is economically inefficient(\$24.8{\times}10^8$) in comparison with the least cost method(\$22.9{\times}10^8$), and there is little difference between the least cost method and the the zoned treatment method(\$23.0{\times}10^8$) that is regarded as more equitable, which shows the characteristics of this basin.

  • PDF

Wastewater Flowrate Analysis of Drainage Basin for Application of Total Water Pollution Load Management System (수질오염총량관리제도 적용을 위한 도시유역의 하수발생량 분석)

  • Kwon, Jun-Hee;Park, In-Hyeok;Ha, Sung-Ryoung
    • Journal of Wetlands Research
    • /
    • v.11 no.1
    • /
    • pp.75-82
    • /
    • 2009
  • The regulation of emission concentration for stream water qualities doesn't control quantitative increase on pollution loads, it has limits for improvement of water qualities. Total water pollution load management system(TMDL) can control the total amount of pollutant in waste water which is allowed to assign and control the total discharged pollutant loads in a permissible level. When it comes to generated wastewater value of TMDL system, there is difference between calculated value based on individual pollutant unit load and observed value. Calculated sewer inflow, calculated sewer outflow, measured sewer inflow, and measured sewer outflow at dry season are $26,460.9m^3$/d, $17,778.6m^3$/d, $17,106.1m^3$/d and $19,033.9m^3$/d respectively, Calculated sewer inflow, calculated sewer outflow, measured sewer inflow, and measured sewer outflow at rainy season are $49,512.2m^3$/d, $18,628.7m^3$/d, $30,918.2m^3$/d, $19,700.7m^3$/d respectively. This result presents the necessity to acquire the precise observed data to fulfill the efficient TMDL system.

  • PDF